Current Status of FMOS and Schedule Toward the Common Use

16
Current Status of FMOS and Schedule Toward the Common Use Naruhisa Takato

description

Current Status of FMOS and Schedule Toward the Common Use. Naruhisa Takato. What is FMOS?. F ibre M ulti- O bject S pectrograph. wavelength coverage: 0.9 – 1.8 um FOV: φ30 ‘ 400 multiplicity OH – airglow suppression spectral resolution: R=500 & 2200 - PowerPoint PPT Presentation

Transcript of Current Status of FMOS and Schedule Toward the Common Use

Page 1: Current Status of FMOS and  Schedule Toward the Common Use

Current Status of FMOSand

Schedule Toward the Common Use

Naruhisa Takato

Page 2: Current Status of FMOS and  Schedule Toward the Common Use

What is FMOS?Fibre Multi-Object Spectrograph

• wavelength coverage: 0.9 – 1.8 um• FOV: φ30 ‘• 400 multiplicity• OH – airglow suppression• spectral resolution: R=500 & 2200• expected limiting magnitude: ( 1 hour, S/N=5) J = 22.3, H = 20.9

Page 3: Current Status of FMOS and  Schedule Toward the Common Use

A Quick History of FMOS

• 2000 : project approved design and development of - Fibre positioner (Echidna): AAO - Prime Focus Unit (PIR): Kyoto/NAOJ - Spectrograph IRS1: Kyoto/NAOJ, IRS2: Oxford, RAL (UK) - F5 fibre: Durham (UK)

Page 4: Current Status of FMOS and  Schedule Toward the Common Use

A Quick History of FMOS

• 2005/07, 10 1st and 2nd PIR test on telescope

- Corrector was offseted/tilted, but could not correct it because corrector could move only along 1-axis and…- PIR cable wrapper broken mechanically

Cable wrapper and corrector moving mechanism were re-designed and newly fabricated.

Page 5: Current Status of FMOS and  Schedule Toward the Common Use

Photo: M. Kimura

Page 6: Current Status of FMOS and  Schedule Toward the Common Use

IRS1( Univ. Kyoto) IRS2( UK)

TUE-IR / Subaru

Page 7: Current Status of FMOS and  Schedule Toward the Common Use
Page 8: Current Status of FMOS and  Schedule Toward the Common Use

F5 fibre installation

Page 9: Current Status of FMOS and  Schedule Toward the Common Use
Page 10: Current Status of FMOS and  Schedule Toward the Common Use

Current Active Members

• Hawaii M. Akiyama, N. Tamura, M. Kimura, P. Tait, N. Takato• Kyoto F. Iwamuro, T. Maihara, K. Ohta• Oxford Univ., Univ. Durham, Rutherford Appleton Lab. (UK)• Anglo Australian Observatory (AU)

Page 11: Current Status of FMOS and  Schedule Toward the Common Use

Progress in FMOS engineering Obs.

- Coma aberration can be canceled by adjusting corrector lens using SH wavefront measurement- optics: 0.3-0.5 arcsec, - actural image size (incl. seeing): 0.8-1”- telescope distortion modeling: 0.8” rms => 6 stars were acquired at the same time in AG fiber- Obtained Sky spectrum

Page 12: Current Status of FMOS and  Schedule Toward the Common Use
Page 13: Current Status of FMOS and  Schedule Toward the Common Use

Stellar images in AG fibre

Page 14: Current Status of FMOS and  Schedule Toward the Common Use
Page 15: Current Status of FMOS and  Schedule Toward the Common Use

A Tentative Schedule Toward Open Use

• 2007/12 : PIR test on the telescope (I)(II)• 2008/01 : Echidna test on the telescope (I)• 2008/02: refine Echidna and Spectrograph control on the telescope(II)• 2008/05: IRS1,2 test (I)• 2008/06: IRS1,2 test (II)• 2008/08-: tune-up the total system• 2008/12? - : start GT?• 2009/06 : provide maintenance document• 2009/08??: start Open Use

Page 16: Current Status of FMOS and  Schedule Toward the Common Use

… need stable instrument for open use