Page 1: Εταιρική Παρουσίαση - ALFA PI4 5. Άλφα Πι Εταιρική Παρουσίαση Alfa Pi Company Profile. ALFA PI S.A. is a Construction and Engineering Company,
Page 2: Εταιρική Παρουσίαση - ALFA PI4 5. Άλφα Πι Εταιρική Παρουσίαση Alfa Pi Company Profile. ALFA PI S.A. is a Construction and Engineering Company,

Εταιρική ΠαρουσίασηCompany Profile

Page 3: Εταιρική Παρουσίαση - ALFA PI4 5. Άλφα Πι Εταιρική Παρουσίαση Alfa Pi Company Profile. ALFA PI S.A. is a Construction and Engineering Company,

4 5

Άλφα ΠιΕταιρική Παρουσίαση

Alfa PiCompany Profile

ALFA PI S.A. is a Construction and Engineering Company, specialized in Engineering, Erection, Commissioning and Maintenance of Mechanical works, including erection of equipment, piping network systems - metallic or plastic - and metallic constructions of any kind in Petrol Refineries, Food Industries and other Industrial Plants.

ALFA PI S.A.was established in January 1991.

ALFA PI S.A. has already executed important works in metallic (carbon or stainless steel) pipe networks and mechanical installations in petrol refineries, food and medical industries and other industrial plants, as analytically described hereinafter.

ALFA PI Ltd. disposes adequate number of specialized technicians, such as welders for various kinds of metals (carbon steel, stainless steel, Cr-Mn-Alloy etc.), who are certified by competent organisations (TUEV, LLOYD’S e.t.c.) in order to comply with the high standard requirements in Quality Control of its Clients.

ALFA PI S.A. undertakes also metallic constructions of any kind, including liquid storage tanks (with rigid or floating roof), as well as installation and maintenance of industrial equipment such as towers, vessels, heat exchangers, furnaces e.t.c. in petrol refineries and other industrial plants.

ALFA PI S.A. is also specialised in the installation of GRP (glass reinforced pipe), which is considered as the most suitable material to meet the high requirements of installations with severe specifications, such as Petrol refineries and other industrial installations, including installations of networks for liquids or gases.

The personnel is specially trained by AMERON in installation of GRP pipes and the in-situ fabrication of GRP fittings and special pieces. It should be noted that Petrol Companies pre-fer the GRP pipes in their installation, thus our Company has already installed GRP pipes in 110 gas stations of MOBIL in Greece.

Η ΑΛΦΑ ΠΙ A.E. είναι Τεχνική Εταιρεία που ιδρύθηκε τον Ιανουάριο του 1991 και ασχολείται με την Μελέτη και Κατασκευή Μηχανολο-γικών Εργασιών, καθώς επίσης και την εγκατάσταση, θέση σε λειτουργία και συντήρηση των μηχανολογικών εξοπλισμού και συστημά-των δικτύων σε Διυλιστήρια και άλλες Βιομηχανικές εγκαταστάσεις.

Η ΑΛΦΑ ΠΙ A.E. έχει ήδη εκτελέσει σοβαρές εργασίες σε δίκτυα μεταλλικών (χαλύβδινων, χρωμιούχων, ανοξείδωτων κλπ.) σωληνώσε-ων και μηχανολογικών εγκαταστάσεων σε Διυλιστήρια πετρελαίου, Βιομηχανίες τροφίμων και σε άλλες Βιομηχανικές μονάδες, όπως εκτενώς περιγράφεται στη συνέχεια.

Περιλαμβάνεται δε στο προσωπικό της επαρκής αριθμός ειδικών τεχνιτών, όπως ηλεκτροσυγκολλητών ειδικευμένων στα διάφορα είδη μετάλλων (ανθρακούχων χαλύβων, ανοξείδωτων, χρωμιονικελιούχων κλπ.), που διαθέτουν τα κατάλληλα πιστοποιητικά από επισή-μους οργανισμούς, όπως TÜV, LLOYD’S κ.α. ώστε να ικανοποιούν τις αυξημένες απαιτήσεις ποιότητος των πελατών μας.

Η ΑΛΦΑ ΠΙ A.E. αναλαμβάνει επίσης μεταλλικές κατασκευές πάσης φύσεως, ως και την εγκατάσταση Βιομηχανικού εξοπλισμού εργο-στασιακών μονάδων, ανέγερση και συντήρηση εξοπλισμού διυλιστηρίων (πύργων, φούρνων και αντιδραστήρων διυλίσεως, δοχείων, εναλλακτών, αερόψυκτων, πύργων ψύξεως κ.λ.π.) ως και δεξαμενών σταθερής ή πλωτής οροφής, διαθέτει δε το κατάλληλο τεχνικό προσωπικό υψηλών προδιαγραφών για τις αυξημένες απαιτήσεις των εγκαταστάσεων διυλιστηρίων και άλλων βιομηχανικών εγκατα-στάσεων.

Επιπλέον η ΑΛΦΑ ΠΙ A.E. εξειδικεύτηκε στην εγκατάσταση σωληνώσεων GRP (glass reinforced pipe) που θεωρείται το καταλληλότερο υλικό για εγκαταστάσεις υψηλών προδιαγραφών, όπως σε διυλιστήρια πετρελαίου και άλλες εγκαταστάσεις με δίκτυα βιομηχανικών, υγρών αλλά και αερίων.

Το προσωπικό της ΑΛΦΑ ΠΙ A.E. έχει εκπαιδευτεί ειδικώς από την AMERON στην εγκατάσταση σωλήνων GRP καθώς και στην επί τόπου κατασκευή εξαρτημάτων και ειδικών τεμαχίων GRP. Η ποιότητα της τελικής εργασίας βεβαιώθηκε από την TÜV Γερμανίας. Ας σημειωθεί ότι οι εταιρείες καυσίμων προτιμούν τα δίκτυα σωληνώσεων GRP στις εγκαταστάσεις τους και η εταιρεία μας έχει ήδη εγκαταστήσει σωληνώσεις GRP σε 110 σταθμούς καυσίμων της MOBIL.

Page 4: Εταιρική Παρουσίαση - ALFA PI4 5. Άλφα Πι Εταιρική Παρουσίαση Alfa Pi Company Profile. ALFA PI S.A. is a Construction and Engineering Company,

6 7

BASIC DATA

Main premises: 1 G. Mpasiakou & Anastaseos Christou Str, 19004 Spata-Greece Telephone: + 30 (210) 94 13 055-6, Fax:+ 30 (210) 94 13 073 Site: www.alfapi.gr E-mail: [email protected] / [email protected] Permanent Staff: 25 Employees and TechniciansMajor Shareholder & Managing Director: Anastasios Perifanis

The permanent staff of the company is of various specialities, as required to accomplish the construction of all entrusted projects successfully. In addition, the services of several spe-cialists are used on a project to project basis. Manpower increases according to the re-quired needs of the various works.

ALFA PI S.A. is certified by GL according to ISO 9001:2008 for “Industrial Projects in Public and Private Sector”. The capabilities of ALFA PI S.A. steam from the experience of its staff, who has long term records and carry credible experience in Engineering, Planning, Project Management, Con-struction, Supervision, Commissioning, Start-Up and Maintenance or Operation of Industrial Projects.

Consequently ALFA PI S.A. is for position to offer a complete package of services for turn-key projects.

