COMPANY PRESENTATION

Transcript of Archimedes Presentation

Page 1: Archimedes Presentation

COMPANY PRESENTATION

Page 2: Archimedes Presentation

COMPLETED PROJECTS

Page 3: Archimedes Presentation

VVTV OIL MARINE JETTY – VASSILIKO CYPRUS

Construction of an 1.5 Km Oil Jetty. Driving of 50 m long, 1.2 m diameter, 40 ton, 1:3 raked

steel tubular piles. Installaltion of 3m diameter, 52m long 200ton monopiles Concrete works (pre-cast and cast in-situ offshore)

Page 4: Archimedes Presentation

VVTV OIL MARINE JETTY – VASSILIKO CYPRUS

Page 5: Archimedes Presentation

VVTV OIL MARINE JETTY – VASSILIKO CYPRUS

Page 6: Archimedes Presentation

FLISVOS MARINA EXTENSION – FALIRO

Construction of a 47 mega yacht marina. 550m rubble mount breakwater armoured with quarry rock. 450m quaywalls.

68m pier on steel tubular piles driven in hard clay filled with concrete (Φ1000, 39m),

Page 7: Archimedes Presentation

FLISVOS MARINA EXTENSION – FALIRO

Page 8: Archimedes Presentation

FLISVOS MARINA EXTENSION – FALIRO

Page 9: Archimedes Presentation

FLISVOS MARINA EXTENSION – FALIRO

Page 10: Archimedes Presentation

VOLISSOS FISHING PORT – CHIOS

Basin Dredging, Construction of 240m qauywalls and Construction of 180m breakwaters

Page 11: Archimedes Presentation

MARATHOKAMPOS FISHING PORT – SAMOS

Basin dredging 70.000m3, 320m quaywalls, 100m breakwaters.

Page 12: Archimedes Presentation

PANTOKRATORAS SAILING PORT - PREVEZA

Extensive Basin Rock Dredging, Hollow Concrete Blocks Quaywall

Page 13: Archimedes Presentation

CONSTRUCTION OF EVDILOS PORT – IKARIA

Basin Dredging 30.000m3 200m concrete blocks quaywalls and 230m breakwaters. 110,000 M3 Rockwork 32,000 M3 Concrete This job was subcontracted to two local size subcontractors while

ARCHIMEDES held the management

Page 14: Archimedes Presentation

PORT OF ASTROS – ASTROS

Basin Dredging 35.000m3 250m concrete block quaywalls 300m breakwaters

Page 15: Archimedes Presentation

Improvement of National Road Samos - Karlovasi. Section Kourou Dere

2 Km Road Construction 1 km Shore Protection

Page 16: Archimedes Presentation

Dredging of VTTV Oil Marine Jetty Berthing Area

Dredging of 330.000m3 of silt, silty clay, marl, hard marl, gravel and boulders.

Page 17: Archimedes Presentation

MOORING DOLPHINS (MONOPILES) INSTALLATION

Page 18: Archimedes Presentation

Limenas Alon at Pireaus Central Port - Pireaus

Basin dredging 20000m3, 200m caisson quaywall at -12m, Relieving prism, concrete superstructure, central port sewage and potable

water network, microtunneling for sewage network etc

Page 19: Archimedes Presentation

Agiokabos Fishing Harbour – LARISA

65 boat fishing port, Breakwaters:400m rumble

mound with TETRAPOD armour units,

Quay walls:150m

Page 20: Archimedes Presentation

PILE TESTING FOR THE GEOTECH STUDY OF VTTV

Pile Test Execution (2 piles tested offshore and one tested onshore)

Offshore borehole execution Geotechnical study issuance

Page 21: Archimedes Presentation

Marina at Coufonissi – Cyclades

Construction of a 30 yacht marina, Breakwaters:145m, Quay walls: 275m, service networks

