Calculo de Volumenes de Pozos

12
P O Z O LOMITAS N ° 268 Dir. E Q P M 2 1 2 Estado Mecánico Bnas p/perforar Progmdas TR Cemtda Bna 26 " 20 " 19 m ok 20" K-55,94lb/p, BCN θ -19.12 26 m 1.10 gr/cc Bna 17 ½ " 13 ⅜ "J-55-54.5lb/p,BCN θ -12. 312 m 1.2 gr/cc 311 m ok Bna 12 ¼ " 9 ⅝ N-80, 40 lb/p:BCN Ø int. 1522 m 1.3 gr/cc 1521 m ok Bna 8 ½ " 2485 m 1.55 gr/cc 7" N-80, 26 lb/p BCN Ø int. 6. 2485 m pte Bna ### " Prof 3110 m 3110 m 1.75 gr/cc m pte 3½" N-80, 9.3 lb/p 8HRR Ø int. 3.

description

HOJA DE CÁLCULO PARA DETERMINAR VOLUMENES EN POZOS

Transcript of Calculo de Volumenes de Pozos

Page 1: Calculo de Volumenes de Pozos

P O Z O LOMITAS N ° 268 Dir. E Q P M 2 1 2Estado Mecánico

Bnas p/perforar Progmdas TR Cemtda

Bna 26 "20 " 19 m ok

20" K-55,94lb/p, BCN θ -19.1226 m 1.10 gr/cc

Bna 17 ½"

13 ⅜ "J-55-54.5lb/p,BCN θ -12.615312 m 1.2 gr/cc 311 m ok

Bna 12 ¼ "

9 ⅝ N-80, 40 lb/p:BCN Ø int. 8.681

1522 m 1.3 gr/cc 1521 m ok

Bna 8 ½ "

2485 m 1.55 gr/cc 7" N-80, 26 lb/p BCN Ø int. 6.184"

2485 m pteBna ### "

Prof 3110 m

3110 m 1.75 gr/cc m pte3½" N-80, 9.3 lb/p 8HRR Ø int. 3.826 "

Page 2: Calculo de Volumenes de Pozos

P O Z O LOMITAS N ° 268 Dir. E Q P M 2 1 21° Etapa Bna 17 1/2 DATOS

Barrenas p/perforar TR Cemtdas Piston = 6.5Q emb = 4.91 gpe Kg/Cm²

Bna 26 " Carrera = 12Q epm = 737 gpm 0.00 Lbs/Pg²

20 " 26 m ok Eficien= 0.95Int.Tub.= 3.83 Min. P.Bbeo= 1500 psi

1.17 gr/cc Epm = 150 T. A. = 23 Min. P. H. = 47.2 Kg/Cm²

V1 TP 4 1/2 499 m Dens = 1.18 Ciclo = 22.94 Min. DEC = 1.21 Gr/cm3

D.Ext. D.Int. Long Cap.Int Vol.Int. Tub

Cap.Int. pgs pgs mts lts/m Lts Glns Emb

Bna 17 ½ " V5 TP 4 ½ V1 4 ½ 3.826 498.6 7.42 3,698.07 977.03 199

TP hw 4 ½ V2 4 ½ 2.785 136.4 3.93 536.14 141.65 29

hw 4 1/2 Hta 8 V3 8 2.875 65 4.19 272.23 71.92 15

V2 136.4 m Long Total 700 Vol.Total4,506.45 1,190.61 242

V3 hta Ag-Hta V4 12 1/4 8 65 43.61 2835 748.88 152.37V4 65 m Ag-TP V5 12 1/4 3 1/2 309 69.83 21577 5,700.75 1,159.92

