D. Attié, X. Coppolani, P. Colas, M. Lupberger, M. Riallot, J. Timmermans, W. Wang
description
Transcript of D. Attié, X. Coppolani, P. Colas, M. Lupberger, M. Riallot, J. Timmermans, W. Wang
D. Attié, X. Coppolani, P. Colas, M. Lupberger, M. Riallot, J. Timmermans, W. Wang
Thanks to K. Dehmelt & U. Renz
LCTPC WP Phone meeting 119 December ç, 2010
i r f u
yalcas
i r f u
yalcas
‘‘Octopuce’ beam testOctopuce’ beam test
Trigger setupTrigger setupTrigger setupTrigger setup
2December 9, 2010 LCTPC WP phone meeting #119
Trigger/shutter and handshake schematics
T.U. ∞
Trigger BUSY
Out
Out
Out = NIMTTL→NIMPC
BUSY
Reset
Out = NIMOut
Out
T.U. ∞T.U. 1.6 μs
EndM
OutReset
NIM→TTL
Out
Shutter when generated by trigger
Shutter active low
Start
TRIGGERS
NIM→TTL
Out
Trigger TTL level to PC
Veto
•He/Iso 80/20•Vmesh = 370V•TOT mode•Shutter time 0.5 s
Gas boxGas boxGas boxGas box
3December 9, 2010 LCTPC WP phone meeting #119
•He/Iso 80/20•Vmesh = 380V•Time mode•Shutter Time: 100 us, start given by beam trigger
TPC at 0TTPC at 0TTPC at 0TTPC at 0T
4December 9, 2010 LCTPC WP phone meeting #119
TPC at 1TTPC at 1TTPC at 1TTPC at 1T
5December 9, 2010 LCTPC WP phone meeting #119
•He/Iso 80/20•Vmesh = 380V•Time mode•Shutter Time: 100 us, start given by beam trigger
TPC at 1TTPC at 1TTPC at 1TTPC at 1T
6December 9, 2010 LCTPC WP phone meeting #119
•He/Iso 80/20•Vmesh = 400V•Time mode•Shutter Time: 100 us, start given by beam trigger