The Company comprises also :Planning DepartmentProject Quality Assurance Control DepartmentSite Follow up and Cost Control DepartmentProcurement DepartmentDesign Department (including AUTOCAD Drafting)

ΒΑΣΙΚΑ ΣΤΟΙΧΕΙΑ

ΚΕΝΤΡΙΚΑ ΓΡΑΦΕΙΑ: Γ. Μπασιάκου 1 & Αναστάσεως Χριστού - Σπάτα 19004 Τηλ.: 210 9413055-6, Fax : 210 9413073 Site: www.alfapi.gr E-mail: [email protected] / [email protected]

Μόνιμο Τεχνικό Προσωπικό: 25 υπάλληλοι και τεχνίτεςΠρόεδρος & Διευθύνων Σύμβουλος: Αναστάσιος Περιφάνης

Το μόνιμο προσωπικό της Εταιρείας είναι διαφόρων ειδικοτήτων όπως απαιτείται για την επίτευξη της επιτυχίας της κατασκευής. Επίσης συνεργάζεται με αρκετούς εξειδικευμένους οργανισμούς αναλόγως της περιπτώσεως. Πρόσθετο τεχνικό προσωπικό αυξομειούται ανάλογα με τις ανάγκες των εργασιών.

Οι ικανότητες εξειδικεύσεως της ΑΛΦΑ ΠΙ Α.Ε. πηγάζουν από την εμπειρία των μελών της, που διαθέτουν αρχεία μακράς διαρκείας και δόκιμες εμπειρίες στη Μελέτη, Διοίκηση Έργων, Επίβλεψη κατασκευής, Εκκίνηση και Λειτουργία της εγκαταστάσεως, με δυνατότητα παροχής πλήρους πακέτου υπηρεσιών για έργα ‘’κλειδί στο χέρι’’.

Όπου απαιτείται, η ΑΛΦΑ ΠΙ Α.Ε. λειτουργεί υπό διαδικασίες εξασφάλισης ποιότητος (QUALITY PLAN) σύμφωνα με το ISO 9001 και αναπτύσσει τα δικά της εγχειρίδια διαδικασιών εξασφαλίσεως ποιότητος.

Η εταιρεία διαθέτει επίσης : Τμήμα Προγραμματισμού και ΑνάπτυξηςΤμήμα Παρακολούθησης/ Ελέγχου Έργων Τμήμα Υποστήριξης/ Παρακολούθησης ΕργοταξίωνΤμήμα Έρευνας Αγοράς και ΠρομηθειώνΤμήμα Μελετών και Σχεδιαστικό με AUTOCAD

Page 5: Εταιρική Παρουσίαση - ALFA PI4 5. Άλφα Πι Εταιρική Παρουσίαση Alfa Pi Company Profile. ALFA PI S.A. is a Construction and Engineering Company,

8 9

ISO CertificationΠιστοποίηση ISO

Page 6: Εταιρική Παρουσίαση - ALFA PI4 5. Άλφα Πι Εταιρική Παρουσίαση Alfa Pi Company Profile. ALFA PI S.A. is a Construction and Engineering Company,

10 11

Alfa PiΕxperience

Since its establishment, ALFA PI S.A. has completed works of large scale in Refineries and other important Industrial Plants, including :

• mechanical installations for HVAC, plumbing, sewage, automation and other systems

• repair, calibration and commissioning of all types of on-off, control, relief etc. valves

• prefabrication and erection of industrial network piping, metallic or plastic, including their accessories (pumps, valves), supports, painting and insulation

• piping of GRP (Glass Reinforced Pipes), including the in-situ construction of accesso-ries and special fittings and installation of GRP tanks

• metallic constructions for industrial plants of any kind

• installation of liquid tanks for refineries and other industries

• installation of industrial equipment, such as towers, vessels, compressors, furnaces, cooling towers, heat exchangers, reactors, stacks, e.t.c.

• commissioning, assistance in operation and maintenance of plants as above

• as Main Contractors, co-ordination and supervision of the construction activities

of subcontractors for earthworks, civil, painting, insulation, electrical and instrumentation works:as detailed in the projects in plants hereinafter described.

Από την ίδρυσή της, η ΑΛΦΑ ΠΙ Α.Ε. έχει ολοκληρώσει επιτυχώς έργα ευρείας κλίμακας σε διυλιστήρια και άλλες βιομη-χανικές εγκαταστάσεις, όπως αναφέρεται στη συνέχεια, που περιλαμβάνουν :

• μηχανολογικές εγκαταστάσεις κλιματισμού / αερισμού, υδραυλικών, αποχετεύσεων αυτοματισμού, καθώς και άλλων συστημάτων

• επισκευή, συντήρηση, βαθμονόμηση και παρακολούθηση λειτουργίας όλων των τύπων βανών, ασφαλιστικών και άλλων οργάνων

• βιομηχανικά δίκτυα σωληνώσεων μεταλλικών (ανθρακούχου χάλυβος, ανοξείδωτου, χρωμιο- μαγγανιούχου κλπ.) ή πλαστικών με τα εξαρτήματα τους (βάνες, αντλίες κλπ.) και τις σιδηροκατασκευές στήριξης τους, ως και τις βαφές και μονώσεις

• δίκτυα σωληνώσεων εκ GRP (Glass Reinforced Pipes) με την επί τόπου κατασκευή εξαρτημάτων και ειδικών τεμαχίων ως και εγκαταστάσεις δεξαμενών εκ GRP

• μεταλλικές κατασκευές πάσης φύσεως για βιομηχανικές εγκαταστάσεις, περιλαμβανομένης και ανέγερσης εργασιών των εγκαταστάσεων δεξαμενών πετρελαίου (σταθεράς ή πλωτής οροφής) σε Διυλιστήρια και αλλού

• εγκατάσταση βιομηχανικού εξοπλισμού, όπως πύργων, δοχείων, εναλλακτών, αεροψυκτών, φούρνων, αντλιών, ψυκτικών πύργων, συμπιεστών κ.λ.π.

• τεχνική υποστήριξη, εκπαίδευση προσωπικού, θέση σε λειτουργία, συντήρηση και παρακολούθηση παραγωγής των ανωτέρω εγκαταστάσεων

• ως Κυρίως ΕΡΓΟΛΑΒΟΙ, συντονισμό και επίβλεψη κατασκευαστικών δραστηριοτήτων των υπεργολαβιών χωματουργικών, σκυροδεμάτων, ηλεκτρολογικών, οργάνων κ.α.

και αναλυτικότερα σε έργα των συγκροτημάτων ως έπεται:

Εμπειρία της Άλφα Πι ΑΤΕ

Page 7: Εταιρική Παρουσίαση - ALFA PI4 5. Άλφα Πι Εταιρική Παρουσίαση Alfa Pi Company Profile. ALFA PI S.A. is a Construction and Engineering Company,

12 13

ALFA PI S.A., during its continuous presence, since its establishment in 1991 in Petrol Re-fineries such as of HELPE in Aspropyrgos, Elefsis & Thessaloniki, MOTOR OIL and OCTA in Skopje, has completed installation works of considerable size, including the following :

