1400 UNDERGROUND TRANSFORMERS · 131. t g. 1213 9 11. date. app: section. construction standards....
Embed Size (px)
Transcript of 1400 UNDERGROUND TRANSFORMERS · 131. t g. 1213 9 11. date. app: section. construction standards....

N New Standard
R Redrawn Standard C Changed Standard ~ No Change
1400
UNDERGROUND TRANSFORMERS
7/10/2020
C F1A Bay-O-Net Fuse Schedule for Padmount Transformers
~ HB16,HB32 Hillside Barrier
~ UID1 Padmounted Equipment Identification Tags & Safety
Signs
~ UT2 1Ø Padmount Transformer Radial Feed
~ UT4 Open Y - Open Δ Padmount Transformer Installation
~ UT21, UT22 1Ø Padmount Transformer Assemblies, Loop Feed
~ UT24-UT28 1Ø Padmount Transformer Assembly, Radial or Loop
w/ Feed-Thru Bushing
~ UT30-UT32 3Ø Padmount Transformer Assemblies
~ UTB 1Ø Padmount Transformer Boxpad (Basement)
~ UTP1 Transformer Pad, 1Ø, 25 to 75kVA
~ UTP2A Transformer Pad, 1Ø, 100kVA
~ UTP3 1Ø Transformer Pad Orientation & Conduit Installation
(100 kVA)
~ UTP4 Transformer Pad, 3Ø, 75 to 1500kVA
~ UTP4-6 Precast Pad & Vault for 3Ø Transformers
~ UTP6 (p. 1) 3Ø Transformer Pad Orientation & Conduit Installation
~ UTP6 (p. 2) 1Ø Transformer Pad Orientation & Conduit Installation
(25-75 kVA)
~ UTP9 Typical Barrier Installation to Protect Padmounted
Equipment
~ N/A Clearances (from Commercial Handbook)

DATE
SECTION
APP:
R
CONSTRUCTION STANDARDS
DATE:
ENGR
REVISIONS
OPS
CAD FILE:PAGE:
of
F1AF1A11
ELM
1/31/80
1400
FUSE SCHEDULE
PADMOUNT TRANSFORMERS
1 3/02 DRAWN IN CAD
2 2/11/10 KJP
3 7/10/20 KJP
kVA
Transformer
Stock Number
Transformer
Primary Protection
Minimum
Upstream OH
Fuse Size
*2
BM
240/120
BR
480/120Bayonet Fuse No
S/N
Isolation Link Size
S/N
25
*1
1317
4000358C05 (8 A)
653 3001861A02 25 A 683
50 1318 2016
4000358C08 (15 A)
654 3001861A03 30 A 684
75 1320
4000358C10 (25 A)
655 3001861A05 65 A 687
100 1322
4000358C10 (25 A)
655 3001861A05 65 A 687
1ø Padmounted Transformers
Notes:
*1 Fuses for 25 kVA livefront transformers are stocked for maintenance only (RTE 476B1, S/N 1664).
*2 Use largest fuse size for applications while considering up/downstream fuses, conductor, and loading. Check with
Systems Engineering as needed.
*3 Recommended fuse will result in some loss of overload capability.
*4 Transformer and upstream protection may miscoordinate, therefore each transformer should ideally be on separate
feeders/protection.
*5 Fuse will limit overload capability of transformer.
*6 The use of these fuses will provide 175% of rated load for 2 hours and 150% of rated load for 7 hours.
Rev. 3 - Added 2000 & 2500 kVA, stock numbers, upstream fuses and notes.
Spare fuses are kept in each transformer. It is the responsibility of the person using the spare
fuse to replace it. Fuses are in free issue.
kVA
Transformer
Stock Number
Transformer
Primary Protection
Minimum
Upstream OH
Fuse
*2
BL
208/120
BW
480/277Bayonet Fuse No
S/N
Isolation Link Size
S/N
75 1328 1337
4000358C05 (8 A)
653 3001861A02 25 A 683
150 1329 1338
4000358C08 (15 A)
654 3001861A03 30 A 684
300 1331 1340
4000358C10 (25 A)
655 3001861A05 50 A 686
500 1332 1341
4000358C12 (50 A)
656 3001861A06 100 A 689
750 1333 1342
4000358C12 (50 A)
656 3001861A06 100 A 689
1000 1334 1343
4000358C14 (65 A)
*3
657 3001861A07 100 A
*4
689
1500 1344
4000353C17 (140 A)
658 3001861A05 100 A
*4*5
689
ELSP Fuse
*6
2000 2164
4038361C05C (125 A)
2976 CBUC08250D100
See Systems
Engineering
2500 1345
4038361C05C (125 A)
2976 CBUC08250D100
3ø Padmounted Transformers

PLAN VIEW
SIDE VIEW
1 BARRIER, 16" Height
DESCRIPTIONQTY. S/N
SECONDARY PEDESTAL
EDGE OFTRANSFORMER
FRONT
SECONDARYPEDESTAL
PAD
TRANSFORMERFRONT
2 BARRIER, 32" Height 24611
1'-0" 3'-0"
Grade minimum 4"
21
1'-0"
3'-0"
REV 2: Corrected Measurement Behind Pad, and changed title from HB1 to HB16,HB32.
16"or32"
FRONT
below barrier
DATE
SECTIONAPP:
RCONSTRUCTION STANDARDS
DATE:
ENGRREVISIONS
OPS
CAD FILE:PAGE:
of HB16,HB32 HB161 1 1400
HILLSIDE BARRIER1 4/26/04 LB AH2 5/30/07 LB AH
1 2460
QTY. S/NHB16 HB32ITEM
NO.

