LO S A N G E L E S C O U N T YDEPARTMENT OF PUBLIC WORKS
LOS ANGELES COUNTY Los Angeles County covers over 4,000 square miles
ĂŶĚ�ŚĂƐ�Ă�ƉŽƉƵůĂƟŽŶ�ŽĨ�ϵ�ŵŝůůŝŽŶ�ƉĞŽƉůĞ�ŝŶ�ϴϴ�ĐŝƟĞƐ�and 1 million people in unincorporated areas.
27 percent of California’s residents live in LosAngeles County .
LOS ANGELES COUNTY FLOOD CONTROL DISTRICT Operates and maintains a system of flood control
ĂŶĚ�ǁ ĂƚĞƌ�ĐŽŶƐĞƌǀ ĂƟŽŶ�ĨĂĐŝůŝƟĞƐ�ƚŚĂƚ�ƉƌŽǀ ŝĚĞ�ŇŽŽĚ�ƉƌŽƚĞĐƟŽŶ�ĂŶĚ�ŝŶĐƌĞĂƐĞ�ůŽĐĂů�ǁ ĂƚĞƌ�ƐƵƉƉůLJ͘
Boundaries encompass an area of 2,752 squaremiles
&ĂĐŝůŝƟĞƐ�ŝŶĐůƵĚĞ�ϭϰ�ĚĂŵƐ�ĂŶĚ�ƌĞƐĞƌǀ ŽŝƌƐ͕ �ϰϴϱ�ŵŝůĞƐ�of open channel, 80,000 catch basins, 2,800 milesof underground storm drain, 61 pump plants, 155sediment (debris) entrapment basins, 20 low-flow diversions, 229 concrete check dams, 26 spreadinggrounds, and 3 seawater intrusion barriers
STORMWATER CAPTURE LA River – 10% stormwater capture
San Gabriel River within the San Gabriel Valley–90% stormwater capture
REGIONAL WATER SUPPLY AND DEMAND
LA Basin 56% Import 44% Local 1,515,000 AFY Demand
LA City 88% Import 12% Local (includes 1% Recycled) 621,700 AFY Demand
LA BASIN REGIONAL WATER SUPPLY AND DEMAND
COUNTY OF LOS ANGELESDepartment of Public Works
>ŽƐ��ŶŐĞůĞƐ��ŽƵŶƚLJ�ŝƐ�ŽŶĞ�ŽĨ�ƚŚĞ�ůĂƌŐĞƐƚ�ŝŶ�ƚŚĞ�ŶĂƟŽŶ͘
www.dpw.lacounty.gov @LACoWater @LAPublicWorks
COUNTY
COUNTY
VENTURA
ORAN
GE
COUNTY
SAN
BERN
ARDIN
O
COUN
TY
AV
AV
AV
BV
AV FOOT HILL
GRAN
DAV
HY
BV
BASE LINE RD
AVTO
WNE
HY
HUGHES
BVDR
ST
ST ST
BV N
N
RD
BV
FELIZLOS
AV
BV
AV
RD
6TH
PY
SAN
BV
CANY
ON
HYRD
RD
HY
ANGELES
MT
RED
BOX
PY
BV
TUJUNGARD
BV
HY
HY
RD
BV
BV
BV
ARTESIA
MAGIC
WOO
DMAN
AV
WY
BVLA
BV
VAN
NUY
S
RD
BAR
BV
BV
RD
VALLEY
BV
BV
BV
MAGN
OLIA
AV
BVST
VINE
LAND
AV
AVTA
MPA
MOUNTAIN
BV
DRCOLORADO HUNTINGTON
RD
LIVEST
RD
OAK
FRAN
CISQ
UITO
CANYON
OLD
SHERMAN
BALB
OA
FALL
BROO
KAV
MAYODR
LYONS AV
RD
SAND
THE
RD
SAN
ARRO
YO
RD
ARROWAV
DRFOOTHILL
FOOTHILLSAN FERNANDO
BV
RD
ROSCOE
BV
DEVONSHIRE
HY
AZUS
A
WILSHIRE
RD
RD
KANAN
SUNSET
BV
RD
BV
AV
MT
ALOSTA
BV
LAKE
BV
ST
IMPERIAL
MT
RD
BL
VENTURA