Contract No 1. HELLENIC PETROLEUM S.A. /ASPROPYRGOS INDUSTRIAL COMPLEX(ex H.A.R) 1.1 Sundry mechanical installation works, B’ semester 1991 992 1.2 Flare line for towers in units U-2100 & U-100 10011.3 Sundry Mechanical Works, A’ Semester 1992 10401.4 Return LPG line from Jetty and reconstruction of Diesel supply lines 1054 to JETOIL, DRACOIL, SOSCO & HELLINOIL 1.5 Sundry Mechanical Works in modifications & improvements 10781.6 Installation of new vessels 0-3709, 0-2401, 0-5407 11361.7 Sundry Mechanical Works, B’ Semester 1993 11371.8 interconnection pipeworks for Diesel tankage in 1139 Megara Tank Farm1.9 Sundry Mechanical Works in modifications & improvements 11631.10 Sundry steel constructions (unit price contract) in H.A.R 11971.11 Reconstruction & improvements of fire fighting 1235 installations for tanks P8738, P8702Α, P8701I, P8701D 1.12 Replacement of eroded parts in 95 lines during the Shut- Down of the Units 12361.13 Sundry Mechanical Works, A’ Semester 1995 12511.14 NEW HYDRODESULPHURIZATION UNIT U-3400 AND SULPHUR RECOVERY UNIT U-2750 as subcontractor of TECHNIPETROL SpA Additional pipework 4’’ & 6’’ in U-3400 1.15 INTERCONNECTION BETWEEN FLARE GAS RECOVERY AF/ 14-2023 UNIT Z-5411 AND OTHER UNITS • Subgrade improvement and foundation slab of the unit• Erection and connection of FGRU Z-5411• Pipeworks, including accessories• Steel construction for pipe supports and for FGRU shed• Electrical works and Instrument installation1.16 INTERCONNECTION OF COMPRESSOR V-3201B AF/ 14-2010• Dismantling of old compressor and shed • Foundation slab• Installation and connection of new Compressor • Pipeworks with accessories and supports• Electrical works & Instrument installation1.17 LEVEL GAUGES IN MEGARA TANK FARM as subcontractor of ADP–ENRAF Modification in Gauge Nozzles and Stilling wells of 14 Tanks to receive new Radar Level Gauges. 1.18 TIP EXPANSION OF NAPTHA ISOMERIZATION UNIT U-4600 as subcontractor of J&P-AVAX S.A. (former ZEUS S.A.): • Erection of new Equipment (total weight 220tons), comprising :- 10 Vessels (Absorbers, fuel fitters)- 8 Heat Exchangers- 2 Aircoolers, including their assembly, supporting steel construction-

Η ΑΛΦΑ ΠΙ Α.Ε., με συνεχή παρουσία της από της ιδρύσεως της, σε εγκαταστάσεις Διυλιστηρίων όπως του Ασπροπύργου, Ελευσίνας, Θεσσαλονίκης, Motor Oil και OCTA Σκοπίων ολοκλήρωσε σημαντικά έργα σε σωληνουργικές εργασίες, σιδη-ροκατασκευές και εγκατάσταση εξοπλισμού, περιλαμβανομένων των ακολούθων :

Συμβάσεις Αρ.1. ΕΛΛΗΝΙΚΑ ΠΕΤΡΕΛΑΙΑ Α.Ε. / ΒΙΟΜΗΧΑΝΙΚΕΣ ΕΓΚΑΤΑΣΤΑΣΕΙΣ ΑΣΠΡΟΠΥΡΓΟΥ (πρώην ΕΛΔΑ) 1.1 Σποραδικά μηχανολογικά Έργα Β’ εξαμήνου 1991 9921.2 Πύργοι καύσεως αερίου μονάδων U-2100 & U-100, 10011.3 Σποραδικά μηχανολογικά Έργα Α΄ εξαμήνου 1992 10401.4 Επιστροφή γραμμής LPG από την προβλήτα και επανακατασκευή του δικτύου παροχής Diesel προς JETOIL, DRACOIL, SOSCO και HELLINOIL, 10541.5 Διάφορα μηχανολογικά Έργα μετατροπών και βελτιώσεων στα ΕΛΔΑ 1.6 Εγκατάσταση νέων δοχείων 0-3709, 0-2401,0-5407, 11361.7 Σποραδικά μηχανολογικά Έργα Β΄ εξαμήνου 19931.8 Έργα συνδέσεως δεξαμενών αποθήκευσης diesel στις εγκαταστάσεις Μεγάρων, 11391.9 Σποραδικά μηχανολογικά Έργα μετατροπών και βελτιώσεων στα ΕΛΔΑ1.10 Σιδηροκατακευές με τιμές μονάδας στα ΕΛΔΑ 1.11 Ανακατασκευή και βελτίωση του συστήματος πυρόσβεσης, ως και των σωληνώσεων στις δεξαμενές Ρ-8738, Ρ-8702Α, Ρ8701Ι και Ρ8701D, 1235 1.12 Αντικατάσταση 95 γραμμών για το SHUT-DOWN των μονάδων 12361.13 Σποραδικά μηχανολογικά Έργα Α΄ εξαμήνου 1995 12511.14 ΝΕΕΣ ΜΟΝΑΔΕΣ ΑΠΟΘΕΙΩΣΗΣ U-3400/KAI ΑΝΑΚΤΗΣΗΣ ΘΕΙΟΥ U-2750 ως υπεργολάβοι TECHNIPETROL SpA Πρόσθετες σωληνογραμμές 4’’ & 6’’ στην U-34001.15 ΜΟΝΑΔΑ ΑΝΑΚΤΗΣΗΣ ΑΕΡΙΩΝ ΠΥΡΣΟΥ Ζ-5411 ΚΑΙ ΔΙΑΣΥΝΔΕΣΗ ΜΕ ΜΟΝΑΔΕΣ ΣΤΑ ΕΛΔΑ AF 14-2023• Βελτίωση υπεδάφους και πλάκα θεμελίωσης της μονάδος• Ανέγερση και σύνδεση μονάδας FGRU Ζ-5411• Σωληνώσεις μετά των εξαρτημάτων• Σιδηροκατασκευές στηριγμάτων σωληνώσεων και για το στέγαστρο της μονάδας• Ηλεκτρολογικά και εγκατάσταση οργάνων1.15 ΔΙΑΣΥΝΔΕΣΗ ΣΥΜΠΙΕΣΤΟΥ V-3201B AF 14-2010• Αποξήλωση των εγκαταστάσεων του παλαιού συμπιεστού και του στεγάστρου του• Θεμελίωση βάσης εκ σκυροδέματος • Τοποθέτηση και σύνδεση νέου συμπιεστού V-3201B.• Σωληνώσεις μετά των εξαρτημάτων και στηριγμάτων• Ηλεκτρολογικά και εγκατάσταση οργάνων1.17 ΜΕΤΡΗΤΕΣ ΣΤΑΘΜΗΣ ΔΕΞΑΜΕΝΩΝ ΜΕΓΑΡΩΝ ως υπεργολάβοι των ADP-ENRAF Διαμόρφωση στομίων και φρεάτων ηρεμίας σε 14 δεξαμενές του Συγκροτήματος Δεξαμενών Μεγάρων για την υποδοχή Μετρητών Στάθμης με Ραντάρ.1.18 ΕΠΕΚΤΑΣΗ ΜΟΝΑΔΟΣ ΙΣΟΜΕΡΙΣΜΟΥ ΝΑΦΘΑΣ U-4600 (TIP EXPANSION) ως υπεργολάβοι της J&P ΑΒΑΞ Α.Ε (πρώην ΖΕΥΣ ΑΤΕ) AF 14-2100/20• Ανέγερση του νέου Εξοπλισμού ολικού βάρους (κενού) 220t. που περιλαμβάνει :- 10 Δοχεία (Absorbers, fuel fitters)- 8 Εναλλάκτες Θερμότητας- 2 Αεροψύκτες, μετά της συναρμολόγησης αυτών ως και της φέρουσας σιδηροκατασκευή των-