Label for outside of padmounted equipment S/N 2568
Label for inside of padmounted equipment S/N 2569
REV 1: ADDED ANSI SAFETY SIGNS
DATE
SECTIONAPP:
RCONSTRUCTION STANDARDS
DATE:
ENGRREVISIONS
OPS
CAD FILE:PAGE:
of UID1 UID11 3ELM
1/31/80 1400
PADMOUNTED EQUIPMENTIDENTIFICATION TAGS AND
SAFETY SIGNS0 REDRAWN IN CAD
0 6/13/021 6/23/04 LB AH

25T
COMBO
3
VIEW WITH LID CLOSEDVIEW WITH LID OPEN
KVA
1. SINGLE-PHASE PADMOUNTED TRANSFORMERS
2. THREE-PHASE PADMOUNTED TRANSFORMERS
VIEW WITH DOOR OPEN
PRIMARY
SECONDARY
3. OTHER PADMOUNT EQUIPMENT
VIEW WITH DOOR CLOSED
COMBO
SECONDARYCOMPARTMENT
75
120/208
#5078
PRIMARYCOMPARTMENT
TCL
LC
VIEW WITH DOOR OPEN VIEW WITH DOOR CLOSED
COMBO
COMBO
DANGER
DANGER
DANGER
DANGER
S/N 2569
S/N 2569
S/N 2568
CO. NUMBER &SEC. VOLTAGEIN 1-1/2" BLACKLETTERS
I.E.; 75 FOR 75KVA
A. TRANSFORMER RATINGIN 1-1/2" YELLOW LETTERS
I.E.; 75-TTRANSFORMER HAS TAPS
B. ADD SUFFIX "T" WHEN
S/N 2569
S/N 2569
S/N 2568
DANGER
S/N 2569
#1234
REV 1: ADDED ANSI SAFETY SIGNS
S/N 2568
3 BUSHING
TAPS
(IF APPLICABLE)
DATE
SECTIONAPP:
RCONSTRUCTION STANDARDS
DATE:
ENGRREVISIONS
OPS
CAD FILE:PAGE:
of UID1 UID12 3ELM
1/31/80 1400
PADMOUNTED EQUIPMENTIDENTIFICATION TAGS AND
SAFETY SIGNS0 REDRAWN IN CAD
0 6/13/021 6/23/04 LB AH

4. SINGLE-PHASE J-BOX
J 2345
COMBO
DANGER
S/N 2568
S/N 2569
4. THREE-PHASE J-BOX
B
LC
CL
C
A
J 2345
COMBO
S/N 2568
DANGER
S/N 2569
REV 1: ADDED ANSI SAFETY SIGNS
DATE
SECTIONAPP:
RCONSTRUCTION STANDARDS
DATE:
ENGRREVISIONS
OPS
CAD FILE:PAGE:
of UID1 UID13 3ELM
1/31/80 1400
PADMOUNTED EQUIPMENTIDENTIFICATION TAGS AND
SAFETY SIGNS0 REDRAWN IN CAD
0 6/13/021 6/23/04 LB AH

RADIAL FEED UT2
FRONT VIEW OF TRANSFORMER
* * - GROUNDING LUG
SEE US6 FOR SECONDARY CONNECTIONS DETAILS
OUTIN
4" ABOVE CURBOR FINAL GRADE
A
2"3"
Ground Lug8
Clamp, Ground Rod 5/8", SmallCap, Protective Insulated, 200AElbow, Loadbreak, 1/0, 200A, 175 mil
Rod, Ground 5/8" x 8'Conductor, Wire BSDC #4 SLD
Pad, Transformer 42" x 42"
567
4
1
Connector, Crimpet, #4 to #2
DESCRIPTION
1 842
2811
11
1376454929
1124
11
QTY.
2651312
S/N
9
32
1
2
3
4
5
6 78
MATERIAL LIST
Cover, Connector U.G.
Bolt, Machine, 1/2" x 1-1/2" SSElbow, Sealing Kit, 1/0, 175 & 220 mil
Connector, z-bar #2-500 MCM + StreetlightWasher, 2" x 3" x 3/16" w/ 9/16" Slotted Hole11
1312
10 1
332
22391
226622651415
131
TG
1312
9 11
DATE
SECTIONAPP:
RCONSTRUCTION STANDARDS
DATE:
ENGRREVISIONS
OPS
CAD FILE:PAGE:
of UT2 UT21 1JEH
2/22/00 1400
SINGLE PHASEPADMOUNT TRANSFORMER
RADIAL FEED
1 2/23/00 HWH MA2 9/23/04 LB AH3 12/29/04 LB AH4 11/11/16 KJP
LEAVE SLACK IN CONCENTRICNEUTRALS FOR FUTUREOPERATION. ADD #2 BCSD IFNECESSARY.
THIS DRAWING IS TYPICAL. USEONLY THE COMPONENTS REQUIREDIN THE MATERIAL LISTS.
NOTE: INSTALL GROUNDING LUG TO TANK
Rev. 4 - Corrected material issue.
10
6
ITEMNO.

OPEN DOOR OPEN DOOR
8 9
REMOVE GROUND STRAP(SEE NOTE 1)
X3
X1
X2
3
2
GROUND
H 1 B
H 1 A
X3
X1
X2
GRD.LUG
A 1H
1H B
1
7
10
GRD.LUG
56
6
OPENY
BANK
OPENY
BANK
**
4
5 53" 2" 3" 2"
DATE
SECTIONAPP:
RCONSTRUCTION STANDARDS
DATE:
ENGRREVISIONS
OPS
CAD FILE:PAGE:
of UT4 UT41 2 9/94 1400
OPEN WYE - OPEN DELTAPADMOUNT TRANSFORMER
INSTALLATION
2 9/23/2004 LB AH3 12/29/04 LB AH4 12/14/09 KJP5 2/4/2014 CM AH
Notes:
1. Remove ground strap from one secondary neutral bushing. Caution: Measure resistance from busing to tank. There may be an internal ground.2. Ground rods may be driven in trench.3. Primary and secondary cables may be arranged as required to fit job site.4. For 2-25kVA only. For other sizes refer to Clark Public Utilities Standards Engineer.5. See UTP1 for pad specifications.6. Both phases must come from the same source and direction.7. Put tags on cables that say "Open Y Bank".8. Maximum motor size shall be 15 horsepower.
LIGHTER POWER
Rev 5: Added second ground lug to power pots and "Open Bank" label.
*
TORQUE TO 20 FT-LBS. MAX.

A C B D
H1A H1B X3 X1 X2
BAY-O-NET FUSE BAY-O-NET FUSE
X2X1X31BHH1A
DBCA
AB
CN
REMOVE GROUND STRAP(SEE NOTE 1)
WIRING DIAGRAM
56
4
23
Rod, Ground, 5/8" x 8'
Lug, Grounding, #8 Sol-2/0 STRConnector, Crimpet #2 to #4 (2C4)Conductor, #4 Solid, BSDC 1/CClamp, Ground Rod 5/8", Small
1
DESCRIPTION
Elbow, Loadbreak, 1/0, 200A, 175 mil, Test Point
23
30 Ft.454842
376
22
1124281
QTY.2
S/N1312
910
87
Cap, Insulated, 200A
Conductor, Al, 4/0, 600V, U.G., 1/C
Cover, Z-Bar Connector, #6-500Connector, Z-Bar #6-500 5/8" Stud, Al/Cu
52
52266265
2265353
UT4
13 Ft.
Rev 5: Added second ground lug to power pots and "Open Bank" label.
DATE
SECTIONAPP:
RCONSTRUCTION STANDARDS
DATE:
ENGRREVISIONS
OPS
CAD FILE:PAGE:
of UT4 UT42 2 9/94 1400
OPEN WYE - OPEN DELTAPADMOUNT TRANSFORMER
INSTALLATION
2 9/23/2004 LB AH3 12/29/04 LB AH4 12/14/09 KJP5 2/4/2014 CM AH
2 278111 Label, "Open Bank"
1234
T
KVA
1235
T
KVA
11
ITEMNO.