TR -TP V6 12.615 4 1/2 498.6 70.37 35087 9,270.12 1,886.17

Prof 400 Cap.E.Anular 872.6 Vol.Total 59499 ### 3,198.45

13 ⅜θ int 12.62 700 m pte Prof.Total Bna 400 Vol.TotalEmb Totales 3,440.70

Page 3: Calculo de Volumenes de Pozos

document.xlsx Ing. C.Rolando

P O Z O LOMITAS N ° 268 Dir. E Q P M 2 1 2

2a Etapa Bna 12 1/4 DATOS

Barrenas p/perforar TR Cemtdas Piston = 6.5 emb = 4.91 gpe PMPC= Kg/Cm²

Bna 26 " Carrera = 12Q epm = 600 gpm 0.00 Lbs/Pg²

20 " 19 m ok Eficien= 0.95nt.Tub.= 5 pg P.Bbeo= 2300 psi

1.1 gr/cc V6 Epm = 122 T. A. = 38 Min. P. H. = 175.5 Kg/Cm²

Bna 17 ½ " V1 13 ⅜ θ - 12.6 Dens = 1.30 Ciclo = 42.87 Min. DEC = 1.42 Gr/cm3

311 m ok

Tp 1147 m D.Ext. D.Int. Long Cap.Int Vol.Int. Tub

1.2 gr/cc Cap.Int. pgs pgs mts lts/m Lts Glns Emb

V5 TP 5 V1 5 4.276 1151 9.26 10,664 2,817 573

Bna 12 ¼ " TP hw 5 V2 5 3.000 136 4.56 620 164 33

5000 13 5/8" Arreglo 2 Hta 8 V3 8 3.000 63 4.56 287 76 15

V2 Long Total 1350 Vol.Total 11,571 3,057 622

Hw 140 m Cap.E.Anular pgs pgs mts lts/m M ³ Glns Emb

Ag-Hta V4 12 1/4 8 63 43.61 2747 726 148

Ag-TP V5 12 1/4 5 976 63.37 61,848 16,340 3,325V4 Dc 63 m TR -TP V6 12.615 5 311 67.97 21138 5,585 1,136

1.30 gr/cc V3 1350 Vol.Total 85734 22,651 4,609

Prof ### m Emb Totales 5,231

1520 m Pte

Page 4: Calculo de Volumenes de Pozos

P O Z O LOMITAS N ° 268 Dir. E Q P M 2 1 2

3a Etapa Bna 8 1/2 DATOS

Barrenas p/perforar TR Cemtdas Piston = 5.5Q emb = 3.52 gpe pmpea 50.30 Kg/Cm²

20" Carrera = 12Q epm = 450 gpm 715.27 Lbs/Pg²

Bna 26 " 19 m ok Eficien= 0.95Int.Tub.= 12 Min. P.Bbeo= 1700 psi

1.1 gr/cc Epm = 128 T. A. = 31 Min. P. H. = 315.0 Kg/Cm²

V1 Tp 5 " 2019 m Dens = 1.4 Ciclo = 42.96 Min. DEC = 1.48 Gr/cm3

Bna 17 ½" V6 13 ⅜ θ - 12.615 Vel An. ### ppm Emb Totales 5,499

1.2 gr/cc 311 m ok D.Ext. D.Int. Long Cap.Int Vol.Int. Tub

Cap.Int. pgs pgs mts lts/m Lts Glns Emb

TP 5 V1 5 4.276 2019 9.26 18,705 4,942 1,404

Bna 12 ¼" 9 ⅝ θ - 8.921 TP hw 5 V2 5 3.000 139 4.56 632 167 47

1521 m ok Hta 6.5 V3 6 ½ 2.875 92.4 4.19 387 102 29

V5 Long Total 2250 Vol.Total 19,724 5,211 1,481

V2 hw 5 " 139 m Prof Total de Bna###

230.97 m

Bna 8 ½ " V4 V3 Dc 6½" 92.4 m

1.52 gr/cc 2250 m pte D.Ext. D.Int. Long Cap.An. Vol.E.An

Cap.E.Anular pgs pgs mts lts/m M ³ Glns Emb

Ag-Hta V4 8 1/2 6 1/2 92.4 15.20 1,405 371 105

Ag-TP V5 8 1/2 5 637 23.94 15,241 4,027 1,144

TR -TP V6 8.535 5 1521 24.24 36,875 9,742 2,769

2250 Vol.Total 53,520 14,140 4,018

Page 5: Calculo de Volumenes de Pozos

document.xlsx crgs

P O Z O LOMITAS N ° 268 Dir. E Q P M 2 1 2 Datos

Barrenas p/perforar TR Cemtda Piston = 5 Q emb = 2.91 gpe pmpea 127.69 Kg/Cm²Bna 26 " Carrera = 12 Q epm = 198 gpm pmpea 1815.78 Lbs/Pg²

19 m 20 " 19 m ok Eficien= 0.95 Int.Tub.= 10 Min. P.Bbeo= 3000 psiBna 17 ½" Tp 4 ½ 16.6 lb/p 795.91 m Epm = 68 T. A. = 12 Min. P. H. = 559.8 Kg/Cm²

1.1 gr/cc V1 Dens = 1.8 Ciclo = 22 Min. DEC = 1.90 Gr/cm3300 m 1.2 gr/cc vel prom.= 0 ppm Emb Totales 1,483

V9311 m ok

Bna 12 ¼" 13 ⅜ "J- 55 lb/p, BCN θ -12.615 D.Ext. D.Int. Long Cap.Int VolumenVol.Total Int.TubCap.Int. pgs pgs mts lts/m Lts Glns EmbTp 3 ½ V2 3 ½ 2.563 1962.42 3.33 6,529 1,725 593