Page 8: Εταιρική Παρουσίαση - ALFA PI4 5. Άλφα Πι Εταιρική Παρουσίαση Alfa Pi Company Profile. ALFA PI S.A. is a Construction and Engineering Company,

14 15

8 new pumps • Assembly and installation of a new Compressor • Modifications on existing installation for the following :- Compressor- Pumps- Feeder to furnace- Reactor- Aircoolers• Prefabrication, Installation, Painting and Testing of the pipeworks of the unit and its interconnections, totalling to 285tons (out of which 45tons of alloy and stainless steel) with their accessories and supports.• Insulation of Equipment and Pipeworks• Pressure tests and technical assistance for Commissioning and Turn Around procedures.1.19 CHLORINE ABSORBERS O-3340A/B IN U-3300 as subcontractor of J&P-AVAX S.A. (former ZEUS S.A.):• Erection of 2 new absorbers• Installation of pipeworks for these absorbers and relative modification on the network of the unit.1.20 MOV’s & PRV’s IN PRODUCT LINES FOR THE NEW ASPROPYRGOS JETTY. as subcontractor of T.C.B. Ltd.• Pipeworks • Valve installations1.21 CRUDE AND VACUUM DISTILLATION UNIT U-2000. as subcontractor of HYUNDAI ENGINEERING: In this project ALFA PI undertook various steel constructions and piping works 1.22 STEAMTRAPS IN H.A.R. Checking and replacement of steam traps (2600 ea), required for the improvement of the steam and condensate circuits in all units of the Refinery, including the ela-boration of the electronic Registration of all steam taps . 1.23 MAINTENANCE OF HEAT EXCHANGERS DURING THE SEPTEMBER 1999 SHUT DOWN The work comprises the extraction, cleaning by water jet and repositioning of all coils units of 247 heat exchangers and 100 air coolers in all units of the Refinery, totaling to 143.000 tubes. Works are executed during the two-month Shut Down, following the strict shut down time schedule of the various units, as required by the production requirements of the Refinery.1.24 MAINTENANCE WORKS FOR FURNACE L-2101 (A&B BOX) The work comprises the dismantling of coils to be replaced, the prefabrication and installation of the new coils and supports, hydraulic testing and reinstatement of the circuits and the fireproof cladding of both boxes of the furnace.1.25 REPLACEMENT OF SUPERHEATER COIL IN FURNACES L-3702A/B The work comprises the dismantling of the coils to be replaced, the prefabrication and installation of the new coils with their supports, the flushing and testing of the circuits in both furnaces.1.26 INSTALLATION OF BUSTER PUMP IN PUMP-OUT BASIN OF U-1900 The necessary pipework and mechanical /electrical installation works, required for the evacuation of pit P-19981.27 CHANGE OF KERO TANKAGE AF 14 2057 Modifications of Pipeline to increase its capacity in order to meet the increased

8 Αντλίες- Συναρμολόγηση και εγκατάσταση νέου Συμπιεστού• Μετατροπές σε υπάρχοντα εξοπλισμό στην μονάδα, όπως στα κάτωθι :- Συμπιεστή - Αντλίες- Τροφοδοτικό φούρνου- Αντιδραστήρα- Αερόψυκτα• Προκατασκευή, Εγκατάσταση και Βαφή των νέων σωληνογραμμών της μονάδας και τις διασυνδέσεις της, συνολικά 285 τόνων, (εκ των οποίων 45 τόνοι χρωμιούχου και ανοξείδωτου χάλυβα) μετά των εξαρτημάτων και στηριγμάτων των.• Μόνωση Εξοπλισμού και σωληνογραμμών • Δοκιμές Πίεσης και παροχή υπηρεσιών στις διαδικασίες Commissioning και Turn Around της μονάδας.1.19 ΑΠΟΧΛΩΡΙΩΤΕΣ Ο-3340Α/Β ΤΗΣ U-3300 ως υπεργολάβοι της J&P ΑΒΑΞ Α.Ε. (πρώην ΖΕΥΣ ΑΤΕ) • Εγκατάσταση 2 νέων αποχλωριωτών• Σωληνουργικές εργασίες για την σύνδεση των αποχλωριωτών ως και τις αντίστοιχες μετατροπές του δικτύου της μονάδος.1.20 ΕΓΚΑΤΑΣΤΑΣΗ ΗΛΕΚΤΡΟΚΙΝΗΤΩΝ ΒΑΝΩΝ ΚΑΙ ΑΣΦΑΛΙΣΤΙΚΩΝ ΣΤΗ ΓΡΑΜΜΗ ΠΡΟΪΟΝΤΟΣ ΣΤΟ ΝΕΟ ΠΡΟΒΛΗΤΑ ΑΣΠΡΟΠΥΡΓΟΥ ως υπεργολάβοι T.C.B. ΕΠΕ• Εγκατάσταση σωληνώσεων• Εγκατάσταση βανών & ασφαλιστικών 1.21 ΝΕΑ ΜΟΝΑΔΑ ΔΙΫΛΙΣΗΣ CRUDE & VACUUM U-2000 ως υπεργολάβοι της HYUNDAI ENGINEERING Η ΑΛΦΑ ΠΙ ανέλαβε διάφορες εργασίες σιδηροκατασκευών και σωληνώσεων1.22 ΑΤΜΟΠΑΓΙΔΕΣ ΕΛ.ΔΑ. Έλεγχος και αντικατάσταση ατμοπαγίδων(2600 τεμ) προς βελτίωση της λειτουργίας των κυκλωμάτων ατμού και συμπυκνωμάτων σε όλες τις μονάδες στο Διυλιστήριο. Περιλαμβάνεται η ηλεκτρονική καταγραφή των εγκατεστημένων ατμοπαγίδων ανά μονάδα.1.23 ΣΥΝΤΗΡΗΣΗ ΕΝΑΛΛΑΚΤΩΝ ΘΕΡΜΟΤΗΤΑΣ ΚΑΤΑ ΤΟ ΓΕΝΙΚΟ SHUT DOWN ΣΕΠΤΕΜΒΡΙΟΥ 1999 Η εργασία περιλαμβάνει την εξάρμωση, εξόλκυση και καθαρισμό με υδροβολή και άρμωση όλων των αυλοφόρων δεσμών, εναλλακτών θερμότητας και αεροψύκτων σε όλες τις μονάδες του Διυλιστηρίου. Συντηρούνται 247 εναλλάκτες και 100 αερόψυκτα (συνολικά 143.000 αυλοί) στο διάστημα του διμήνου Shut Down και σύμφωνα με το αυστηρό χρονοδιάγραμμα της συντηρήσεως εκάστης μονάδος. 1.24 ΕΡΓΑΣΙΕΣ ΣΥΝΤΗΡΗΣΗΣ ΣΤΟ ΦΟΥΡΝΟ L-2101 (A & B BOX) Η εργασία περιλαμβάνει την κοπή των προς αντικατάσταση αυλών μετά των στηριγμάτων τους, την προκατασκευή και εγκατάσταση των αυλών με τα νέα στηρίγματα, υδραυλική δοκιμή και αποκατάσταση κυκλωμάτων και πυροδομής στα δύο τμήματα του φούρνου.1.25 ΑΝΤΙΚΑΤΑΣΤΑΣΗ ΤΩΝ SUPERHEATER COILS ΣΤΟΥΣ ΦΟΥΡΝΟΥΣ L-3702 A/B Η εργασία περιλαμβάνει την εξάρμωση των προς αντικατάσταση αυλών, προκατασκευή των νέων μετά των στηριγμάτων τους, εγκατάσταση, απόπλυση και δοκιμή των σωληνώσεων στους δύο φούρνους.1.26 ΕΓΚΑΤΑΣΤΑΣΗΣ ΤΖΙΦΑΡΙΟΥ ΣΤΗ ΛΕΚΑΝΗ ΑΣΦΑΛΕΙΑΣ U-1900 Περιλαμβάνονται και οι μηχανολογικές και ηλεκτρολογικές εγκαταστάσεις για την λειτουργία εκκένωσης του φρεατίου Ρ-19981.27 ΜΕΤΑΤΡΟΠΕΣ ΣΤΟ ΣΥΣΤΗΜΑ ΔΕΞΑΜΕΝΙΣΜΟΥ ΚΗΡΟΖΙΝΗΣ AF-142057 Μετατροπές σωληνογραμμών του ως άνω συστήματος για την αύξηση της χωρητικότητας