FRONT VIEW OF TRANSFORMER
*
THIS DRAWING IS TYPICAL. USE
TO TANKNOTE: INSTALL GROUNDING LUG
- GROUNDING LUG
IN THE MATERIAL LISTS.ONLY THE COMPONENTS REQUIRED
*
NECESSARY.OPERATION. ADD #2 BSDC IFNEUTRALS FOR FUTURELEAVE SLACK IN CONCENTRIC
SEE US6 FOR SECONDARY CONNECTIONS DETAILS
(UT22 SHOWN)
OUTIN
1
2
8
7
1011
6
512 13
TAG
TAG TAG
TAG
TAG
16
3
7
10
14 15
3" 2"
DATE
SECTIONAPP:
RCONSTRUCTION STANDARDS
DATE:
ENGRREVISIONS
OPS
CAD FILE:PAGE:
of UT21-UT22 UT21-UT221 2 10/98 1400
SINGLE PHASEPADMOUNT TRANSFORMER ASSEMBLIES
LOOP FEED
0 2/22/00 HWH MA1 9/23/04 LB AH2 12/29/04 LB AH3 4/29/09 CM AH
F
Rev 3: Changed to Voltage-reset fault indicator.

N.O. LOOP FEED UT21FUTURE
LOOP FEED UT22
FAULT INDICATOR NORMALLY OPEN
DESCRIPTIONS/N
UT22QTY.
Bolt, Unistrut, Padmount Tie Down
Pad, Transformer 42" x 42"
1110 Ground Lug
Elbow, Loadbreak, 1/0, 175 mil (Includes Sealing Kit #2391)
Cap, Protective Insulated 200AClamp, Ground Rod 5/8", SmallRod, Ground 5/8" x 8'Conductor, Wire BSDC #4 SLD
Voltage-Reset Fault Indicator, 400A Trip, 1Ø UG2
89
765
1
Connector, Crimpet, #4 to #2 (2C4)
DESCRIPTION
211
842929
2651
121
1
11
2694
376454
1124281
UT21QTY.
2
S/N1312
Rod, Ground 5/8" x 8'Clamp, Ground Rod 5/8", Small
Bolt, Unistrut, Padmount Tie Down
Conductor, Wire BSDC #4 SLD
Elbow, Loadbreak, 1/0, 175 mil (Includes Sealing Kit #2391)
Pad, Transformer 42" x 42"Ground Lug
1
Connector, Crimpet, #4 to #2 (2C4)
84212
2811
11
112
929
1124376
21
13122694
2521 Bushing, Standoff Insulated 200A3
2
4
56
Nut, Spring-Loaded, Galv, 1/2", Unistrut
Connector, Z-Bar #6-500 MCM + St. LtCover, Connector Z-Bar
Washer, 2" x 3" x 3/16" w/ 9/16" Slotted Hole1415
1312
3322
226622651415920193
193
2266
92014152265
3
223
Washer, 2" x 3" x 3/16" w/ 9/16" Slotted HoleNut, Spring-Loaded, Galv, 1/2", Unistrut
Connector, Z-Bar #6-500 MCM + St. LtCover, Connector Z-Bar
454
16 Connector, Crimpet, #2 to #2 (2C2) 4551
DATE
SECTIONAPP:
RCONSTRUCTION STANDARDS
DATE:
ENGRREVISIONS
OPS
CAD FILE:PAGE:
of UT21-UT22 UT21-UT222 2 10/98 1400
SINGLE PHASEPADMOUNT TRANSFORMER ASSEMBLIES
LOOP FEED
0 2/22/00 HWH MA1 9/23/04 LB AH2 12/29/04 LB AH3 4/29/09 CM AH
Rev 3: Changed to Voltage-reset fault indicator.
Voltage-Reset Fault Indicator, 400A Trip, 1Ø UG
1110
89
7
1415
1312
ITEMNO.
ITEMNO.

RADIAL FEED UT24 N.O. LOOP FEEDS UT25(2) FUTURE
(1) LOOP FEED UT26
FAULT INDICATOR
NORMALLY OPEN
WEATHERPROOFTAG & COIL COND.
(1) FUTURE
LOOP FEED UT27 (2) LOOP UT28
SEE US6 FOR SECONDARY CONNECTORS DETAILS
NECESSARY.
LEAVE SLACK IN CONCENTRICNEUTRALS FOR FUTUREOPERATION. ADD #2 BCSD IF
ONLY THE COMPONENTS REQUIREDIN THE MATERIAL LISTS.
NOTE: INSTALL GROUNDING LUG
THIS DRAWING IS TYPICAL. USE
FRONT VIEW OF TRANSFORMER UT28
OUT
*
*
- GROUNDING LUGTO TANK
ELBOW CAN BE INSTALLED
TERMINATE CABLES WITHENOUGH LENGTH SO EACH
ON ANY POSITION.
*
OUT IN
8
8
2 5
6
10
1
7
3
9 TAG
TAG
TAG
TAG
TAG
TAG
15
7
*11
17
16
12 13 14
3"
2"
DATE
SECTIONAPP:
RCONSTRUCTION STANDARDS
DATE:
ENGRREVISIONS
OPS
CAD FILE:PAGE:
of UT24-UT28 UT24-UT281 4 10/94 1400
SINGLE PHASEPADMOUNT TRANSFORMER ASSEMBLIES RADIAL
OR LOOP FEED WITH FEED-THROUGH BUSHING
1 7/15/02 JEH TR2 9/23/04 LB AH3 12/29//04 LB AH4 4/29/09 CM AH
F
F
Rev 4: Changed to Voltage-reset fault indicators.

