LAPORAN KULIAH KERJA NYATA-PRAKTEK (KKN-P) PENGADAAN KONSTRUKSI/PEMBELIAN GEDUNG KANTOR DINAS PENDIDIKAN KOTA MALANG 6.7 PERHITUNGAN PONDASI DATA STRUKTUR 1. Dimensi kolom b = 300 mm h = 500 mm Type kolom αs = 30 2. Dimensi Pondasi B = 1.5 m L = 1.5 m Ht = 0.45 m 3. Mutu Beton = 20Mpa 4. Mutu Baja = 320 Mpa 5. Besi Tulangan = 16 mm 6. BJ Beton = 24 kN/m 3 DATA TANAH 1. Daya dukung tanah σt = 105 kPa (estimasi) 2. Berat tanah γt = 17.20 kN/m 3 (estimasi) 3. Tebal tanah diatas ha = 1.55 pondasi DATA BEBAN 1. Beban P ultimate Pult = 526 kN 2. Beban M ultimate Mult = 20.35 kNm TEKNIK SIPIL U NIVERSITAS BRAWIJAYA 79

Transcript of Data Struktur

Page 1: Data Struktur

LAPORAN KULIAH KERJA NYATA-PRAKTEK (KKN-P) PENGADAAN KONSTRUKSI/PEMBELIAN GEDUNG KANTOR DINAS PENDIDIKAN KOTA MALANG

6.7 PERHITUNGAN PONDASI

DATA STRUKTUR

1. Dimensi kolom b = 300 mm

h = 500 mm

Type kolom αs = 30

2. Dimensi Pondasi B = 1.5 m

L = 1.5 m

Ht = 0.45 m

3. Mutu Beton = 20Mpa

4. Mutu Baja = 320 Mpa

5. Besi Tulangan = 16 mm

6. BJ Beton = 24 kN/m3

DATA TANAH

1. Daya dukung tanah σt = 105 kPa (estimasi)

2. Berat tanah γt = 17.20 kN/m3 (estimasi)

3. Tebal tanah diatas ha = 1.55

pondasi

DATA BEBAN

1. Beban P ultimate Pult = 526 kN

2. Beban M ultimate Mult = 20.35 kNm

σ = (Pult / ( B x L ) + (Mu / (1/6 x B (L2 )) + q …..<< σt

TEKNIK SIPIL UNIVERSITAS BRAWIJAYA

79

Page 2: Data Struktur

LAPORAN KULIAH KERJA NYATA-PRAKTEK (KKN-P) PENGADAAN KONSTRUKSI/PEMBELIAN GEDUNG KANTOR DINAS PENDIDIKAN KOTA MALANG

q = Berat pondasi + berat tanah

= ( ht x γc ) + ( ha + γt )

= ( 0.45 x 24 kN/m3 ) + ( 1.55 x 17.2 kN/m3 )

= 37.46 kN/m3

Tegangan yang terjadi pada tanah

σ maks = (Pult / ( B x L ))+ (Mu / (1/6 x B (L2 )) + q …..<< σt

= ( 622 / (1.5m x 1.5m )) + (12.943/ (1/6 x 1.5m x (1.52 ))) + 37.46 <<<σt

= 276.44 + 23.01 + 37.46

= 336.914 ≤ 450 kN/m2

σ min = (Pult / ( B x L )) - (Mu / (1/6 x B (L2 )) + q …..<< σt

= ( 622 / (1.5m x 1.5m )) - (12.943/ (1/6 x 1.5m x (1.52 ))) + 37.46 <<<σt

= 276.44 - 23.01 + 37.46

= 290.895 ≤ 450 kN/m2

a) Kontrol Gaya Geser 1 Arah

ds = 75 + (D / 2)

= 75 +(16 / 2)

= 83 mm

TEKNIK SIPIL UNIVERSITAS BRAWIJAYA

80

Page 3: Data Struktur

LAPORAN KULIAH KERJA NYATA-PRAKTEK (KKN-P) PENGADAAN KONSTRUKSI/PEMBELIAN GEDUNG KANTOR DINAS PENDIDIKAN KOTA MALANG

d = ht – ds

= 450 – 83

= 367 mm

a = ( B / 2 ) – (b/2) – d

= 750 – 250 – 367

= 133 mm

= 0.133 m

σ a = σ min + ( B – a ) x ((σ maks - σ min) / 2 )

= 290.895 + ( 1.5 – 0.133 ) x ((336.914 - 290.895)/2)

= 332.834 kN/m2

Gaya tekan keatas dari tanah ( Vu)

Vu = ( a x B x (σ maks + σ a) / 2

= ( 0.133 x 1.5 ( 336.914 + 332.834 ) /2

= 66.807 kN

Gaya geser yang dapat ditahan oleh beton (Ǿ Vc )