Page 9: Εταιρική Παρουσίαση - ALFA PI4 5. Άλφα Πι Εταιρική Παρουσίαση Alfa Pi Company Profile. ALFA PI S.A. is a Construction and Engineering Company,

16 17

re-quirements in fueling of ‘’El. Venizelos’’ new Airport, including: • Installation of 3.000 m Φ8» C.S lines, • Additional pumps in pumping station, • Modifications of pigging facilities,• Modification in connections to existing fuel tanks.• Required Civil, Electrical and Instrumentation works 1.28 INSTALLATION OF SUPPORTING STRUCTURE FOR LEVEL GAUGING IN TANKS The installation applies for 33 tanks (19 for white and 14 for black products) in Aspropyrgos Tank Farm. Work comprises:• Thorough cleaning of each tank and Gas-Free certification.• Prefabrication and installation of steel construction to support the new level gauge (radar) and thermometer.• Prefabrication and installation of the relative stilling wells Φ8» and 6» in the tanks.1.29 LABOUR FOR MAINTENANCE WORKS DURING 2004 ALFA PI undertook the supply of labour for technical personnel of various speciali-zation (fitters, mechanics, electricians, airconditioning and instrument technicians) for the execution of maintenance works by the Employer for the year 2004. The average number of technicians occupied daily was 70, while during the October Shut Down period, same was raised to 380 technicians.1.30 LABOUR FOR ANCILLARY CLEANING & TRANSPORTION WORKS DURING 2004 ALFA PI undertook the supply of labour for cleaning and transportations, according the daily needs in the refinery for the year of 2004. The average number of this labour force was 24 persons daily.1.31 REVAMPING OF DIESEL DESULPHURIZATION UNIT U-3400• Installation of New Equipment:- Reactor K-3402 (25m high, 152t empty, Internals & catalyst weight = 193t)- 4 Heat Exchanger- 2 Vessels- Filtration System Z-3410 A/B/C- 4 Pumps• Modification and upgrading of existing equipment during the Shut Down of October 2004, including the following- Reactor K-3401- 5 Heat Exchangers & 4 Air Collers- Tower N-3402- 5 Vessels- 4 Compressors • Prefabrication, installation, N.D.T. testing and painting for the extension of existing, as well as the new pipeworks, of various steel quality (CS, SS, alloy)• Insulation works for pipework and equipment • Civil works Earthworks and Concreting for: - Foundation of the new equipment and the steel structures - Extension of drainage system of the unit- Extension and reinstatement of the paving of the unit • Steel Construction for the following:- New Piperack in the unit- Circular platforms, staircases and railing around the new reactor-

λόγω των αυξημένων απαιτήσεων τροφοδοσίας του νέου Αεροδρομίου ΕΛ.ΒΕΝΙΖΕΛΟΣ, Περιλαμβάνονται:• η εγκατάσταση γραμμών χαλυβδοσωλήνων Φ8», 3000 μήκους, • πρόσθετες αντλίες στο αντλιοστάσιο• μετατροπές στο σύστημα εσωτερικού καθαρισμού των σωλήνων, • μετατροπές στις συνδέσεις με τις υπάρχουσες δεξαμενές • τα απαιτούμενα έργα πολιτικού μηχανικού, ηλεκτρολογικών και εγκαταστάσεως οργάνων.1.28 ΕΓΚΑΤΑΣΤΑΣΗ ΑΝΑΜΟΝΩΝ ΜΕΤΡΗΤΩΝ ΣΤΑΘΜΗΣ ΔΕΞΑΜΕΝΩΝ Η εγκατάσταση των αναμονών γίνεται σε 33 δεξαμενές (19 λευκών και 14 μαύρων προϊόντων) των δεξαμενών του συγκροτήματος Ασπροπύργου. Η εργασία περιλαμβάνει:• Πλήρη καθαρισμό κάθε δεξαμενής και πιστοποίηση Gas Free.• Προκατασκευή και εγκατάσταση φέρουσας κατασκευής των μετρητών στάθμης (radar) και θερμομέτρου.• Προκατασκευή και εγκατάσταση των αντίστοιχων φρεάτων ηρεμίας Φ8’’ & Φ6’’εντός των δεξαμενών.1.29 ΕΚΤΕΛΕΣΗ ΕΡΓΑΣΙΩΝ ΣΥΝΤΗΡΗΣΗΣ ΚΑΤΑ ΤΟ ΕΤΟΣ 2004 Η ΑΛΦΑ ΠΙ ανέλαβε την παροχή τεχνικού προσωπικού διαφόρων ειδικοτήτων (μονταδόρων, μηχανουργών, ηλεκτροτεχνιτών, ψυκτικών και τεχνιτών οργάνων) για την εκτέλεση εργασιών συντήρησης από τον Εργοδότη κατά το έτος 2004. Ο μέσος αριθμός των τεχνιτών που απασχολούνται ανέρχεται σε 70 ημερησίως, κατά δε το Shut Down Οκτωβρίου, σε 380.1.30 ΕΚΤΕΛΕΣΗ ΒΟΗΘΗΤΙΚΩΝ ΕΡΓΑΣΙΩΝ ΚΑΘΑΡΙΣΜΟΥ ΚΑΙ ΜΕΤΑΦΟΡΩΝ Η ΑΛΦΑ ΠΙ ανέλαβε την παροχή προσωπικού σε βοηθητικές εργασίες, καθαρισμό και μεταφορές για τις καθημερινές ανάγκες του Εργοδότου κατά το έτος 2004, με μέσο αριθμό απασχολούμενων 24 άτομα ημερησίως.1.31 ΑΝΑΒΑΘΜΙΣΗ ΜΟΝΑΔΟΣ ΑΠΟΘΕΙΩΣΗΣ DIESEL U-3400 AF 14 2078• Εγκατάσταση νέου εξοπλισμού ήτοι :- Αντιδραστήρας Κ-3402: ύψος 25m, βάρος πύργου κενού 152t, βάρος εσωτερικών σχαρών και καταλήτου 193t- 4 εναλλάκτες- 2 δοχεία - Συγκρότημα του φιλτραρίσματος Ζ-3410 Α/Β/C- 4 αντλίες• Μετατροπές και βελτιώσεις υπάρχοντος εξοπλισμού κατά την γενική κράτηση Οκτωβρίου 2004: περιλαμβάνονται τα κάτωθι:- Αντιδραστήρας Κ-3401- 5 Εναλλάκτες και 4 Αερόψυκτα- Πύργος Ν-3402 - 5 Δοχεία- 4 Συμπιεστές • Προκατασκευή, εγκατάσταση, δοκιμασίαNDT και βαφή για επέκταση των υπαρχόντων σωληνώσεων, ως και για τις νέες σωληνώσεις, διαφόρων ποιοτήτων χάλυβος (ανθρακούχου, χρωμιούχου και ανοξείδωτου) • Μόνωση εξοπλισμού και σωληνώσεων• Εργασίες Πολιτικού Μηχανικού: Χωματουργικά και σκυροδέματα για:- θεμελίωση του ως άνω εξοπλισμού και των σιδηροκατασκευών - επέκταση του συστήματος αποχέτευσης της μονάδος- επέκταση και αποκατάσταση του δαπέδου της μονάδας,• Σιδηρές κατασκευές των κάτωθι :- Νέου σωληνοδιαδρόμου της μονάδος - Πλατφόρμων, κλιμάκων και κιγκλιδωμάτων των εξωτερικών παταριών νέου αντιδραστήρα-