Bushing, Standoff Insulated 200A
Rod, Ground 5/8" x 8'Clamp, Ground Rod 5/8", SmallCap, Protective Insulated 200A
Conductor, Wire BSDC #4 SLDConnector, Crimpet, #4 to #2 (2C4)Insert, Feed-ThroughPad, Transformer 42" x 42"Ground Lug
7
1110
89
56
43
3766
11
842929
1 237
28111 1124
21
265252
6 Rod, Ground 5/8" x 8'
Ground LugPad, Transformer 42" x 42"Insert, Feed-ThroughConnector, Crimpet, #4 to #2 (2C4)Conductor, Wire BSDC #4 SLD
Elbow, Loadbreak. 1/0, 200A, 175 mil12
11
8910
7
Elbow, Loadbreak. 1/0, 200A, 175 milVoltage-Reset Fault Indicator, 400A Trip, 1Ø UG
Cap, Protective Insulated 200AClamp, Ground Rod 5/8", Small
Bushing, Standoff Insulated 200A
1
54
23
11241
DESCRIPTIONS/NQTY.
21
13122694
UT25
1 842
454111
237929
6 376
DESCRIPTION
13122
12
281265
1 1
2694252
UT24QTY. S/N
1314
92022 1415
193212
1516 22663
22653
16
1415
1312
9201415226522663
23
22 193
Cover, Connector U.G.Connector, Z-Bar #6-500 MCM + St. LtWasher, 2" X 3" X 3/16" w/ 9/16" slotted holeNut, Spring-loaded, Galv, 1/2", UnistrutBolt, Unistrut, Padmount Tie Down
Cover, Connector U.G.Connector, Z-Bar #6-500 MCM + St. LtWasher, 2" X 3" X 3/16" w/ 9/16" slotted holeNut, Spring-loaded, Galv, 1/2", UnistrutBolt, Unistrut, Padmount Tie Down
1 454
17 Connector, Crimpet, #2 to #2 (2C2) 4551
4551Connector, Crimpet, #2 to #2 (2C2)17
DATE
SECTIONAPP:
RCONSTRUCTION STANDARDS
DATE:
ENGRREVISIONS
OPS
CAD FILE:PAGE:
of UT24-UT28 UT24-UT282 4 10/94 1400
SINGLE PHASEPADMOUNT TRANSFORMER ASSEMBLIES RADIAL
OR LOOP FEED WITH FEED-THROUGH BUSHING
1 7/15/02 JEH TR2 9/23/04 LB AH3 12/29/04 LB AH4 4/29/09 CM AH
Rev 4: Changed to Voltage-reset fault indicators.
Voltage-Reset Fault Indicator, 400A Trip, 1Ø UG
ITEMNO.
ITEMNO.

Ground LugPad, Transformer 42" x 42"Insert, Feed-Through
11109
Connector, Crimpet, #4 to #2 (2C4)Conductor, Wire BSDC #4 SLD
Elbow, Loadbreak, 1/0, 200A, 175 mil
Cap, Protective Insulated 200AClamp, Ground Rod 5/8", SmallRod, Ground 5/8" x 8'
Bushing, Standoff Insulated 200A4
78
65
321
842111
929237
UT27DESCRIPTION
2651
61
376454
11
1124281
11
2522694
QTY.2
S/N1312
7
1110
89
56
43
12
DESCRIPTIONS/NQTY.
UT26
13
16
1415
2 920
3 2266
23
14152265
193212
Cover, Connector U.G.Connector, Z-Bar #6-500 MCM + St. LtWasher, 2" X 3" X 3/16" w/ 9/16" slotted holeNut, Spring-loaded, Galv, 1/2", UnistrutBolt, Unistrut, Padmount Tie Down
Elbow, Loadbreak, 1/0, 200A, 175 mil
Bushing, Standoff Insulated 200ACap, Protective Insulated 200AClamp, Ground Rod 5/8", SmallRod, Ground 5/8" x 8'Conductor, Wire BSDC #4 SLDConnector, Crimpet, #4 to #2 (2C4)Insert, Feed-ThroughPad, Transformer 42" x 42"Ground LugBolt, Unistrut, Padmount Tie DownNut, Spring-loaded, Galv, 1/2", UnistrutWasher, 2" X 3" X 3/16" w/ 9/16" slotted holeConnector, Z-Bar #6-500 MCM + St. LtCover, Connector U.G. 3
3222111
6111123 1312
26942522652811124376
237929842193920141522652266
1514
16
1213
4541
4552Connector, Crimpet, #2 to #2 (2C2)17
4551Connector, Crimpet, #2 to #2 (2C2)17
DATE
SECTIONAPP:
RCONSTRUCTION STANDARDS
DATE:
ENGRREVISIONS
OPS
CAD FILE:PAGE:
of UT24-UT28 UT24-UT283 4 10/94 1400
SINGLE PHASEPADMOUNT TRANSFORMER ASSEMBLIES RADIAL
OR LOOP FEED WITH FEED-THROUGH BUSHING
1 7/15/02 JEH TR2 9/23/04 LB AH3 12/29/04 LB AH4 4/29/09 CM AH
Rev 4: Changed to Voltage-reset fault indicators.
Voltage-Reset Fault Indicator, 400A Trip, 1Ø UG
Voltage-Reset Fault Indicator, 400A Trip, 1Ø UG
ITEMNO.
ITEMNO.

UT28
8910
4
7
56
1
32
DESCRIPTIONQTY. S/N
11
Bushing, Standoff Insulated 200A
Rod, Ground 5/8" x 8'Clamp, Ground Rod 5/8", SmallCap, Protective Insulated 200A
28111 1124
-1
265252
Elbow, Loadbreak, 1/0, 200A, 175 mil 32
13122694
Conductor, Wire BSDC #4 SLDConnector, Crimpet, #4 to #2 (2C4)
6 376
Insert, Feed-Through 1 237Pad, Transformer 42" x 42" 1 929Ground Lug 1 842
Washer, 2" X 3" X 3/16" w/ 9/16" slotted holeConnector, Z-Bar #6-500 MCM + St. Lt
Nut, Spring-loaded, Galv, 1/2", UnistrutBolt, Unistrut, Padmount Tie Down
Cover, Connector U.G.
13
16
1415
122 920
3 2266
23
14152265
2 193
DESCRIPTIONQTY. S/N
4541
17 Connector, Crimpet, #2 to #2 (2C2) 4552
DATE
SECTIONAPP:
RCONSTRUCTION STANDARDS
DATE:
ENGRREVISIONS
OPS
CAD FILE:PAGE:
of UT24-UT28 UT24-UT284 4 10/94 1400
SINGLE PHASEPADMOUNT TRANSFORMER ASSEMBLIES RADIAL
OR LOOP FEED WITH FEED-THROUGH BUSHING
1 7/15/02 JEH TR2 9/23/04 LB AH3 12/29/04 LB AH4 4/29/09 CM AH
Rev 4: Changed to Voltage-reset fault indicators.
Voltage-Reset Fault Indicator, 400A Trip, 1Ø UG
ITEMNO.

