Gambar 3.15 Cantilever Retaining Wall PERMASALAHAN · PDF fileRENCANAKAN PENULANGAN DINDING...

5
Beton II Bab III - 28 3.3.3 TUGAS Gambar 3.15 Cantilever Retaining Wall PERMASALAHAN Gambar 3.16 Latihan Retaining Wall fc ' = 25 Mpa fy = 400 MPa D19 + D16 Ύ beton = 2400 Kg/m3 Ύ tanah urug 125 pcf 2000 Kg/m3 q allowable = 3 kcf 5 Kg/cm2 φ tanah = 30 degree 2750 750 500 3000 RENCANAKAN PENULANGAN DINDING PENAHAN TANAH DAN GAMBAR DISESUAIKAN DENGAN PERATURAN SNI 375 750 1875 250 4500

Transcript of Gambar 3.15 Cantilever Retaining Wall PERMASALAHAN · PDF fileRENCANAKAN PENULANGAN DINDING...

Page 1: Gambar 3.15 Cantilever Retaining Wall PERMASALAHAN · PDF fileRENCANAKAN PENULANGAN DINDING PENAHAN TANAH DAN GAMBAR DISESUAIKAN DENGAN ... Gambar 3.17 Contoh Hasil Penulangan. Beton

Beton II Bab III - 28

3.3.3 TUGAS

Gambar 3.15 Cantilever Retaining Wall

PERMASALAHAN

Gambar 3.16 Latihan Retaining Wall

fc ' = 25 Mpafy = 400 MPaD19 + D16

Ύ beton = 2400 Kg/m3Ύ tanah urug 125 pcf 2000 Kg/m3q allowable = 3 kcf 5 Kg/cm2φ tanah = 30 degree

2750

750 750

500 500

3000

RENCANAKAN PENULANGAN DINDING PENAHAN TANAH  DAN GAMBAR DISESUAIKAN DENGAN PERATURAN SNI 

375750 1875

250

4500

Page 2: Gambar 3.15 Cantilever Retaining Wall PERMASALAHAN · PDF fileRENCANAKAN PENULANGAN DINDING PENAHAN TANAH DAN GAMBAR DISESUAIKAN DENGAN ... Gambar 3.17 Contoh Hasil Penulangan. Beton

Beton II Bab III - 29

Pembahasan

1. Tetapkan dimensi ataupun data tanah Dinding Penahan Tanah

2. Tekanan Tanah lateral

3. Stabilitas terhadap Daya dukung tanah

4. Stabilitas terhadap Guling

5. Stabilitas terhadap Geser

6. Tentukan Gaya dalam lentur dan Geser

7. Tentukan tulangan

8. Gambar penulangan baik utama ataupun pembagi

9.

Gambar 3.17 Contoh Hasil Penulangan

Page 3: Gambar 3.15 Cantilever Retaining Wall PERMASALAHAN · PDF fileRENCANAKAN PENULANGAN DINDING PENAHAN TANAH DAN GAMBAR DISESUAIKAN DENGAN ... Gambar 3.17 Contoh Hasil Penulangan. Beton

Beton II Bab III - 30

3.3.4 EVALUASI

Gambar 3.18 Analisa Dinding Penahan Tanah

250 fc ' = 30 Mpafy = 400 MPaD19 + D16 Tangent Alp = 1/3

Ύ beton = 2400 Kg/m3Ύ tanah urug 125 pcf 2000 Kg/m3q allowable = 3 kcf 5 Kg/cm2φ tanah = 30 degree

2750

750

500

375 18753000

4000

5333,333 Kg/m'

2666,667 Kg/m'

3500

375

750 Ph =  Pb  x   H /3  x   cos alp

2000 X (4,0) X 0,33 = (8/3) 1000

32

4

51

Page 4: Gambar 3.15 Cantilever Retaining Wall PERMASALAHAN · PDF fileRENCANAKAN PENULANGAN DINDING PENAHAN TANAH DAN GAMBAR DISESUAIKAN DENGAN ... Gambar 3.17 Contoh Hasil Penulangan. Beton

Beton II Bab III - 31

meter

1 1875*3500 = 2000 6,5625 13125 937,5 0,9375 12304,68752 250*3500 = 2400 8,75 21000 2000 2 420003 1/2*125*3500 = 2400 0,21875 525 1166,667 1,166667 612,54 500*3000 = 2400 1,5 3600 1500 1,5 54005 750*750 = 2000 0,5625 1125 2500 2,5 2812,5

PvPh 5333,33

H  = 5333,33 KG 1333,333 1,333333 7111,11111V  = 39375 KG 70240,7986

Resultant gaya dari titik A x = 1,783893nilai  e  = B/2‐ x ‐0,28389 m

28,38933 cmB/6  = 50 cme < B/6 ; masih didalam bidang inti

Soil pressure at TOE OF BASEV/B  (   1+6E/B)   = 20577,2 Kg/m2

σ max = 2,05772 Kg/cm2 < 5,00 Kg/cm2

σ min = 0,56728 Kg/cm2Geser pada dasarpondasi

0,58 x V = 22837,54,28 > 1,5 tanpa meninjau geser pasiv tanah

LOAD  FACTOR = 1,7FACTOR REDUKSI KEKUATAN

LENTUR 0,8GESER 0,75

0,85 Fc'  mpa = 25,5Vc = 0,912871 bdFy  mpa = 400

ρ min 0,0035 ρ max 0,0244 ρ susut 0,002

dstnya

Ph 1,7 Kg/m' 53,3333 KN/m'Mn = Phx3,5/3/0,8 13222 Kgm/m' 132,22 kNmd' = 70 mmd = 180 mm jd  = 153 mmAs = Mn/(fyxjd) 2160,5 mm2Digunakan  D16‐100Vc = 0,912871 bd 164,32 KN/m' OK  > 53,333

50 100 150 200D13 113 2262 1131 754 565D16 201 4022 2011 1340 1005D19 284 5671 2635 1890 1418D22 380 1570 3140 2094 1571

DIA [1}JARAK as ke as

5333,3

NO  AREA γ FORCES kg ARM MOMENT

Design Parameter ; LOAD FACTOR  and    CONCRETE STEEL DATA

( ) fyfycf

b .600600..'.85,0 1

+=

βρ

bρρ .75,0≤

Page 5: Gambar 3.15 Cantilever Retaining Wall PERMASALAHAN · PDF fileRENCANAKAN PENULANGAN DINDING PENAHAN TANAH DAN GAMBAR DISESUAIKAN DENGAN ... Gambar 3.17 Contoh Hasil Penulangan. Beton

Beton II Bab III - 32

Gambar 3.19 Sketsa Penulangan Dinding Penahan Tanah

Distribusi gaya V dibagian ujung diasumsikan pada 1/3 lebar dasar plat ponsq max  = 39375 /3/3 m 39375Berat tanah =0,75*0,75*U43 1125Berat beton '=0,5*0,75*U42 900

500 mm 250Net tegangan di dasar 37350 KgGaya V 37350 Kg

373,5 kN d' (mm)= 50Vc = 410,7919 d  (mm)=  450

Gaya Mn= 13130,86 Kgm

131,3086 kNm mm2As = Mn/(fyxjd) 858,23Digunakan  D16‐200 (1005)

Berat tanah dibelakang dinding 7000Berat beton plat pons  1200Net pressure u design 8200 Kg/m

Vn = 20500 205 kNVc = 410,7919 OK

Mn  = 1/2 qL^2 14414,06 Kgm 1875

144,1406 kNm D16‐400As = Mn/(fyxjd) 942,096Digunakan  D16‐200 (1005) D16‐100

D16‐400

D16‐400Untuk tulangan pembagi disesuaikan dengan tulangan minimum/susut D16‐200digunakan D16 ‐ 400 D16‐400

D16‐200 D16‐400

3000

500

3500