Page 10: Εταιρική Παρουσίαση - ALFA PI4 5. Άλφα Πι Εταιρική Παρουσίαση Alfa Pi Company Profile. ALFA PI S.A. is a Construction and Engineering Company,

18 19

4 new platforms for the elevated equipment- Pipe supports, as required• Electrical works for power, control, lighting and telecoms• Installation of instruments and automation system • Pressure tests and technical assistance for the Turn Around Precommissioning and Commissioning Procedures 1.32 MAINTENANCE OF U-3400 EQUIPMENT DURING THE OCTOBER 2004 SHUT DOWN. Shut Down Maintenance of existing equipment in the unit, further to those in 1.31, including: - 7 Heat Exchanger - 4 Aircollers - 3 Towers - Furnace L-34011.33 REPLACEMENT OF ERODED TOWER PLATFORMS Dismantling and replacement of the eroded floor grid in the tower platforms of Units U-2100, U-2200, U-2600 and U-2800.1.34 LABOUR FOR ANCILLARY CLEANING & TRANSPORTΙΟΝ WORKS DURING 2005 ALFA PI undertook the supply of labour for cleaning and transportation works ac-cording the daily needs of the Employer in the refinery for the year of 2005 too.1.35 MAINTENANCE WORKS IN FURNACES L-3301/2/3/4/1N/2N. During the Shut Down of March 2007.• Temporary Scaffolding for the inspection of all Radiant Zone coils in all furnaces.• Replacement of 30 segments of eroded Radiant Zone coil, including all neces-sary cuts, welding, PHWT and NDT tests • Piping works required for the independent function of furnace boxes L-3301N &2N1.36 NEW LINE SRAR MS 8’’ Piping works for Φ8’’ C.S pipe with thermal insulation, 650m long, from Pum-phouse of J-8805/S till Laboratory Building at the northern side of the Refinery 1.37 REARRANGEMENT OF NETWORKS FOR TANK P-8759B Installation of 1’’ to 24’’ line (160m long), with its steam tracing and insulation, in-cluding all necessary Civil Works for the supports and the underground routing.1.38 FIREFIGHTING MONITOR INSTALLATION IN UNITS U-4900, U-2000, U-3300, U-2600/2500, U-9200, including :• fabrication and erection of 4 monitor towers (20m high 2ea, 10m &3m)• Piping works, UG & AG, Φ6’’/8’’ 300m long • Required civil and electrical works 1.39 REPLACEMENT OF AIR PREHEATER M-2030 AND STEAM /AIR PREHEATER M-2031 IN UNIT U-2000 During the Shut Down in September 2009 Including the extraction and reinstallation of obstructing ductwork, as required 1.40 MAINTENANCE WORKS OF AIR COOLERS IN UNITS U-2000/ 2100/ 2200/ 2400/ 2600/ 3100/ 3200/ 3300/ 3400/ 3500/ 3800/ 3900/ 4000/ 4600/5400 During The Shut Down in September 2009 103 Air Coolers were inspected and maintained.1.41 MAINTENANCE WORKS OF HEAT EXCHANGERS M-3401 A/B/C. During the Shut Down in September 20091.42 DEMOLITION AND ERECTION WORKS FOR TIE-INS IN OLD THERMAL BUILDING AREA. During the Shut Down in September 2009

4 παταριών για τον ανυψωμένο εξοπλισμό- Στηριγμάτων των σωληνώσεων όπου απαιτούνται• Ηλεκτρολογικές εργασίες κίνησης, ελέγχου, φωτισμού και τηλεπικοινωνιών, που απαιτούνται από την επέκταση• Εγκατάσταση οργάνων ελέγχου και αυτοματισμού της εγκατάστασης • Δοκιμές πίεσης εξοπλισμού και σωληνώσεων και παροχή υπηρεσιών της Διαδικασίες Precommissioning και Commissioning του Turn Around της Μονάδος1.32 ΣΥΝΤΗΡΗΣΗ ΤΟΥ ΕΞΟΠΛΙΣΜΟΥ ΤΗΣ ΜΟΝΑΔΑΣ U-3400 ΚΑΤΑ ΤΗΝ ΚΡΑΤΗΣΗ ΟΚΤΩΒΡΙΟΥ 2004 Συντήρηση του υπολοίπου εξοπλισμού της μονάδας πέραν των εις 1.31 Περιλαμβάνονται: - 7 Εναλλάκτες - 4 Αερόψυκτα- 3 Πύργοι- Φούρνος L-34011.33 ΑΝΤΙΚΑΤΑΣΤΑΣΗ ΕΣΧΑΡΩΝ ΠΑΤΑΡΙΩΝ ΠΥΡΓΩΝ Αποξήλωση φθαρμένων εσχαρών και αντικατάσταση με νέες στους Πύργους των μονάδων U-2100, U-2200, U-2600 και U-28001.34 ΕΚΤΕΛΕΣΗ ΕΡΓΑΣΙΩΝ ΣΥΝΤΗΡΗΣΗΣ, (ΔΙΑΘΕΣΗ ΕΡΓΑΤΩΝ) Η ΑΛΦΑ ΠΙ ανέλαβε την παροχή προσωπικού σε βοηθητικές εργασίες, καθαρισμό και μεταφορές για τις καθημερινές ανάγκες του Εργοδότου και κατά το έτος 2005.1.35 ΕΡΓΑΣΙΕΣ ΣΥΝΤΗΡΗΣΗΣ ΣΤΟΥΣ ΦΟΥΡΝΟΥΣ L-3301/2/3/4/1N/2N Κατά το Shut Sown Μαρτίου 2007• Ανέγερση / καθαίρεση ικριωμάτων για την επιθεώρηση των αυλών της RADIAN ZONE των φούρνων.• Αντικατάσταση 30 τμημάτων των αυλών του RADIANT ZONE, με τις απαιτούμενες κοπές, ηλεκτροσυγκολλήσεις, ανοπτήσεις και μη καταστρεπτικούς ελέγχους.• Σωληνουργικές εργασίες για την ανεξαρτητοποίηση των κλιβάνων L-3301Ν & 2Ν1.36 ΝΕΑ ΓΡΑΜΜΗ SRAR ΜS 8’’ Εγκατάσταση χαλυβοσωλήνος Φ8’’ με θερμική μόνωση, μήκους 650m από το αντλιοστάσιο των J-8805/S, έως το Χημείο στην βόρεια πλευρά του Διυλιστηρίου.1.37 ΑΠΟΚΑΤΑΣΤΑΣΗ ΔΙΚΤΥΩΝ ΔΕΞΑΜΕΝΗΣ Ρ-8759Β Εγκατάσταση αγωγών 24’’ - 10’’ (160m) με συνοδεία ατμού και μόνωση, ως και τις απαιτούμενες Οικοδομικές Εργασίες για τα στηρίγματα και τις υπόγειες διελεύσεις.1.38 ΕΓΚΑΤΑΣΤΑΣΗ ΚΑΝΟΝΙΩΝ ΠΥΡΟΣΒΕΣΗΣ (MONITORS) ΣΤΙΣ ΜΟΝΑΔΕΣ U-4900, U-2000, U-3300, U-2600/2500, U-9200 Περιλαμβάνονται:• κατασκευή /ανέγερση 4 πύργων κανονιών, ύψους 20m(τεμ 2), 10m & 3m • Υπόγειες & υπέργειες σωληνώσεις Φ6’’ /8’’, 300m μήκους • Απαιτούμενες εργασίες πολιτικού μηχανικού και ηλεκτρολογικών1.39 ΑΝΤΙΚΑΤΑΣΤΑΣΗ ΣΤΑΤΙΚΟΥ ΠΡΟΘΕΡΜΑΝΤΗΡΑ ΑΕΡΑ Μ-2030 & ΠΡΟΘΕΡΜΑΝΤΗΡΑ ΑΕΡΑ/ΑΤΜΟΥ Μ-2031 ΤΗΣ ΜΟΝΑΔΑΣ U-2000 Κατά το Shut Down του Σεπτεμβρίου 2009 Περιλαμβάνεται η απαιτούμενη στήριξη, προσωρινή αποξήλωση και επανατοποθέτηση υπαρχόντων αεραγωγών και ανεμιστήρων.1.40 ΕΡΓΑΣΙΕΣ ΣΥΝΤΗΡΗΣΗΣ ΤΩΝ ΑΕΡΟΨΥΚΤΩΝ ΤΩΝ ΜΟΝΑΔΩΝ U-2000 /2100 / 2200/ 2400/ 2600/ 3100/ 3200/ 3300/ 3400/ 3500/ 3800/ 3900/ 4000/ 4600/5400 Κατά το Shut Down του Σεπτεμβρίου 2009 Επιθεωρήθηκαν και συντηρήθηκαν και 103 αερόψυκτα1.41 ΕΡΓΑΣΙΕΣ ΣΥΝΤΗΡΗΣΗΣ ΕΝΑΛΛΑΚΤΩΝ Μ-3401/Α/Β/C Κατά το Shut Down του Σεπτεμβρίου 20091.42 ΕΡΓΑΣΙΕΣ ΑΠΟΞΗΛΩΣΗΣ ΚΑΙ ΕΚΤΕΛΕΣΗΣ TIE-INS ΣΤΗΝ ΠΕΡΙΟΧΗ ΠΑΛΑΙΟΥ ΘΕΡΜΙΚΟΥ ΚΤΗΡΙΟΥ Κατά το Shut Down του Σεπτεμβρίου 2009