RADIAL FEEDNORM. OPEN ORFUTURE LOOP FEED LOOP FEEDUT30 UT31 UT32
NOTE: SPECIFY I.D. TAGS AS REQUIRED.
FRONT VIEW OF TRANSFORMER(UT32 SHOWN)
H1B
H2B
H3B
H1A
H2A
H3A
LOAD SOURCE
USE #4 BSDC FOR PROTECTIVECAP GROUNDING.
(IN)(OUT)
TAG
TAG
TAG
TAG
TAG
TAG
AØ
BØ
CØ
AØ
BØ
CØ
NOTE HOW PETCONNECTORS AREORIENTED FORCLEARANCE
7
10 11
12
6 5
9
1 1
3
8
13
13
3
9
DATE
SECTIONAPP:
RCONSTRUCTION STANDARDS
DATE:
ENGRREVISIONS
OPS
CAD FILE:PAGE:
of UT30-UT32 UT301 3 10/99 1400
THREE PHASEPADMOUNT TRANSFORMER ASSEMBLIES
1 2/23/00 HWH MA2 9/23/04 LB AH3 4/29/09 CM AH
F
F
F
Rev 3: Changed to Voltage-reset fault indicators.

RADIAL FEED UT32UT31UT30
NOTE: SPECIFY I.D. TAGS AS REQUIRED.
FUTURE LOOP FEED LOOP FEED
(UT30 SHOWN)
CAP GROUNDING.USE #4 BSDC FOR PROTECTIVE
FRONT VIEW OF TRANSFORMER
NORM. OPEN OR
TAG
H2A
H3A
H1A
TAG
H2B
H3B
TAG
H1BAØ
BØ
CØ
CLEARANCEORIENTED FORCONNECTORS ARENOTE HOW PET
9
8
56
7
41
12
10 11
(OUT) (IN)SOURCELOAD
7
8
139
DATE
SECTIONAPP:
RCONSTRUCTION STANDARDS
DATE:
ENGRREVISIONS
OPS
CAD FILE:PAGE:
of UT30-UT32 UT302 3 10/99 1400
THREE PHASEPADMOUNT TRANSFORMER ASSEMBLIES
1 2/23/00 HWH MA2 9/23/04 LB AH3 4/29/09 CM AH
Rev 3: Changed to Voltage-reset fault indicators.

Rod, Ground 5/8" x 8'Clamp, Ground Rod 5/8", SmallCap, Protective Insulated, 200A
Connector, Crimpet, #4 to #2 (2C4)
Bolt, Machine, 1/2 x 2" SS w/ Bronze Nut & Belleville WasherCover, PET, 8 Position
8
1211
910
5
76
43
416
21821389
1
4
454
2129
28111 1124
3 265
12
DESCRIPTIONS/NQTY.
63
1312
UT31
Bushing, Standoff Insulated 200A 252Voltage-Reset Fault Indicator, 400A Trip, 1Ø UG 3 2694
Conductor, Wire BSDC #4 SLD 10 376
Ground Lug 2 842
Bolt, Machine, 1/2 x 2" SS w/ Bronze Nut & Belleville WasherCover, PET, 8 Position
Ground LugConnector, Crimpet, #4 to #2 (2C4)Conductor, Wire BSDC #4 SLD
Clamp, Ground Rod 5/8", SmallRod, Ground 5/8" x 8'
1211
910
8
5
76
3
416
21821389
24
18422129
454
1 281
101
3761124
3 2694Elbow, Loadbreak, 1/0, 200A, 175 mil1
DESCRIPTIONQTY. S/N
6 1312
UT32
Bolt, Machine, 1/2 x 2" SS w/ Bronze Nut & Belleville Washer11Cover, PET, 8 Position12
Elbow, Loadbreak, 1/0, 200A, 175 mil
Rod, Ground 5/8" x 8'Clamp, Ground Rod 5/8", SmallCap, Protective Insulated 200A
Conductor, Wire BSDC #4 SLDConnector, Crimpet, #4 to #2 (2C4)Ground LugConnector, PET, #2-750 Al/Cu, 6 Position10
9
78
6541
164 2182
138942
2129842
101
1376454
112413
281265
3 1312
DESCRIPTION UT30QTY. S/N
Elbow, Loadbreak, 1/0, 200A, 175 mil
13 Connector, Crimpet, #2 to #2 (2C2) 4552
4554Connector, Crimpet, #2 to #2 (2C2)13
4554Connector, Crimpet, #2 to #2 (2C2)13
DATE
SECTIONAPP:
RCONSTRUCTION STANDARDS
DATE:
ENGRREVISIONS
OPS
CAD FILE:PAGE:
of UT30-UT32 UT303 3 10/99 1400
THREE PHASEPADMOUNT TRANSFORMER ASSEMBLIES
1 2/23/00 HWH MA2 9/23/04 LB AH3 4/29/09 CM AH
Connector, PET, #2-750 Al/Cu, 6 Position
Connector, PET, #2-750 Al/Cu, 6 Position
Rev 3: Changed to Voltage-reset fault indicators.
Voltage-Reset Fault Indicator, 400A Trip, 1Ø UG
ITEMNO.
ITEMNO.
ITEMNO.

Front
TopView
Front
Box Pad, 1Ø Transformer, Fiberglass1
DESCRIPTION
1 2433
QTY. S/N
42"
38"
24"
21"
12"
7"
6"
38"
6"
15"
20"
42"
DATE
SECTIONAPP:
RCONSTRUCTION STANDARDS
DATE:
ENGRREVISIONS
OPS
CAD FILE:PAGE:
of UTB UTB1 1KJP
12/29/04 1400
SINGLE PHASEPADMOUNT TRANSFORMER
BOXPAD (BASEMENT)
ITEMNO.