Page 22: Archimedes Presentation

Marina at Neo Klima - Skopelos island

Construction of a 66 yatch marina, Breakwaters:65m, Quay walls:185m

Page 23: Archimedes Presentation

Orfani Fishing Harbour – Kavala

Construction of a 60 boat fishing port, Breakwaters:465m, Quay walls:150m, Construction of concrete superstructure with all pertinent

accessories

Page 24: Archimedes Presentation

SHEET PILE COATING REPAIR IN ES SIDER , LIBYA

Page 25: Archimedes Presentation

Ras Hilal Fishing Harbour PHASE A, Libya

300m rubble mound breakwaters with Acropode armour units 320m quay walls Clamshell dredging of basin and approach channel

Page 26: Archimedes Presentation

Ras Hilal Fishing Harbour PHASE A, Libya

300m rubble mound breakwaters with Acropode armour units 320m quay walls Clamshell dredging of basin and approach channel

Page 27: Archimedes Presentation

Ras Hilal Fishing Harbour PHASE B, Libya

700m rubble mound breakwaters with Acropode armour units 400m quay walls 650m mass concrete sea wall

Page 28: Archimedes Presentation

Ras Hilal Fishing Harbour PHASE B, Libya

Page 29: Archimedes Presentation
Page 30: Archimedes Presentation

MAIN EQUIPMENT LIST

1 FLOATING CRANE 120 T (Owned)

1 FLOATING CRANE 55T (Half owned)

2 SPUD BARGE EXCAVATORS (1 Owned, 1 half owned)

2 TUGBOATS (1 Owned, 1 half owned)

IHC S-280 HAMMER & POWERPACK P800 (Owned)

1 VIBRATORY HAMMER PVE105m (Owned)

2 SPLIT HOPPER BARGES 1000 M3 (Owned)

2 FLAT BARGES (1 Owned, 1 Secured)

1 CRAWLER CRANE 200T (Owned)

1 Dredger Excavator (Owned)

Page 31: Archimedes Presentation

Floating Crane “ASTAKOS” LIMA 2400

100 ton lifting capacity 5.5m3 clamshell bucket 50m x 20m x 3m barge

Page 32: Archimedes Presentation

Floating Crane “NIKOLAOS”

55 ton lifting capacity 3.0 m3 clamshell bucket 29m x 13m x 1.5m barge

Page 33: Archimedes Presentation

200ton MANITOWOC CRANE M888 on a JACKUP BARGE

200tonliftingcapacity

55m boom

Page 34: Archimedes Presentation

Spud Barge Excavator “ERIMANTHOS”

Page 35: Archimedes Presentation

Spud Barge Excavator “DEMETRIOS”

Page 36: Archimedes Presentation

Tug Boat Vassileios 540HP

540hp horsepower

Page 37: Archimedes Presentation

Tug Boat “MICHAIL” 450 HP

Page 38: Archimedes Presentation

Split Hopper Barge LORA I

940m3 capacity

Page 39: Archimedes Presentation

Split Hopper Barge LORA II

940m3 capacity

Page 40: Archimedes Presentation

Flat barge “ATHINA”

1500ton capacity

Page 41: Archimedes Presentation

Flat Barge “ELLI”

Page 42: Archimedes Presentation

PILE DRIVING TEMPLATE

Cantilever supporting truss Two hydraulically operated grippers at top and bottom

Page 43: Archimedes Presentation

IMPACT HAMMER IHC S280

Page 44: Archimedes Presentation

VIBRATING HAMMER PVE 105m

Eccentric moment 105kgm Max. Frequency 1350tpm Centrifigural Force 2150kN

Page 45: Archimedes Presentation

DREDGER EXCAVATOR ON SPRUD

Page 46: Archimedes Presentation

COMPANY’s KEY PEOPLE

Civil Engineers 14

Mechanical Engineers 1

Survey Engineers 2

H&S Engineers 1

QA&QC Engineers 2

Accounting officers 3

Superintendents 3

Foremen 3

Welding engineers 1

Page 47: Archimedes Presentation

SAFETY & RISK ASSESSMENT

Commitment to a safety culture throughout all operations.

Our approach to safety summarized by the four ‘Cs’ :

Control – monitoring, auditing, supervision Cooperation – ensuring participation and commitment Communication – signal commitment, meetings Competence – training, certification.