BLVICTORY
WY
CARSON
COAST
25THST
ALAM
ITOS A
V
AV
BVMA
IN
B ST
ST
ST
ARTESIA
BV
NORW
ALK
FIRESTONE
ATLA
NTIC
BV
BV
BV
HYLEFFINGWELLRD
BV
COLIM
AOFF
CUT
RD
NORW
ALK
RD
BV
AV
AV
ST CARSON
7TH ATLA
NTIC
WILLOW
BV HY
ST
30TH
AVENUE PHILL
HY
BIG PINES
10TH
10 TH
RD
RD
RD
60TH
90TH
50 TH
47TH
ST E
PEARBLOSSOM
PEARBLOSSOMHY
HY
HY
ANTELOPE
ST E
165T
H
PALMDALE
SIERR
A
BV
AVENUE P
240T
H ST
E
AVENUE O
87 TH
ST E
FORT TEJON
RD
170T
HBO
B'S
GAP
RD
VALYERMORD
HY
RD
RD
RD
MULHOLLAND
VIRGE
NES
LAS
CANY
ONMA
LIBU
MULHOLLAND
VALLE
YCI
RCLE
SUNL
AND
TUXFORD
HILL
GLEN
DALE VE
RDUG
O
HUNTINGTON
MISSION
MAIN
PECK
GABRIEL
BALD
Y
BOUQUET
SOLEDAD CANYON
SIERR
A
SECO
CYN
FERN
ANDO
VALENCIA
RDSAN
CANY
ON
CANYON
BIG
CRES
TANGELES
FOREST
GLEASON ANGELES
CREST
FOOT
AV
WILSON
PACIFIC
SEPULVEDA
HAWT
HORN
E
WEST
ERN WILM
INGT
ON
BIG
ROCK CREEK
BROADWAY
VALLEYMAIN
HACIE
NDA FULLERTON
LITTLE
TUJU
NGA
DIAMOND
MISSION
GRANDBREA CN
BREA
CNMANCHESTER
BREA
ROSECRANS
OCEAN
ALAM
EDA
ROSE
MEAD
CRYSTALLA
KE
CANY
ON
SPUNKY
CANYON
GODDEKA
NAN
DUME
TOPA
NGA
SUNSET
CANY
ON
WHITTIERLINCOLN
HENRY
TEMPLIN
LAS TUNAS DR
SLAUSON
GLENDORA A
V
STGA
FFEY
SEPU
LVED
A
PACI
FICAV
LAKE
WOO
D
BV
SA N TA CLARA
RIVER SANTA CLARA
RI V E R
LOS
ANGELES RIV ER
LOS
ANGE
LES
R IV E
R
LOS ANGELES
RIVER
SAN
GABR
IEL
RIVER
SAN
GABR
IEL
RIVER
WEST FORK
SAN RIV E RGABRIELE AST
F ORKG ABRIEL RIVER
S AN
ENCINORESERVOIR
UPPERFRANKLINRESERVOIR
HOLLYWOODRESERVOIR
SILVER LAKERESERVOIR
LEGG LAKE
BIGSANTAANITARESERVOIR SAWPIT
CANYONRESERVOIR
COGSWELLRESERVOIR
SAN GABRIELRESERVOIR
MORRISRESERVOIR
CRYSTALLAKE
BIG DALTONRESERVOIR
SAN DIMASRESERVOIR SAN ANTONIO
RESERVOIR
THOMPSONCREEKRESERVOIRLIVE OAK
RESERVOIR
PUDDINGSTONERESERVOIR
BIG TUJUNGARESERVOIR
PACOIMARESERVOIR
HANSENDAM
LITTLE ROCKRESERVOIR
PALMDALERESERVOIR
LAKEUNA
DRY CANYONRESERVOIR
CASTAICRESERVOIR
PYRAMIDRESERVOIR
SEPULVEDA FLOODCONTROL BASIN
STONECANYONRESERVOIR LOWER
FRANKLINCANYONRESERVOIR
MALIBULAKE
HARBORLAKE
CHATSWORTHRESERVOIR
WHITTIER NARROWS DAM
SANTA FE DAM
EATONWASHDAM
