Transcript of Duct Bank Reinforceemnt -17.09.15
5 - 25M
10M @ 400mm c/c
10M @ 400mm c/c
545
730
5 - 25M
Duct bank reinforcement Details for 6- 125mm duct:
Reinforcement for duct bank shall be provided as the figure below:
Plan showing location for 6-125mm duct bank.
Maximum settlement or deflection calculation:
Sc= Settlement of clay soil
Cc= Compression Index
eo= initial void ratio
H= Thickness of clay layer
σo= Initial Over burden pressure
Δσ= Extra pressure due to new construction.
Wl= Liquid limit = 60% (assumed)
W= water content =50% [assumed]
S= Saturated condition=1.0 [assumed]
G= Specific Gravity of soil= 2.7 [assumed]
Live load Calculation:
The pressure transmitted to the pipe from highway load, WL= 8600 N/m (Considering AASHTO
HS20 Loading.
This load has been considered for depth 2.3m.
Impact load:
Impact load factor is considered 1.0. (For more than 3 ft depth for Highway road as per AASHTO)
Self weight of the duct bank:
Duct bank self weight= 23.55x (0.730x0.550-6x0.781x.1252) =7.73 kN/m
Initial Over burden pressure, σo
σo=ɣsatxH/2=16.9x2.3/2=19.43 kN/m2
Extra pressure due to new construction:
545
730d1
d1
Settlement of soil/ deflection of duct bank:
Moment calculation for duct bank:
Δmax=17mm,
=20163 MPa
Moment of inertia for duct bank section,
=9.13x10-3 m4
Length of the deflection l=12m
Longitudinal reinforcement Calculation for duct bank:
Provide 5 nos 25M for both top and bottom
Shear Force for duct bank:
5 - 25M
10M @ 400mm c/c
10M @ 400mm c/c
545
730
5 - 25M
Shear streess on the section,
Shear resistance by the concrete,
Compressive strength of the concrete 21 MPa.
So transverse reinforceemnt is not required.
Mimimum transverse reinforceemnt ,
Yield strength of transverse reinforcement= 400 MPa
Spacing of transeverse reinforceemnt = 400mm
Withd of the section, bw= 730mm
Summary of the duct bank design:
Compressive strength of concrete, =21 MPa
Yield strength of longitudinal and transverse reinforcement= 400 MPa
Longitudinal Reinforcement= 5 Nos 25 M on top and bottom of the duct bank section
Transverse reinforceemnt 10M @400mm c/c both top and bottom.