NOTES:
1. THIS IS A MANUFACTURED PAD S/N 929
2. SEE UTP6 (2 OF 2) FOR INSTALLATION INSTRUCTIONS.
REV 1 - REVISIONS MARKED WITH A STAR
DATE
SECTIONAPP:
RCONSTRUCTION STANDARDS
DATE:
ENGRREVISIONS
OPS
CAD FILE:PAGE:
of UTP1 (SMTP) UTP11 1 9/94 1400
TRANSFORMER PADSINGLE PHASE 25 TO 75 KVA
1 REVISIONS MARKED WITH A STAR
1 2/23/00 HWH MA

2. SEE UTP3 FOR INSTALLATION INSTRUCTIONS.
AT WESCO IN PORTLAND, OREGON. NUMBER PH48461826G35. AVAILABLE
1. THIS IS A QUAZITE PAD. CATALOG
Notes:
CPU S/N 930.
46"48"
26 916 "
18 916"
5 12"
9 1116 "
5"
DATE
SECTIONAPP:
RCONSTRUCTION STANDARDS
DATE:
ENGRREVISIONS
OPS
CAD FILE:PAGE:
of UTP2A UTP2A1 1 4/94 1400
TRANSFORMER PADSINGLE PHASE
100 KVA1
1 2/23/00 HWH MA

SECTION "A-A"
FRONT OF TRANSFORMER
A A
(NOTE 6)LV SIDE HV SIDEPLAN VIEW
GRAVEL 5/8" MINUS
FRONT VIEW
GROUNDROD FUTURE
CL
27"
CL 19"
WITH PAD TOPCONDUIT FLUSH
GROUNDROD
SECONDARY DUCTS
36" RADIUS
24" OR 36" PRIMARY DUCTS
PAD
46"
48"
100 KVA ONLY
Notes:1. AIC FOR 100KVA TRANSFORMER IS 14,000 AMPS.
2. HIGH AND LOW VOLTAGE DUCTS MUST BE WITHIN THEIR DESIGNATED AREAS.
3. ALL DUCTS SHALL BE IN PLACE AND APPROVED PRIOR TO TRANSFORMER INSTALLATION.
4. IT SHALL BE THE RESPONSIBILITY OF THE OWNER OR HIS REPRESENTATIVE TO COMPLY WITH ALL APPLICABLE CODE REQUIREMENTS.
5. THE PAD SHALL BE FURNISHED BY THE CUSTOMER.
6. THE FRONT SIDE MUST HAVE 10' CLEAR ACCESS FOR MAINTENANCE.
7. ALL DUCT ENDS SHALL EXTEND PAST THE EDGE OF THE PAD BY 48 INCHES MINIMUM.
8. RADIUS OF SECONDARY BEND SHALL BE 24" OR 36".
9. DEPTH OF BURIAL OF CONDUITS SHALL BE AS SHOWN ON UA1.
10. THE PAD SHALL BE LOCATED SO THAT NO PART OF THE TRANSFORMER IS CLOSER THAN 10 FEET TO A COMBUSTIBLE SURFACE, WINDOWS OR DOORS OR 3 FEET TO A NON-COMBUSTIBLE STRUCTURE.
11. MINIMUM PRIMARY DUCT SIZE SHALL BE 2 INCHES.
12. THE FLAT GRAVEL SURFACE SHALL BE AT LEAST 54" x 54" WITH CONDUITS POSITIONED AS SHOWN ON THE PLAN VIEW.
13. THE 5/8" MINUS GRAVEL FOR THE PAD BASE MUST BE WELL COMPACTED TO AVOID FUTURE SETTLING. THE GRAVEL LAYER MUST BE AT LEAST 12" THICK BUT MAY REQUIRE ADDITIONAL COMPACTED MATERIAL DEPENDING ON THE EXISTING SOIL STABILITY.
14. ANY BACKFILLING TRENCHING
3.5"
42"36" to
48"
REV 1: ADDED DIMENSIONS AND AIC
1Ø PADMOUNT TRANSFORMER CONDUIT ORIENTATION (100 KVA)
DATE
SECTIONAPP:
RCONSTRUCTION STANDARDS
DATE:
ENGRREVISIONS
OPS
CAD FILE:PAGE:
of UTP3 UTP31 1 9/94 1400
1Ø TRANSFORMER PAD ORIENTATIONAND CONDUIT INSTALLATION
(100 KVA)1 ADDED DIMENSIONS AND AIC
0 2/23/00 HWH MA1 1/26/04 LB AH

1. ALL CONCRETE SHALL BE 2500 PSI AND HAVE A SLUMP OF 4" TO 6"2. REINFORCING SHALL CONFORM TO A.S.T.M. DESIGNATION A15 AND A305.3. TROWEL SMOOTH SURFACES AND BRUSH FINISH. ROUND ALL EDGES,
MANUFACTURERS NOTES:
REINFORCING SCHEDULEMARK NO. SIZE LENGTH REMARKS
123 4
45
1/2"1/2"1/2"
3'-4"5'-1"6'-9"
""
STRAIGHT
MARK 2
MARK 3
MARK 3
MARK 3
MARK 2
MARK 2
MARK 2
MARK 1
MARK 1
MARK 1
MARK 1
MARK 1
1'-3"
7'-0"
1'-3"
1'-3
"
5-4"
6"3'
-7" 1-1/2"
1-1/2"
PLAN
A A
6"
2-1/2"SECTION "A-A"
CONCRETE PAD DETAILS FOR 3Ø 75 KVA THRU. 1500 KVAPADMOUNT TRANSFORMERS
4'-6"
4- 1 1/4"NC INSERTS THROUGH THE PAD
MARK 3
1. THIS PAD IS AVAILABLE PRECAST FROM UTILITY VAULT COMPANY ORPACIFIC INTERNATIONAL PIPE ENTERPRISES, INC. (CPU S/N 2170).
2. THIS PAD IS ADAQUATE FOR UP TO 6 CONDUCTORS PER PHASE. SEE UPT4-6IF MORE CONDUCTORS ARE REQUIRED.
GENERAL NOTES:
DATE
SECTIONAPP:
RCONSTRUCTION STANDARDS
DATE:
ENGRREVISIONS
OPS
CAD FILE:PAGE:
of UTP4 UTP41 1 9/94 1400
TRANSFORMER PADTHREE PHASE
75 TO 1500 KVA0
0 2/23/00 HWH MA1 8/17/03 LB DK