DEVIL'SGATEDAM& RES
LOS ANGELESRESERVOIR
QUAILLAKE
FAIRMONTRESERVOIR
LAKEHUGHES LAKE
MUNZ ELIZABETHLAKE
BOUQUETCANYONRESERVOIR
CHINO
BIG DALTONCHANNELBUENA VISTA
ARCADIAWASH
WASH
WALNUT CHANNEL
CREEK
NORT
H FO
RK
POLE CANYON
CANYON
SAND CANYON
HANSENHEIGHTSCHANNEL
PACOIMA
IRON CANYONRABBIT CANYON
CHANNEL
DALTON
SPILL
WAY
SPRINGSLIVE OAK
SAN
RUBIO
BEATTY CANYONCHANNEL
WASH
LITTLE
WASHWASH
WASH
BIG DALTON
WASH
DIMASSAN
WASH
CREE
K
THOMPS
ON
CREEK
CREEK
CREE
KCO
YOTE
LOS CERRITOS
CHANNEL
CHAR
TER
OAK
CREEK
CHANNEL
MANSFIELD
EATON
WASH
RIO HONDO C
HANNEL
DOM INGUEZ
CHA NNEL
COM PTON
COMPTONCREEK
RIO HONDO
CHAN
NEL
ARRO
YO SE CO
CHANNE L
VERDUGOWA SH
LA TUNA CANYON
TUJUNGA WASH
PACOIMA
WASH
PACOI
MAW
ASH
BULL
CREE
K
CABA
LLER
OCR
EEK
WILB
U RCR
E EK
SANTASUSA NA CREEK
DRYC ANYON
BALLONA
CREE
K
CENTINE LACREEK
BALLONA CREEK
BENEDICT CANYON CHANN EL
REXFORD
COLD
WAT
ERCH
ANNE
L
CANY
ONRU
STIC S AN TA
MONI
CA
C A NYONCH
ANNE
L
ALHA MBRAW
ASH
PAS QUAL
CREE K
MILL CREEK
BROWNS
CRE EK
LIMEK
ILNCR
EEK
ALI S
OCR
EE
K
PLACERITANE WHALL
C HANNEL
SANTA CLARA
RIVER SOUTHFORK
HASLE YCR
EEK
CANYON
SAN
FRAN
CISQ
UITO
CANY
ONDR
YCA
NYON
HAS K
ELL C
ANYO
N
BOUQU ETC
ANYO
NCH
ANNE
L
PLUM CANYONC HANNEL
VASQUEZ CANYON
TEXAS CANYON
MINTCA
NYONC HA
NNEL
S A N JOSE PUENTE CREEK
EAST BRANCH
SAN
JOSE
CREEK
CREEK
SOUTH
SAN JOSE
CREEKBEL L
CHANNEL
SEPULVEDA CH ANNEL
SAWTELLE
CHANNEL
VIO L IN
HANSEN BASIN
& F C MAIN. YARD
RIVAS SS
COYOTE
SAN M ARTINEZ-CHIQ UITOC ANYON
CANY O N
CAST
AIC
SANTA MONICABAY
PACIFIC OCEAN
PT VICENTE
PT FERMIN
MALIBU PT
MARINADEL REY
WILL
MIN
GTON
DRAI
N
CHAN
NEL
ESC ONDIDO
CANYON
CHANNELACTON CANYON
CHAN
NEL
CALIFORNIA
EAST
PALM
DALE
PEARLAND
CHANNEL
AQUEDUCT
LITTL
ERO
CKW
A SH
PEARBLOSSOMCHANNEL
ROCKCREEK
BIGROCK
WASH
RED ROVER
CANYONCH
GOVE
RNOR
CYN.
ANAVERDE
CH.
CHESEBORO CANYON CHANNEL
SAN GABRIEL MOUNTAINS
HAIN
ES D
B
LOPEZ CYN
CH. KAGE
L CYN
CH.
LITTLE TUJUNGA WASH
BURBANK WESTERN SYSTEM
RUBIO WASH
PUDD
INGS
TONE
CH.
EMER
ALD
MARS
HALL
CYN W
ASH
LIVE OAK
WASH
SANTA MONICA MTS.