Ǿ Vc = Ǿ x ( 1/6 (fc’)0.5

= 0.75 x ( 1/6 * (20 )0.5

= 307.739 kN

Ǿ Vc > Vu

307.739 > 66.8047…………..AMAN

b) Kontrol Gaya Geser 2 Arah

Dimensi kolom

b = 30 cm = 300 mm

h = 50 cm = 500 mm

b + d = 300 mm + 367 mm = 667 mm………> 0.667 m

TEKNIK SIPIL UNIVERSITAS BRAWIJAYA

81

Page 4: Data Struktur

LAPORAN KULIAH KERJA NYATA-PRAKTEK (KKN-P) PENGADAAN KONSTRUKSI/PEMBELIAN GEDUNG KANTOR DINAS PENDIDIKAN KOTA MALANG

h + d = 500 mm + 367 mm = 867 mm………> 0.867 m

Gaya tekan keatas

Vu = (B2 – (( b + d) x ( h + d))) x ((σ maks + σ min) / 2 )

= ( 1.52 – (0.667 + 0.867 )) x ((336.914 + 290.895)/2)

= 524.7575 kN

βc = ( hkolom / bkolom )

= ( 500 / 300 ) = 1.667

bo = 2 x ((bk + d) + (hk + d))

= 2 x ((300 + 367) + (500 + 367))

= 3068 mm

Gaya geser yang ditahan oleh beton

Vc1 = ( 1 + (2 / βc)) x (1/6 x (f’c0.5) x bo x d)

= ( 1 + (2 / 1.667)) x (1/6 x ( 20) 0.5 x 3068 mm x 367 mm

= 1846.324 kN

Vc2 = ( 2 + (αs x d / bo)) x (1/12 x (f’c0.5) x bo x d)

= ( 1 + (30 x 367 / 3068)) x (1/12 x ( 20) 0.5 x 3068 mm x 367 mm

= 1925.488kN

TEKNIK SIPIL UNIVERSITAS BRAWIJAYA

82

Page 5: Data Struktur

LAPORAN KULIAH KERJA NYATA-PRAKTEK (KKN-P) PENGADAAN KONSTRUKSI/PEMBELIAN GEDUNG KANTOR DINAS PENDIDIKAN KOTA MALANG

Vc3 = 1/3 x (f’c0.5) x bo x d)

= 1/3 x ( 20) 0.5 x 3068 mm x 367 mm

= 1678.476 kN

dari hasil perhitungan Vc diatas, diambil yang terkecil yaitu Vc3 = 1678.476 kN

Ǿ Vc > Vu

0.75 x 1678.476 kN > 524.758 kN

1258.857 kN > 524.758 kN/……………… AMAN

c) Perhitungan Penulangan Pondasi

ds = 75 + D + D/2

= 75 + 16 + (16/2)

= 99 mm = 0.099 m

d = ht – ds

= (0.45 – 0.099)

= 0.351 m = 351 m

x = (B/2 – h/2 )

= ((1500 / 2) – (500/2))

= 500 mm = 0.5 m

σx = σ min + (( B – x ) x (σ max - σ min)/B)

= 290.895 +(( 1.5 – 0.5 ) x (336.914 – 290.895)/1.5)

= 321.574 kN/m3

Mu = 0.5 x σx x ( X2 ) x (1/3 x (σ max - σ min)/( X2 )

= 0.5 x 321.574 kN/m3 x (0.52) x (1/3 x (336.914-290.895)/( 0.52 )

= 41.475 kNm

K = Mu / (Ǿ x b x d2)

= 41475117.284 / ( 0.8 x 1000 x ( 3512)

= 0.421 Mpa

TEKNIK SIPIL UNIVERSITAS BRAWIJAYA

83

Page 6: Data Struktur

LAPORAN KULIAH KERJA NYATA-PRAKTEK (KKN-P) PENGADAAN KONSTRUKSI/PEMBELIAN GEDUNG KANTOR DINAS PENDIDIKAN KOTA MALANG

Kmax = (382.5 x 0.85 x ( 600 + fy – ( 225 x β1 ) x f’c) / (600 + fy)

= (382.5 x 0.85 x ( 600 + 320 – (225 x 0.85 ) x 20) / (600 + 320)

= 5.599

K <<<< Kmax……………………0.421 < 5.599 >>>OK!!!

a’ = (1 – ( 1 – ( 2 x K )/(0.85 x fc’))0.5) x d

= (1- (1- (2 x 0.421 ) / (0.85 x 20 )) 0.5) x 351

= 8.799 mm

As(1) = ( 0.85 x fc’ x a’ x b) / (fy)

= ( 0.85 x 20 x 8.799 x 1000)/ (320 )

= 467.432 mm2

karena fc’ < 31.36 Mpa

maka untuk rumus As(2)

As(2) = (1.4 x b x d )/ fy

= ( 1,4 x 1000 x 351 ) / 320

= 15325.625 mm2

dari perhitungan As(1) dan As(2) diambilyang paling besar = 15325.625 mm2

Menghitung jarak tulangan:

S = (0.25 x π x D2 x b) / As

= (0.25 x π x (162 x 1000) / 15325.625

= 130.865 mm

S < 2 x ht

< 2 x (450mm)

< 900 mm

S < 450 mm

Sehingga dari perhitungan diatas diambil yang terkecil yaitu S = 130.865 mm ~ 130 mm

TEKNIK SIPIL UNIVERSITAS BRAWIJAYA

84LAMPIRAN PERHITUNGAN STAAD PRO