V8 Tp 3 ½ ° X-95 939.54 m Tp hw 3 ½ V3 3 ½ 2.188 248.56 2.42 603 159 55V2 Hta V4 4 ¾ 2.063 103.11 2.16 222 59 20

Long Total 2314.09 Vol. Int. 7,354 1,943 668Prof. Bna 3110

1520 m 1.5 gr/cc 1521 m ok

9 ⅝ P-110, 47 lb/p:BCN Ø int. 8.535

Bna 8 ½ " Tp 3 ½ ° G - 105 1022.9 m Cap.E.Anular D.Ext. D.Int. Long Cap.An. Vol.An. Vol.Total E.AnularAg-Hta 4¾ V5 8 1/2 4 3/4 103.11 25.18 2,596 686 236

V7 Ag-TP3 ½ V6 8 1/2 3 1/2 539.89 30.40 16,414 4,337 1,491V2 Suma de TP 3½ 1962 m TR 7-Tp3½ V8 6.094 3 1/2 -795.91 12.61 -10,037 -2,652 -912

-152.91 Vol. E.A. 8,973 2,371 8152485 m 1.6 gr/cc

2467 m ok

Bna 6 ⅛ " 7" P-110, 32 lb/p BCN Ø int. 6.094"

V3 Hw 3 1/2 " 248.56 m

V4

V5 Dc 4 3/4" 103.11 m

3110 m pte

3110 m### gr/cc Prof.### m 4 ½" P-110, 15.1 HDSLX Ø int. 3.826 "

Page 6: Calculo de Volumenes de Pozos

Niquel 1 - EQ PM 212 Tubing Less 4 1/2"

Barrenas p/perforar TR Cemtda Piston = 5 Q emb = 2.91 gpe PMPC= Kg/Cm²Bna 26 " Carrera = 12 Q epm = 198 gpm 0.00 Lbs/Pg²

19 m 20 " 26 m ok Eficien= 0.95 Int.Tub. 35 Min. P.Bbeo= 3000 psiBna 17 ½" Epm = 68 T. A. = 101 Min. P. H. = 712.9 Kg/Cm²

1.1 gr/cc V1 Dens = 2.01 Ciclo = 136 Min. DEC = 2.09 Gr/cm3700m 1.2 gr/cc 702 m ok

Bna 12 ¼" 13 ⅜ "J- 55 lb/p, BCN θ -12.615 D.Ext. D.Int. Long Cap.Int VolumenVol.Total IntTubCap.Int. pgs pgs mts lts/m Lts Glns Emb

V5 TP 4 ½ V1 4 ½ 3.826 3547 7.42 26,309 6,951 2,390ZapTrms TR V2 4 ½ 3.826 43 7.42 316 83 0

Long Total 3547 Vol. Int. 26,309 6,951 2,390BL 2496 m ok Prof. Total 3547

Cap.E.Anular2650m 1.5 gr/cc 2650 m ok Ag-TP4 ½ V3 6 4 1/2 0 7.98 0 0 0

9 ⅝ P-110, 47 lb/p:BCN Ø int. 8 Lin7 -Tp4½ V4 6.094 4 1/2 1051 8.56 8,993 2,376 817Bna 8 ½ " TR 9⅝-Tp4½ V5 8.535 4 1/2 2496 26.65 66,520 17,575 6,043

V4 3547 Vol. E.A.75,513 19,950 6,8609,250

2500m 1.75 gr/cc 3547 m ok2.00gr/cc 7 Ø int 6.09

N-80, 29 lb/p BCNV3

Bna 6 "

4300m 2.01 gr/cc V2

Prof. 3547 m

4 ½" P-110, 15.1 HDSLX Ø int. 3.826 "

Page 7: Calculo de Volumenes de Pozos

Ing. Ricardo Espinosa Ramos

Presión Máxima Permisible por Espacio Anular.

Pozo: Equipo: 212

Datos

Diametro : 7 pg

Grado: P-110 Datos

Libraje: 32.0 lb/pie

Presión Interna: 12 psi

Presión al Colapso: 10780 psi

Factor de Seguridad: 0.80 adim

Prueba Cabezal (CSC) 8400 psi

Resist. Presión Int: 10 psi Resultados

P.Max.Grad. Frac.@ 1800 11,500 psi

Grad. Fractura: 2.28 grs/cc

Prof. Perfda. Prof. Zap. Dens.lodo P.H Fondo Grad. Frac. PMPCEA

mts mts grs/cc psi grs/cc psi

3650 3547 1.92 9965 2.28 1,816

3700 3547 1.92 10102 2.28 1,816

3800 3547 1.92 10375 2.28 1,816

4000 3547 1.92 10921 2.28 1,816

4100 3547 2 11660 2.28 1,412

0 2.28 11,500

0 11,500

0 11,500