SYCAMORECHANNEL
PALOS VERDES HILLSPT
ROCKY
LOS ANGELES COUNTY FLOOD CONTROL DISTRICT NORTHERN BOUNDARY
MALIBUCREEKWATERSHED
BALLONACREEKWATERSHED
SANTA MONICA BAYWATERSHEDS
SANTA MONICA BAYWATERSHEDS
DOMINGUEZCHANNEL
WATERSHED
WATERSHEDPORTIONDRAINING TOORANGE COUNTY
WATERSHED PORTIONDRAINING TOSAN BERNARDINO COUNTY
WHITTIER NARROWS W CDIVERSION CANAL
BUENA VISTA
S B
SAN GABRIELCANYON S G
SIERRA MADRE
DAM
PUDDINGSTONE DIVERSION
LOS ANGELES RIVER WATERSHED
SAN GABRIEL
RIVER WATERSHED
SANTA CLARA RIVER
WATERSHED
SANANTONIOS.G.
SANTA FERESERVOIR S.G.
RIO HONDOCOASTAL
BASIN S.G.
PECK RDS.B.
SANTAANITAS.G.
EATONS.G.
PACOIMAS.G. HANSEN
S.G.
THOMPSONCK. S.G.
TUJUNGA S.G.
SAWPITS.G.
DOMINGUEZGAP S.G.
SAN GABRIELCOASTAL BASIN S.G.SAN GABRIEL
RIVER (LOWER)
BIG DALTON S.G.
FORBESS.G.
IRWINDALE S.B./MANNING PITSAN GABRIEL
RIVER (UPPER)
CITRUSS.G.
LITTLE DALTON S.G.
BRANFORD S.B.
LIVE OAKS.G.EATON S.B.
BEN LOMOND S.G.
WALNUT S.B.
LOPEZS.G.
SAN DIMAS CYN S.G.
FISH CYNS.G.
§̈¦5
§̈¦5
§̈¦10
§̈¦10
§̈¦10§̈¦10
§̈¦105
§̈¦105
§̈¦710
§̈¦710
§̈¦110
§̈¦110
§̈¦605
§̈¦605
§̈¦405
§̈¦405
§̈¦405
§̈¦210
§̈¦210
£¤101 £¤101
£¤101
}2
}71
}91}91
}90
}60
}60
}60
}57
}57
}57
}14
}170
}210
}110
}134
}118
Survey/Mapping & Property Management Division, Mapping & GIS Services Section
REF:
\\pwg
isfile
\GIS
_Serv
ices\M
PMGI
S\pro
jects\
wmd\F
acilit
ies\W
ater F
acilit
ies\M
ajor F
acilit
ies1.m
xd
DAT
E: Fe
b 24,
2015 MAJOR FACILITIES
MAINTENANCE RESPONSIBILITIESLEGEND
LOS ANGELES COUNTYDEPT. OF PUBLIC WORKS
UNITED STATES ARMYCORPS OF ENGINEERS
CHANNELS
RESERVOIR
SPREADING GROUND
RESERVOIRDAMS / RESERVOIRS0 2 4 6
Miles
I
COUN
TY
VENTURA
BALLONA CREEK PACIFIC OCEAN (STA.0+00) TO 100' NO. OF VISTA DEL MAR (STA.23+46.99) BENEDICT CANYON CHANNEL (STA.304+00) TO WASHINGTON BLVD. (STA.391+02.48)________________________________________________________________________________
LOS ANGELES RIVER PACIFIC OCEAN (STA.0+00) TO 600' SO. OF OCEAN BLVD. (STA.16+00) 200' SO. OF SOUTHERN AVE. (STA.685+00) TO 1500' E. OF LANKERSHIM BLVD. (STA.592+00) SEPULVEDA FLOOD CONTROL BASIN 400' W. OF SEPULVEDA BLVD. (STA.969+89.01) 200' W. OF LOUISE AVE. (STA.1131+69.50)BURBANK WESTERN LOS ANGELES RIVER TO VICTORY BLVD.SYSTEM STA.47+36.57)COMPTON CREEK ALAMEDA BLVD. (STA.199+31.00) TO 1500' NO. OF EL SEGUNDO BLVD. (STA.411+66)HAINES CANYON 100' E. OF PLAINVIEW AVE. (STA.123+30.00) TO HAINES CANYON DEBRIS BASIN (STA.216+62.00)VERDUGO WASH LOS ANGELES RIVER TO 150' E. OF SAN FERNANDO RD.SYCAMORE CHANNEL LOS ANGELES RIVER TO 530' SO. OF SAN FERNANDO RD.RIO HONDO WHITTIER NARROWS FLOOD CONTROL BASIN 500' SO. OF WHITTIER NARROWS DAM (STA.437+23.71) TO 600' NO. OF GARVEY AVE. (STA.638+00.00)ALHAMBRA WASH VALLEY BLVD. (STA.171+30.00) TO ROSES RD. (STA.295+63.43)SAN PASQUAL ALHAMBRA WASH (STA.1+34.91) TOWASH 250' NO. OF PINE ST. (STA.93+12.60)________________________________________________________________________________SAN GABRIEL RIVER WHITTIER NARROWS FLOOD CONTROL BASIN 1250' E. OF PECK RD. (STA.1173+50.00) TO THIENES AVE. (STA.1224+30.00) 600' SO. OF FOOTHILL BLVD. (STA.8+40.00) TO MOUTH OF CANYON (STA.176+15.00)SAN JOSE CREEK SAN GABRIEL RIVER (STA.31+26.83) TO STA.79+25.00)
