Requirements for installations in LHC tunnel
• 50 Mgy over 10 years
• 300 to 1500 m wiring line
• 5 μm position precision
• Low EMI noise
• High reliability
• Restricted human intervention time
Test SPS LSS5/TT40 equipments
Motorization* 5μm LEP(1MGy)
Resolver 5μm LEP(1MGy)
Linear potentiometer 100μm ≥50MGy
LVDT 20μm ≥50MGy
PT100 1/10°C
Accelerometer piezo (10Hz..7kHz)
Audio recorder start remotely
Wiring requirement
• Power dissociate from signal
• Appropriate shielding and grounding
• Grounding continuity
Wiring: SPS quick plug
• Constraint due to narrow section
• Additional source for connection error and non-conductor
• Ground discontinuity
Extended wires to patch panelPatch panel in basement
Wiring
50% control price, to save money:
• SPS test to define if NE48 cable can be used
Interface
Collimator Performance
• Mechanical Stop = reference
• Switch = safety
• Effective excursion = out of switch
Axe Initialization
1. Motor off = jaw auto retraction = lim- mechanical Stop = reference
2. Motor position reset
3. Read out position sensors (pot/LVDT)
4. Unable lim- switch
5. Motor movement out of lim- switch
6. Effective excursion: 0,5 to 35 mm
Conclusion• SPS test - using LEP motor and control:
– Wiring and quick plug– LVDT– Remote control
• LHC– Increase motor resistance– Select wiring and quick plug– Define control