PRI SEC
1
2
3
4
5
3
1
1
1
1
2
3
4
5 2
3
FRONT VIEW
SIDE VIEWTOP VIEW
7'
5'-4"
6"
2'
4'
3'-6"
NOTES:
PERMISSIBLECONDUITLOCATIONS(PRIMARY)
PERMISSIBLECONDUIT LOCATIONS(SECONDARY)
VAULT 4' X 6' X 3'-6", UTILITY VAULT CO.#644LA OR EQUAL.
COVER 4' X 4' X 6", UTILITY VAULT CO.#44-332P OR EQUAL.
PAD 64" X 84" X 6" W/15" X 54" OPENINGUTILITY VAULT CO. PAGE 53.3 OR EQUAL.
COMPONENTS
1
2
3
LOCKING BOLT SHALL BE PER REA STANDARD PENTA HEAD 1/2" BOLT ANDRECESS.
COMPONENT SHALL BE PLACED ON 12 INCHES OF 1 INCH-MINUSCRUSHED ROCK.
COMPONENT MAY BE PLACED ON UNDISTURBED EARTH OR 12 INCHESOF COMPACTED 5/8 INCH-MINUS CRUSHED ROCK.
CUSTOMER SHALL INSTALL ALL 3 COMPONENTS SHOWN, ALL SECONDARYCONDUITS INTO COMPONENT , ALL SECONDARY CABLES WITH A MINIMUM10' OF EXCESS IN VAULT FOR MAKE UP AND ENTER ONLY IN THE AREASSHOWN.
ALL PRIMARY CONDUITS SHALL ENTER THE PAD FROM OUTSIDE OF THEVAULT AND ONLY IN THE LOCATIONS SHOWN.
EQUALS MUST BE APPROVED BY CLARK PUBLICUTILITIES PRIOR TO INSTALLATION
THIS PAD IS REQUIRED IF MORE THAN 6 CONDUCTORS PER PHASE ARE BEING INSTALLED.
6
DATE
SECTIONAPP:
RCONSTRUCTION STANDARDS
DATE:
ENGRREVISIONS
OPS
CAD FILE:PAGE:
of UTP4-6 UTP4-61 1 9/94 1400
PRECAST PAD AND VAULTFOR THREE PHASE TRANSFORMERS
0
0 2/23/00 HWH MA

SECTION "A-A"
NOTES:
28750 - 1500225002075 - 300
"A" INCHESKVA
48" MIN.
6"
5/8" MINUSCRUSHED ROCK
WITH PAD TOPCONDUIT FLUSH
CRUSHED ROCK5/8" MINUS
LOW VOLTAGE SIDE
HIGH VOLTAGE SIDE
"A"
4"
FRONT SIDE (NOTE 6)
A
A
(SECONDARY COMPARTMENT)
36"-
42"
BUSHING
LC
LC
EXISTING OR CURB GRADE
A B C BC A
R2 - MINOR DRAWING CHANGES
3Ø PADMOUNT TRANSFORMER CONDUIT ORIENTATION
* (3) 2" conduits,
*
normally (1) 4"is used
**Varies by manufacturer
TYPICAL**
7'-0"
5'-4"
GROUND ROD
R1 - CONDUIT LAYOUT / ELEVATIONS
R3 - ADDED DIMENSIONS AND AIC AND REMOVED SECONDARY FUTURES
DATE
SECTIONAPP:
RCONSTRUCTION STANDARDS
DATE:
ENGRREVISIONS
OPS
CAD FILE:PAGE:
of UTP6 UTP61 2 10/98 1400
3Ø TRANSFORMER PAD ORIENTATIONAND CONDUIT INSTALLATION
2 MINOR DRAWING CHANGES
1 2/23/00 HWH MA2 7/15/02 JEH TR3 1/26/04 LB AH4 12/29/04 LB AH
1400 U
nd
erg
ro
un
d P
ad
T
ra
nsfo
rm
er
1400
U
nd
erg
ro
un
d P
ad
T
ra
nsfo
rm
ers
FACE ONE CONDUIT TOWARDS PRIMARYSOURCE OTHERS TOWARD FUTUREEXTENSION.
PRIMARY RACEWAY TO CLEAREDGE OF PAD BY 48". SIZE& NUMBER AS REQ'D. 36"RADIUS.
R4 - UPDATED FOR ALL-CONDUIT SYSTEM
1. LOCATE HIGH VOLTAGE CONDUITS IN THE CENTER OF THE HIGH VOLTAGE SIDE.
2. LOW VOLTAGE CONDUITS MUST BE WITHIN THE SHADED AREA.
3. THE CONCRETE PAD AND ALL CONDUITS SHALL BE IN PLACE AND APPROVED BY THE DISTRICT PRIOR TO TRANSFORMER INSTALLATION.
4. IT SHALL BE THE RESPONSIBILITY OF THE OWNER OR A REPRESENTATIVE OF THE OWNER TO COMPLY WITH ALL APPLICABLE CODE REQUIREMENTS.
5. THIS INTRODUCTION SUPPLEMENTS THE INDIVIDUAL CONCRETE PAD DETAILS SUCH AS UTP4 OR ANY SPECIAL DISTRICT DESIGN.
6. REFER TO UPTC FOR CLEARANCES.
7. THE PAD SHALL BE LOCATED SO THAT NO PART OF THE TRANSFORMER IS CLOSER THAN 10 FEET TO THE COMBUSTIBLE SURFACE, WINDOWS, DOORS, OR 3 FEET TO A NON-COMBUSTIBLE SURFACE.
8. ANY BACKFILLING UNDER THE TRANSFORMER PAD MUST BE BACK FILLED WITH 5/8" MINUS COMPACTED CRUSHED ROCK, COMPACTED IN LIFTS, TO PREVENT FUTURE PAD SETTLING.

FRONT VIEW
GRAVEL 5/8" MINUS
PLAN VIEW
8" MIN.
FINAL GRADE
PAD
PRIMARY DUCTS
24" OR 36" RADIUS
HV SIDE
LV SIDE (NOTE 5)
27" AA
FRONT OF TRANSFORMER
NOTES:
SECTION "A-A"
12"CL
LC
GROUNDROD
GROUNDROD
CONDUIT FLUSHWITH PAD TOP
36" RADIUS
SECONDARY DUCTS
4"
1Ø PADMOUNT TRANSFORMER CONDUIT ORIENTATION (25-75 KVA)
FUTURE
42"
42"
25-75KVA Transformer*
100KVA transformer pad is 48"x46". See standard UTP2A and UTP3.*
3.5"
DATE
SECTIONAPP:
RCONSTRUCTION STANDARDS
DATE:
ENGRREVISIONS
OPS
CAD FILE:PAGE:
of UTP6 UTP62 2 10/98 1400
1Ø TRANSFORMER PAD ORIENTATIONAND CONDUIT INSTALLATION
2 MINOR DRAWING CHANGES
1 2/23/00 HWH MA2 7/15/02 JEH TR3 1/26/04 LB AH4 12/29/04 LB AH
1. AIC FOR 25 TO 75KVA TRANSFORMERS IS 10,000A.
2. HIGH AND LOW VOLTAGE DUCTS MUST BE WITHIN THEIR DESIGNATED AREAS.
3. ALL DUCTS SHALL BE IN PLACE AND APPROVED PRIOR TO TRANSFORMER INSTALLATION.
4. IT SHALL BE THE RESPONSIBILITY OF THE OWNER OR HIS REPRESENTATIVE TO COMPLY WITH ALL APPLICABLE CODE REQUIREMENTS.
5. THE PAD SHALL BE FURNISHED BY THE CUSTOMER.
6. FRONT SIDE MUST HAVE 10' CLEAR ACCESS FOR MAINTENANCE.
7. ALL DUCT ENDS SHALL EXTEND PAST THE EDGE OF THE PAD BY 48 INCHES MINIMUM.
8. RADIUS OF SECONDARY DUCT BEND SHALL BE 24" OR 36".
9. DEPTH OF BURIAL OF CONDUITS SHALL BE AS SHOWN ON UA1.
10. MINIMUM PRIMARY DUCT SIZE SHALL BE 2 INCHES.
11. THE FLAT GRAVEL SURFACE SHALL BE AT LEAST 48" x 48" WITH CONDUITS POSITIONED AS SHOWN ON THE PLAN VIEW.
12. THE 5/8" MINUS GRAVEL FOR THE PAD BASE MUST BE WELL COMPACTED TO AVOID FUTURE SETTLING. THE GRAVEL LAYER MUST BE AT LEAST 12" THICK BUT MAY REQUIRE ADDITIONAL COMPACTED MATERIAL DEPENDING ON THE EXISTING SOIL STABILITY. ANY TRENCHING UNDER OR NEAR THE TRANSFORMER PAD MUST BE BACKFILLED WITH COMPACTED CRUSHED ROCK TO PREVENT FUTURE PAD SETTLING.
13. THE PAD SHALL BE LOCATED SO THAT NO PART OF THE TRANSFORMER IS CLOSER THAN 10 FEET TO A COMBUSTIBLE SURFACE, WINDOWS, DOORS OR 3 FEET TO A NON-COMBUSTIBLE SURFACE.

PLAN VIEWTYPICAL PAD
FRONT
OPTIONALCTR. POST
OPTIONALCTR. POST
COUPLING
DO NOT FILLCTR. POSTWITH CONC.
CAP
3'-0
" m
in.
2'-0
" m
in.
DETAIL "A"
FRONT VIEW
FINISHGRADE
4" STEEL PIPE,CONCRETE-FILLED
5'-0" MAX.(SEE NOTE 2)
CAPOPTIONAL
DIMENSIONS AND CONDUITSIZE TO BE PROVIDED BYPROJECT ENGINEER.
3'-0
" m
in.
2'-0
"
* *
*
*
18"
@45°
DATE
SECTIONAPP:
RCONSTRUCTION STANDARDS
DATE:
ENGRREVISIONS
OPS
CAD FILE:PAGE:
of UTP9 UTP91 1 9/94 1400
TYPICAL BARRIER INSTALLATION TOPROTECT PADMOUNTED EQUIPMENT
0 2/23/00 HWH MA1 5/30/07 LB AH2 12/14/09 KJP
DETAIL "A"
min
.
Rev 2: Corrected dimensions on barrier to match Commercial Electric Service Handbook.
Notes:
1. Typical locations of barriers positioning will vary depending on the following conditions. a. Physical location of equipment with respect to hazards. b. Type of equipment to be protected and accessibility required.2. If distance between corner barriers exceeds 5 ft., A ctr. post may be required similar to corner post except center post on front side of padmount device may be constructed as det. "A".3. Project Engineer will determine and indicate number, size, and position of barrier posts.4. Posts of 4" steel pipe, concrete-filled or substitute of equal strength to be set in concrete. Use same mixture as pad.5. See WAC 296-46-480 Para. 4, rules and regulations for installing electric wires and equipment.

Clark Public Utilities — Commercial Electric Service Handbook
Chapter 3: Commercial Underground Services / January 2011 � 17
Transformer location and access
Underground electrical facilities must be readily accessible by the utility duringconstruction and for future operation and maintenance. The area around padmounted electrical equipment must provide a clear and level working spaceand remain free from obstructions such as landscaping, poles, retaining walls,structures, fences, etc.
All transformers and padmounted equipment are to be located:
� Within 10 feet of a drivable surface but not closer than 5 feet (Figure 3).
� With the front of the equipment (door and lock side) facing toward the drivablesurface.
� With the transformer pad parallel to the edge of the drivable surface.
� Allowing 10 feet of clearance in front and 3 feet from the back and sides of theequipment (Figure 3).
� At least 2 feet from a sidewalk for pedestrian safety.
Figure 3 Commercial padmounted transformer location and access
drivable surface
VIEW FROM ABOVE
curb
transformer
3 ft. minimum of clear working spacefrom back and sides
5 ft. minimum to 10 ft. maximum of clear working space from drivable surface to front of transformer pad
edge of transformer pad
position transformer with door and lock facing the drivable surface
2 ft. minimum of clear working space from a sidewalk to front of transformer pad
sidewalk
door and lock

Clark Public Utilities — Commercial Electric Service Handbook
18 � Chapter 3: Commercial Underground Services / January 2011
Transformer safety clearances
Clearances from padmounted transformers to structures are measured from the nearest metal portion of the transformer to the structure or any overhang. The clearance from a building is 10 feet if the building has combustible walls, and 3 feet if the building has non-combustible walls as shown in Figure 4. Table 4 provides additional safety clearances that apply to any oil-filled electricalequipment.
non-combustiblestructure and roof
combustiblestructure and roof
20 ft.
10 ft.
10 ft. minimum
operable windowor other opening
door or other opening
gas meter
transformer
transformer
transformer
hydrant
fuel dispensingfacilities
fireescape
10 ft.
10 ft.
10 ft.
10 ft.15 ft.
6 ft.
fuelstorage
3 ft.
min.
3 ft.
Figure 4 Commercial padmounted transformer minimum safety clearances

Clark Public Utilities — Commercial Electric Service Handbook
20 � Chapter 3: Commercial Underground Services / January 2011
� If the distance between the corner posts exceeds 5 feet, a removable center post is required (Figure 5).
� If a removable center post is installed, the threaded joint requires treatment with an anti-seizing agent.
� Paint exposed section of post “traffic yellow.”
Figure 5 Guard post (bollard) installation for commercial transformers
FRONT VIEW
VIEW FROM ABOVE
3 ft.minimum
18 in.minimum
on 45°
removable center post,as required
2 ft.
domed concrete
FINAL GRADE
4 in. galvanized/steel pipe,
concrete filled
4 in. galvanized/steel pipe,
concrete filled
concrete fill
removable center post,as required
coupling
do not fillcenter post
with concrete
edge of transformer pad
commercial transformer
door and lock
edge of transformer
NOTE: Additional guard posts may be required at back and sides of transformer.