UNITED STATES ARMY CORPS OF ENGINEERSMAINTAINED CHANNEL REACHES
(DISTANCES NOTED ARE APPROXIMATE VALUES)
LOS ANGELES COUNTYFLOOD CONTROL DISTRICT
COUN
TY
Regional Water Reliability – Spreading Grounds
Hansen Spreading Grounds - Empty (Aerial images courtesy of Google earth)
Hansen Spreading Grounds- Full (Aerial images courtesy of Google earth)
SUN VALLEY WATERSHED
RORY M. SHAW WETLANDS PARK
The Sun Valley—Rory M. Shaw Wetlands Park Project is identified as a major component of the Sun
Valley Watershed Management Plan, a plan developed by the Los Angeles County Flood Control District
to solve the major flooding problem, while retaining all stormwater runoff from the watershed, increasing
water conservation, recreational opportunities, and wildlife habitat, and reducing stormwater pollution.
EXISTING LANDFILL SITE
PROPOSED WETLANDS PARK
Project Description
The Sun Valley Watershed—Rory M. Shaw Wetlands Park
Project is a collaborative effort amongst the Los Angeles
Flood Control District, the City of Los Angeles, and the Sun
Valley Watershed Stakeholders Group to address flooding
downstream of the Strathern Pit site, at the intersection of
Tujunga Avenue and Strathern Street.
The project proposes to convert a 46-acre, engineered, inert
landfill into a multi-purpose wetlands park. A storm drain
system will be constructed to collect stormwater runoff from
the upstream 929-acre drainage area and convey them into
the project site. Detention ponds and wetlands will be
constructed to capture and treat stormwater runoff to provide
water quality enhancement. The treated flows will then be
pumped to the adjacent Sun Valley Park for infiltration into
existing infiltration basins, providing recharge into the
groundwater. The water conservation benefit is expected to
be 590 acre-feet per year. In addition to water quality
improvements, the constructed wetlands will also enhance
native vegetation and create opportunities for wildlife
habitat. The project will provide an additional 46 acres of
open space recreation to a community that is currently
underserved for recreational opportunities. Proposed
recreational enhancements include trails, active recreational
amenities, educational signage and restrooms.
The total cost for design and construction is estimated at $52
million and will be funded by the Los Angeles County Flood
Control District, the Los Angeles Department of Water and
Power, and Proposition O grant funds. The Project is
currently in the design phase .
SUN VALLEY WATERSHED
SUN VALLEY PARK DRAIN AND
INFILTRATION SYSTEM PROJECT
The Sun Valley Watershed—Sun Valley Park Drain and Infiltration System Project is identified as a major
component of the Sun Valley Watershed Management Plan, a plan developed by the Los Angeles County
Flood Control District to solve the major flooding problem, while retaining all stormwater runoff from the
watershed, increasing water conservation, recreational opportunities, and wildlife habitat, and reducing
stormwater pollution.
