  • GMn experiment engineering & design status

    Robin Wines

    October 20181

  • Components of GMn & Calibration

    October 20182

    GMn experiment requires• SBS• BB and detectors• HCal & CDet

    Calibration setup requires• HRS-left• SBS• HCal & CDet

    09019 Hydrogen/Deuterium Experimental Points 10cm Hydrogen/Deuterium

    Q2 [GeV2]

    θBB [deg]

    dBB [m]

    θ48D48 [deg]

    d48D48 [m]

    dHCAL [m]

    Beam Line Configuration #

    3.5 32.5 1.80 31.1 2.0 7.2 3 4.5 41.9 1.55 24.7 2.25 8.5 3 5.7 58.4 1.55 17.5 2.25 11 3 8.1 43 1.55 17.5 2.25 11 3 10.2 34 1.75 17.5 2.25 11 3 12.0 44.2 1.55 13.3 2.25 14 3

    13.5 33.0 1.55 14.9 3.1 17 4

    Calibration Points: 10cm Hydrogen

    Q2 [GeV2]

    θHRS [deg]

    θ48D48 [deg]

    d48D48 [m]

    dHCAL [m]

    Beam Line Configuration #

    4.4 39 25.5 3.1 17. 4 4.4 42 25.5 3.1 17. 4 6.0 61.1 14.9 3.1 17. 4 6.0 64.3 14.9 3.1 17. 4 6.0 67.5 14.9 3.1 17. 4 6.0 70.7 14.9 3.1 17. 4

  • GMn Layout

    October 20183

    SBS and HCal

    BB

  • Calibration Layout

    October 20184

    HRS-L

    SBS

    HCal

  • SBS Equipment

    October 20185

    Scattering Chamber-existing

    Front Field Clamp-done

    Corrector Magnets-done

    48D48 Magnet-done

    Counterweight Support Structure-done

    Exit Beam Pipe-in assembly

    Hcal & CDet- in assembly

  • Status

    October 20186

    ITEM STATUSHall A & UtilitiesFloor rise at the pivot needs survey & concrete leveling during install

    Floor plates

    GMn uses 10 of 15 SBS floor plates, Have 10 plates. GMn uses 9 of 16 HCAL floor plates, Catania has 7 plates on order.

    Move BB rails to BL during installHRS-BR interferences - move air handler, move catwalk post at pivot, install access platform to access cryo can at pivot Modify & use Tritium platform, pre-install workLCW upgrade needs engineering check & purchase

    BEAMLINEClear utilities supported along existing beamline during installMove and modify existing beamline supports during installModify existing beamline flanges doneNew beamline conical pipe doneBeamline shielding doneBeamline assembly hardware design tested, needs purchasingSupport tower doneSupport tower extension delivery Nov 30, 2018Vertical supports redesigned, needs purchasingCorrector magnets done

  • Status

    October 20187

    ITEM STATUSSBS MAGNET

    Magnet modificationsassembled and tested, need holes for field clamp mounts

    Counterweight support structureassembly tested, blocks need painting and holes for mount attachments

    Magnet sub-assembly stand needs engineering and purchaseField clamps done

    HCALDetector frame assembly parts and frame doneSupport redesigned, need drawings and purchasingPersonnel Access platform need drawings revised and purchasing

    CDETFrame doneAssembly and mounting parts need design and engineering checks and purchasing

    BigBiteFrame modifications done, in assemblyMagnet interferences check at installDetector stack base support needs design & engineering check

  • Status

    October 20188

    ITEM STATUSElectronics ShieldingMain hut doneBB GEM hut done(new GEM hut for side of SBS support) needs design

    Target chamber need to purchase windows

    Sieve plate and holder needs purchasing

  • Summary

    October 20189

    Completion requires 24 mw design and 18 mw engineering

    Hall A has staff of 2 engineers, 1 associate engineer and 3 designers.

    Present workload and priorities, allow all SBS GMn engineering & design to be complete by mid-March 2019. This does not include fabrication. The GEn polarimeter design work is not included in this schedule.

    GMn experiment �engineering & design status Components of GMn & CalibrationGMn LayoutCalibration LayoutSBS EquipmentStatusStatusStatus Summary