Page 11: Εταιρική Παρουσίαση - ALFA PI4 5. Άλφα Πι Εταιρική Παρουσίαση Alfa Pi Company Profile. ALFA PI S.A. is a Construction and Engineering Company,

20 21

1.43 SUNDRY PIPEWORKS IN UNITS U-2100/U-5400 & U-3500 Replacement /Modifications on lines to N-2101, P-5403, P-5401 and CS5 in U-35001.44 MECHANICAL WORKS FOR TANKS IN ASPROPYRGOS AND MEGARA (PROGRAMME 2010-2011) 1016822. HELLENIC PETROLEUM S.A. / THESSALONIKI INDUSTRIAL COMPLEX (ex EKO)2.1 LEVEL GAUGES IN KALOHORI TANK FARM as subcontractors of ADP–ENRAF: Modifications in gauge nozzle and stilling wells on 29 Tanks, to receive new Radar Level Gauges. 2.2 ERECTION WORKS FOR ISOMERIZATION HAZOP STUDY, 2nd STAGE Modifications to the Isomerization Unit necessary for the implementation of HA-ZOP Study Project 2nd Stage, during the October 2000 Turn Around of the Thessa-loniki Refinery, including pipeworks, steel construction instrument installation and electrical works.3. HELLENIC PETROLEUM S,A / NEW POWER CCPP PLANT IN THESSALONIKI3.1 SEA WATER INTAKE AND OUTFALL LINES as subcontractors of AGET/ENET: Installation and hydraulic test of the underground pipeline GRP Φ600 mm of total length of 2.400m.4 HELLENIC PETROLEUM S,A / ELEFSIS INDUSTRIAL COMPLEX (ex PETROLA) JOB 4.1 Pipe and Μechanical Works for the Shut Down of HDS unit E-16010 in April ’96, 4.2 Sundry Mechanical Works, Annual Contract for 1996, E-15748A extended for 1997 too 4.3 Pipeworks on the Bridge over the old National Road E-16977 Athens - Corinth 4.4 Pipeworks in Pahi Installations, S-14334.5 Various Pipeworks in the Refinery S-1299 4.6 Pipeworks for connection with H.A.R, S-35944.7 Modification/Improvement / Repair works in Mechanical Installations, S-3645 Pipeworks and Metallic constructions Annual Contract (B96- A97- B97) 4.8 Annual contract for technical services to IFESTOS S-6352 HELLAS SHIPYARD, 4.9 Sundry Mechanical and steel erection works in HDS unit S-11812 during 1998 Shut-Down, 4.10 3-year Contract for Maintenance / Repair of Heaters & Boilers, (2002-2005) S-51119 Maintenance of Furnaces 3-H-1 A/B, 3-H-101, 4-H-241, 100-H-1, 200-H-101, their Preheaters and all Boilers of the Refinery, including the following:• Preparation and assistance for inspection works • Cleaning of fire chambers and ducts • Repair or replacement of coil tubes, fireproofing, shell panels and ducting • Adjustment, repair or replacement of burners, fans and soot blowers • Blinding /deblinding and neces• sary pipeworks for the furnace lines4.11 Repair works in Tanks TK- 56, TK-13, TK-14, S-5010 TK-56: Floating deck, D=84m, H=22m ΤΚ-13 & ΤΚ-14: Rigid roof, D=18,2m, H=20,2m 4.12 Pipeworks for the routing of liquid and gas products from boring works in Tank farm

