COMPANY PRESENTATION
COMPLETED PROJECTS
VVTV OIL MARINE JETTY – VASSILIKO CYPRUS
Construction of an 1.5 Km Oil Jetty. Driving of 50 m long, 1.2 m diameter, 40 ton, 1:3 raked
steel tubular piles. Installaltion of 3m diameter, 52m long 200ton monopiles Concrete works (pre-cast and cast in-situ offshore)
VVTV OIL MARINE JETTY – VASSILIKO CYPRUS
VVTV OIL MARINE JETTY – VASSILIKO CYPRUS
FLISVOS MARINA EXTENSION – FALIRO
Construction of a 47 mega yacht marina. 550m rubble mount breakwater armoured with quarry rock. 450m quaywalls.
68m pier on steel tubular piles driven in hard clay filled with concrete (Φ1000, 39m),
FLISVOS MARINA EXTENSION – FALIRO
FLISVOS MARINA EXTENSION – FALIRO
FLISVOS MARINA EXTENSION – FALIRO
VOLISSOS FISHING PORT – CHIOS
Basin Dredging, Construction of 240m qauywalls and Construction of 180m breakwaters
MARATHOKAMPOS FISHING PORT – SAMOS
Basin dredging 70.000m3, 320m quaywalls, 100m breakwaters.
PANTOKRATORAS SAILING PORT - PREVEZA
Extensive Basin Rock Dredging, Hollow Concrete Blocks Quaywall
CONSTRUCTION OF EVDILOS PORT – IKARIA
Basin Dredging 30.000m3 200m concrete blocks quaywalls and 230m breakwaters. 110,000 M3 Rockwork 32,000 M3 Concrete This job was subcontracted to two local size subcontractors while
ARCHIMEDES held the management
PORT OF ASTROS – ASTROS
Basin Dredging 35.000m3 250m concrete block quaywalls 300m breakwaters
Improvement of National Road Samos - Karlovasi. Section Kourou Dere
2 Km Road Construction 1 km Shore Protection
Dredging of VTTV Oil Marine Jetty Berthing Area
Dredging of 330.000m3 of silt, silty clay, marl, hard marl, gravel and boulders.
MOORING DOLPHINS (MONOPILES) INSTALLATION
Limenas Alon at Pireaus Central Port - Pireaus
Basin dredging 20000m3, 200m caisson quaywall at -12m, Relieving prism, concrete superstructure, central port sewage and potable
water network, microtunneling for sewage network etc
Agiokabos Fishing Harbour – LARISA
65 boat fishing port, Breakwaters:400m rumble
mound with TETRAPOD armour units,
Quay walls:150m
PILE TESTING FOR THE GEOTECH STUDY OF VTTV
Pile Test Execution (2 piles tested offshore and one tested onshore)
Offshore borehole execution Geotechnical study issuance
Marina at Coufonissi – Cyclades
Construction of a 30 yacht marina, Breakwaters:145m, Quay walls: 275m, service networks
Marina at Neo Klima - Skopelos island
Construction of a 66 yatch marina, Breakwaters:65m, Quay walls:185m
Orfani Fishing Harbour – Kavala
Construction of a 60 boat fishing port, Breakwaters:465m, Quay walls:150m, Construction of concrete superstructure with all pertinent
accessories
SHEET PILE COATING REPAIR IN ES SIDER , LIBYA
Ras Hilal Fishing Harbour PHASE A, Libya
300m rubble mound breakwaters with Acropode armour units 320m quay walls Clamshell dredging of basin and approach channel
Ras Hilal Fishing Harbour PHASE A, Libya
300m rubble mound breakwaters with Acropode armour units 320m quay walls Clamshell dredging of basin and approach channel
Ras Hilal Fishing Harbour PHASE B, Libya
700m rubble mound breakwaters with Acropode armour units 400m quay walls 650m mass concrete sea wall
Ras Hilal Fishing Harbour PHASE B, Libya
MAIN EQUIPMENT LIST
1 FLOATING CRANE 120 T (Owned)
1 FLOATING CRANE 55T (Half owned)
2 SPUD BARGE EXCAVATORS (1 Owned, 1 half owned)
2 TUGBOATS (1 Owned, 1 half owned)
IHC S-280 HAMMER & POWERPACK P800 (Owned)
1 VIBRATORY HAMMER PVE105m (Owned)
2 SPLIT HOPPER BARGES 1000 M3 (Owned)
2 FLAT BARGES (1 Owned, 1 Secured)
1 CRAWLER CRANE 200T (Owned)
1 Dredger Excavator (Owned)
Floating Crane “ASTAKOS” LIMA 2400
100 ton lifting capacity 5.5m3 clamshell bucket 50m x 20m x 3m barge
Floating Crane “NIKOLAOS”
55 ton lifting capacity 3.0 m3 clamshell bucket 29m x 13m x 1.5m barge
200ton MANITOWOC CRANE M888 on a JACKUP BARGE
200tonliftingcapacity
55m boom
Spud Barge Excavator “ERIMANTHOS”
Spud Barge Excavator “DEMETRIOS”
Tug Boat Vassileios 540HP
540hp horsepower
Tug Boat “MICHAIL” 450 HP
Split Hopper Barge LORA I
940m3 capacity
Split Hopper Barge LORA II
940m3 capacity
Flat barge “ATHINA”
1500ton capacity
Flat Barge “ELLI”
PILE DRIVING TEMPLATE
Cantilever supporting truss Two hydraulically operated grippers at top and bottom
IMPACT HAMMER IHC S280
VIBRATING HAMMER PVE 105m
Eccentric moment 105kgm Max. Frequency 1350tpm Centrifigural Force 2150kN
DREDGER EXCAVATOR ON SPRUD
COMPANY’s KEY PEOPLE
Civil Engineers 14
Mechanical Engineers 1
Survey Engineers 2
H&S Engineers 1
QA&QC Engineers 2
Accounting officers 3
Superintendents 3
Foremen 3
Welding engineers 1
SAFETY & RISK ASSESSMENT
Commitment to a safety culture throughout all operations.
Our approach to safety summarized by the four ‘Cs’ :
Control – monitoring, auditing, supervision Cooperation – ensuring participation and commitment Communication – signal commitment, meetings Competence – training, certification.