Project Description
The Sun Valley Watershed – Sun Valley Park Drain and Infiltration System Project converted an existing
municipal park into a flood mitigation, water quality treatment, and water conservation multi-use site.
Localized flooding is alleviated in the area as stormwater runoff from the 21-acre drainage area is collected
through a constructed storm drain system to the Sun Valley Park. Runoff is routed through a water quality
treatment system at the park to remove suspended solids and heavy metals. The treated runoff is then
directed into two underground infiltration basins where the water is naturally filtered and recharged into
the groundwater aquifer. The water conservation benefit is estimated to be 30 acre-feet per year. The
infiltration basins are buried beneath the soccer and baseball fields to maintain the park’s functionality.
Vegetated swales with California native plants were also strategically placed throughout the park to treat
runoff from the surrounding areas. In addition, the project also included enhancements to the park’s
recreational amenities, such as new soccer and baseball fields, bleachers, sports lighting, and interpretive
signage.
Construction of the project was completed in 2006 with total project cost of approximately $7 million.
The project was funded by the Department of Water Resources (Local Groundwater Assistance) grant, a
Proposition 12 (Murray-Hayden) grant received by TreePeople, and the Los Angeles County Flood
Control District.
Designed By: CH2MHill
Constructed by: Southwest Engineering, Inc.
Operated and Maintained By: Los Angeles County Flood Control District, City of Los Angeles Bureau of
Sanitation, and City of Los Angeles Department of Recreation and Parks
DOMINGUEZ GAP WETLANDSMULTI-USE PROJECT
The Dominguez Gap Wetlands Multi-Use Project is located on the east bank of the Los Angeles River justsouth of Del Amo Blvd in the City of Long Beach. The project was identified in the Los Angeles RiverMaster Plan, adopted in 1996, as one of the top five demonstration projects that would provide floodmanagement, water quality and environmental enhancements, and recreation and educationalimprovements.
Project Description
The Dominguez Gap Wetlands Multi-Use Project converted an existing, 37-acre, spreading ground basininto a multi-benefit wetlands. Flows from the Los Angeles River and local urban runoff are routedthrough the basin to sustain a year-round aquatic habitat for riparian plant species and native wildlife. Thewetland also removes pollutants such as heavy metals, organic carbons, oil, grease, and nutrients from therunoff. The treated runoff is then directed into the Dominguez Gap Spreading Grounds West Basin forstorage and groundwater recharge. During high flows from the surrounding tributary areas, flows from thewetlands are pumped into the Los Angeles River. In addition, the wetlands provide increasedopportunities for open space and passive recreational amenities, such as an equestrian trail, bike path andwalkways that are accessible to the public and interpretive signage.
Construction of the project began in 2006 and was completed in 2008 with a total project cost ofapproximately $7.1 million. The project was funded by Proposition 13 CALFED grant, Proposition 40funds administrated through the Rivers and Mountains Conservancy, the California Coastal ConservancyWetland Recovery Project, and the Los Angeles County Flood Control District.
Designed By: CH2MHillConstructed by: Environmental Construction, Inc.Operated and Maintained By: Los Angeles County Flood Control District, City of Long Beach Departmentof Parks, Recreation, and Marine
Pre-Construction Photo: Spreading Ground Basin Post-Construction Photo: Wetlands
The Tujunga Wash Ecosystem Restoration Phase I Project was a collaborative effort between the Los
Angeles County Flood Control District, the Santa Monica Mountains Conservancy and the Mountains
Recreation and Conservancy Authority to restore both sides of the Tujunga Wash channel between Vanowen
Street and Oxnard Street and provide open space and passive recreational opportunities.
Project Description
The Tujunga Wash Ecosystem Restoration Phase I Project restored a one-mile reach along the Tujunga Wash
and provides open space within the Valley Glen community. The project restored riparian habitat, allows for
groundwater recharge, enhances water quality, and serves as a model for the creation of a sustainable and
healthy alternative stream system in a dense urban setting. In addition, both banks of the channel include
pedestrian walkways, seating areas, native and drought-tolerant landscaping and new entryways.
Construction of the project was completed in 2007 with total project cost of approximately $7 million. The
project was funded by County Supervisor Zev Yarovslavsky (3rd District) through Proposition A, the
Department of Water Resources, the Resources Agency, and Los Angeles County Flood Control District. The
project was managed by the Santa Monica Mountains Conservancy and Mountains Recreation and
Conservation Authority.
Designed By: Los Angeles County Flood Control District, Mountains Recreation and Conservation Authority
Operated and Maintained By: Mountains Recreation and Conservation Authority
TUJUNGA WASH
ECOSYSTEM RESTORATION PHASE I
Before construction After construction —Completed 2007
Tujunga Wash is a nine-mile concrete rectangular channel that conveys runoff from Hansen Dam to the
Los Angeles River. The Tujunga Wash Ecosystem Restoration Project is a collaborative effort between the
Los Angeles County Flood Control District and the U.S. Army Corps of Engineers to restore both sides of the
Tujunga Wash channel between Vanowen Street and Sherman Way.
This project creates a new naturalized stream that meanders along the west bank of the channel. Both banks
includes pedestrian walkways, seating areas, native and drought-tolerant landscaping, and new entryways.
This project greatly enhances the environment by providing more than 10 acres of open space in an area that
significantly lacks this resource. The project also restores riparian habitat and serves as a model for a
sustainable and healthy stream system in a dense, urban setting.
The Corps of Engineers, under Section 1135 of the Water Resources Development Act, performed a
reconnaissance study and determined the project was eligible for Federal participation and funding. Under this
program, the Corps of Engineers funded 75 percent and the Flood Control District funded 25 percent of the
total project costs. Construction of the project was completed in July 2012 with a total project cost of
approximately $7 million.
This project is an extension of the Tujunga Wash Greenway and Stream Restoration Phase I between
Vanowen Street and Oxnard Street which was completed in 2007. In total, both projects provide over 1.75
miles of enhanced Flood Control right-of-way.
TUJUNGA WASH
ECOSYSTEM RESTORATION PHASE II
before construction After construction —Completed 2012
Wate
r S
up
ply
& D
em
an
d
LA
Ba
sin
Stu
dy
Fin
din
gs
LOS ANGELES BASIN
STORMWATER CONSERVATION STUDY
The Los Angeles Basin Stormwater Conservation Study (LA Basin Study) is assessing the region’s major water conservation and flood control infrastructure to prepare for future changes in climate and population. The LA Basin Study is a long-range planning effort that is evaluating the potential of the existing Los Angeles County Flood Control District (LACFCD) facilities and other new stormwater capture concepts to increase the local water supply under an uncertain future. Detailed scientific, engineering, and economic analyses are being conducted to help address future water supply demands and challenges as a result of climate change and population growth. The study is a collaboration between the LACFCD and the Bureau of Reclamation to ensure continued reliability and further enhancement of stormwater as a locally sustainable supply source. This effort is estimated to cost $2.4 and take three years to complete.
The LA Basin Study has completed the analysis of the following:
1. Future climate change projections and hydrologic modeling
2. Water supply and water demand projections 3. Existing infrastructure response to future
conditions
The study is now focusing its efforts on developing stormwater capture concepts that can help the region become more resilient to climate change by taking steps to further secure stormwater as a local water supply. These concepts will undergo an economic cost-benefit analysis before the final recommendations are made in December 2015.
P:\wmpub\Integrated FCD Planning\Planning Studies\LA Basin Stormwater Conservation Study\Flyers, Factsheets & News Flashes\Factsheets\Factsheet - LA Basin Study (20150224_CA Testimony).docx
Study Partners »
Los Angeles County Flood Control District (LACFCD) U.S. Department of the Interior - Bureau of Reclamation (Reclamation) U.S. Army Corps of Engineers Over 35 members on the Stakeholder Technical Advisory Committee such as LADWP, MWD,
TreePeople, Council for Watershed Health, USGVMWD, etc.
Objectives »
Evaluate existing water conservation under future conditions
Evaluate potential new facilities & operational changes for climate change
Study Tasks »