1.43 ΔΙΑΦΟΡΕΣ ΣΩΛΗΝΟΥΡΓΙΚΕΣ ΕΡΓΑΣΙΕΣ ΣΤΙΣ ΜΟΝΑΔΕΣ U-2100/U-5400 KAI U-3500 Αντικατάσταση /μετατροπή γραμμών προς Ν-2101, Ρ-5403. Ρ-5401 και της CS5 της U-35001.44 ΕΛΑΣΜΑΤΟΥΡΓΙΚΕΣ ΚΑΙ ΜΗΧΑΝΟΛΟΓΙΚΕΣ ΕΡΓΑΣΙΕΣ ΔΕΞΑΜΕΝΩΝ ΣΤΟΝ ΑΣΠΡΟΠΥΡΓΟ ΚΑΙ ΣΤΑ ΜΕΓΑΡΑ (ΠΡΟΓΡΑΜΜΑ 2010-2011)2. ΕΛΛΗΝΙΚΑ ΠΕΤΡΕΛΑΙΑ Α.Ε/ ΒΙΟΜΗΧΑΝΙΚΕΣ ΕΓΚΑΤΑΣΤΑΣΕΙΣ ΘΕΣΣΑΛΟΝΙΚΗΣ (πρώην ΕΚΟ)2.1 ΜΕΤΡΗΤΕΣ ΣΤΑΘΜΗΣ ΔΕΞΑΜΕΝΩΝ ΣΤΙΣ ΕΓΚΑΤΑΣΤΑΣΕΙΣ ΚΑΛΟΧΩΡΙΟΥ ως υπεργολάβοι ADP-ENRAF: Διαμόρφωση στομίων και φρεάτων ηρεμίας σε 29 δεξαμενές του συγκροτήματος για την υποδοχή μετρητών στάθμης Radar 2.2 ΕΡΓΑΣΙΕΣ ΓΙΑ ΤΟ ΣΥΣΤΗΜΑ HAZOP ΙΣΟΜΕΡΙΣΜΟΥ, 2η ΦΑΣΗ Της Μετατροπές στη Μονάδα Ισομερισμού που απαιτούνται για την εφαρμογή της του 2ου σταδίου Μελέτης HAZOP, κατά το Turn Around του Οκτωβρίου 2000 Περιλαμβάνονται σωληνουργικές εργασίες, εγκατάσταση οργάνων, ηλεκτρολογικά και σιδηροκατασκευές.3. ΕΛΛΗΝΙΚΑ ΠΕΤΡΕΛΑΙΑ Α.Ε / ΝΕΟ ΕΡΓΟΣΤΑΣΙΟ ΠΑΡΑΓΩΓΗΣ ΗΛ. ΕΝΕΡΓΕΙΑΣ CCPP ΣΤΗΝ ΘΕΣΣΑΛΟΝΙΚΗ3.1 ΣΩΛΗΝΩΣΕΙΣ ΛΗΨΗΣ ΚΑΙ ΕΠΙΣΤΡΟΦΗΣ ΘΑΛΑΣΣΙΟΥ ΥΔΑΤΟΣ ως υπεργολάβοι της ΑΕΓΕΤ / ΕΝΕΤ: Εγκατάσταση και υδραυλική δοκιμή υπογείων σωληνώσεων λήψης και επιστροφής θαλασσίου ύδατος, Φ600χιλ. από GRP, συνολικού μήκους 2.400μ.4. ΕΛΛΗΝΙΚΑ ΠΕΤΡΕΛΑΙΑ Α.Ε/ ΕΡΓΟ ΒΙΟΜΗΧΑΝΙΚΕΣ ΕΓΚΑΤΑΣΤΑΣΕΙΣ ΕΛΕΥΣΙΝΑΣ (πρώην ΠΕΤΡΟΛΑ) 4.1 Σωληνουργικές και Μηχανολογικές Εργασίες της μονάδας Αποθείωσης HDS στο SHUT DOWN (Απρ.’96) Ε-160104.2 Ετήσια Εργολαβία Μηχανολογικών Εργασιών, (1996, επέκταση 1997) Ε-15748Α4.3 Σωληνουργικά γέφυρας πάνω από την Παλαιά Εθνική Οδό Αθηνών - Κορίνθου, Ε-169774.4 Σωληνουργικά στις εγκαταστάσεις Πάχης. S-1433 4.5 Διάφορες Μηχανολογικές Εργασίες του Διυλιστηρίου. S-12994.6 Σωληνουργικά γραμμής σύνδεση με ΕΛΔΑ. S-35944.7 Βελτιώσεις / Μετατροπές / Επισκευή των Μηχανολογικών S-3645 Εγκαταστάσεων, Σωληνώσεων και Μεταλλικών Κατασκευών. ετήσια εργολαβία (Β96-Α97-Β97), 4.8 Ετήσια σύμβαση διάθεσης υπηρεσιών στην ΗΦΑΙΣΤΟΣ ΕΛΛΑΣ ΝΑΥΠΗΓΕΙΑ Α.Ε., 4.9 Σποραδικές Εγκαταστάσεις Σωληνώσεων και Σιδηροκατασκευές S-11812 στη μονάδα HDS κατά τη διάρκεια του SHUT-DOWN του 19984.10 Τριετής Εργολαβία Συντήρησης και Επισκευής Φούρνων S-51119 και Ατμολεβητών (2002-2005). Συντήρηση των φούρνων 3-Η-1Α/Β, 3-Η-101, 4-Η-241, 100-Η-1, 200-Η-101 μετά των προθερμαντήρων τους, ως και των Boilers του συγκροτήματος. Περιλαμβάνονται τα κάτωθι:• Εργασίες για την επιθεώρηση και καθαρισμοί • Επισκευή η αντικατάσταση αυλών, πυροδομών, πανέλων κελύφους και αεραγωγών • Εξάρμωση, άρμωση, ρύθμιση κλπ. καυστήρων, ανεμιστήρων και εκκαπνιστών • Τυφλώματα και περιφερειακές σωληνουργικές εργασίες 4.11 Επισκευαστικές Εργασίες Δεξαμενών ΤΚ-56, ΤΚ-13, ΤΚ-14 S-5010 ΤΚ-56: Πλωτής οροφής, D=84m, H=22m ΤΚ-13 και ΤΚ-14: Σταθερής οροφής D=18,2m, H=20,2m4.12 Σωληνουργικές εργασίες όδευσης υγρών και αερίων από τις γεωτρήσεις της λεκανών

Page 12: Εταιρική Παρουσίαση - ALFA PI4 5. Άλφα Πι Εταιρική Παρουσίαση Alfa Pi Company Profile. ALFA PI S.A. is a Construction and Engineering Company,

22 23

1&2 to the Demister as subcontractors of INTERGEO S.A,4.13 3-year Contract for Maintenance / Repair of Heaters & Boilers (2005-2008) S-008/05 As in 4.10 herein above During the Shut Down of September 2002, major repairs on heaters 3-H-1 A/B, 3-H-1 and 200-H-101 were carried out. Particularly for 3-H-1 A/B , the following were executed: • Replacement of 30 tubes and 20 bends of the Radiant Coil. • Replacement of west side of Convection wall panels with their coil duct bends, and all required casting or gunning of refractory,• Removal and re-installation of the relative platform and soot blowers as re-quired.• Temporary removal, inspection for possible repair and reinstallation, of an ex-tended part of preheater ducts that were obstructing the work as above.• Replacement of 170 tubes in two of the bottom boxes of the preheater. The value of works, executed during this Shut Down, amounts to 1.3800.000€4.14 Design, supply of materials, construction and replacement S-011/06 of Heat Exchanger 200-E-107 in the Preheater of Furnace 200-H-101 • Formation of separation flange on the existing Heat Exchanger during the Oct. 2006 Shut Down.• Construction of a new identical Heat Exchanger, including:− Steel shell with flanges − Heating coil of 66 tubes Φ1 ½’’ alloy steel P22 with 2 Headers Φ6’’− Internal Castable Lining 6’’ thick• Replacement of the old with the new Exchanger during the next Shut Down 4.15 Dismantling of Ex - Owens Central Warehouse 4403006191 It includes the proper dismantling of:• roof, front and side corrigated metal sheet cover, • electrical installations • the metallic frame of the warehouse, (building size 75x173m), • the marking, transportation and proper stocking of the materials to, ready for erection at, a new site on the Refinery.4.16 REPAIR WORKS IN TANKS TK-20 & TK-77 S-003/07 For TK-20 (floating deck D=71.4m, H=20m):• