F o C al h igh granularity R&D
description
Transcript of F o C al h igh granularity R&D
FoCal High granularity
R&DElena Rocco
NIKHEF – UTRECHT UNIVERSITY
CERN – ALICE WEEK, MARCH 2014
E. Rocco - FoCal meeting- ALICE week CERN 2
CERN TEST BEAMS 2014 WITH FOCAL PROTOTYPE
(LOW+HIGH LAYER GRANULARITY)We asked for 2 test beam periods:
1. PS: 2 weeks at T9 (mixed beams: e-, π) in September;
2. SPS: 1 week at H6 (high energy electron beam; mixed beams) in December.
PS-SPS schedule (preliminary)https://sps-schedule.web.cern.ch/sps-schedule/
March 26, 2014
E. Rocco - FoCal meeting- ALICE week CERN 3
FOCAL PRESENTATION & PUBLICATIONS 2014
Incoming conferences (up to now):- Quark Matter: poster accepted- TIPP2014: accepted contribution (speaker: T.
Chujo)- ICHEP 2014: contribution to be submitted
(spekear E. Rocco)- ….Past conferences:- ICTR-PHE 2014: poster (authors: D. Aadnevik, E. Rocco)(proton therapy)
March 26, 2014
E. Rocco - FoCal meeting- ALICE week CERN 4
HIGH GRANULARITY PROTOTYPE
March 26, 2014
E. Rocco - FoCal meeting- ALICE week CERN 5
UTRECHT CURRENT ACTIVITIES1.Data analysis and simulations ongoing on the previous data set (2012 PS &SPS data) -> problems on chips calibration
• calibration using clustersize for pion tracks• charge diffusion implementation
March 26, 2014
E. Rocco - FoCal meeting- ALICE week CERN 6
UTRECHT ACTIVITIES:
March 26, 2014
ER= 5,2%ER= 6,2%
A factor of 2 of difference
simulation
data
E. Rocco - FoCal meeting- ALICE week CERN 7
UTRECHT ACTIVITIES:2. Continuously data taking with cosmic data:
- noise calibration (done!)- noise time stability- complementing the info of the prototype for different threshold settings
March 26, 2014
to
Cosmic data before “calibration” Cosmic data after “calibration”
E. Rocco - FoCal meeting- ALICE week CERN 8
UTRECHT ACTIVITIES:
March 26, 2014
Uniformity within the layer, missing channels
E. Rocco - FoCal meeting- ALICE week CERN 9
UTRECHT ACTIVITIES:
March 26, 2014
What about the cluster size for tracks?
E. Rocco - FoCal meeting- ALICE week CERN 10
UTRECHT ACTIVITIES: 3. Alignment is important to properly estimate the shower shape (lateral)
March 26, 2014~40 μm spatial resolution, but it is just first iteration
Before alignment
After alignment
E. Rocco - FoCal meeting- ALICE week CERN 11
TEST BEAM AT DESY – FEBRUARY 2014Parasitic beam users, nevertheless in 1 week of data taking (mostly night shifts) we collected enough statistics for the following energies:- 2, 3, 4, 5(just few runs) and 5,4 GeV- At 2 GeV 3 different threshold settings (low, standard,
high)
Participants: Bergen group: S. Yang, D. Joshi, D. AadnevikUtrecht group: G-J Nooren , T. Van Brink, M. Reicher, C. Zhang, H. Wand, M. Dietze, M. Mohammadi, E. Rocco.
March 26, 2014
E. Rocco - FoCal meeting- ALICE week CERN 12
SOME SHOWER EXAMPLES AT 5.4 GeVFront view
March 26, 2014
E. Rocco - FoCal meeting- ALICE week CERN 13
SOME SHOWER EXAMPLES AT 5.4 GeV
Side view
March 26, 2014
E. Rocco - FoCal meeting- ALICE week CERN 14
HITS DISTRIBUTION SCAN IN ENERGY
March 26, 2014
E. Rocco - FoCal meeting- ALICE week CERN 15
LONGITUDINAL PROFILE (2 VS 5.4 GEV)
Still problems with missing channels/chips
Layer 5 (missing channels)
March 26, 2014
E. Rocco - FoCal meeting- ALICE week CERN 16
VERY CLOSE LOOK TO THE SHOWER
March 26, 2014
E. Rocco - FoCal meeting- ALICE week CERN 17
CONCLUSIONSFoCal prototype will be tested at CERN at PS and SPS.
Current activities on the digital prototype:• The digital prototype has been tested at DESY with new
chip settings and preliminary results show improved performance (ongoing analysis).
• Analyses of the previous data: ongoing• Chip software alignment procedure: ongoing • Simulations studies: ongoing
Future activity:Test beam at CERN at the SPS
Presentation of the FoCal performance at several conferences
March 26, 2014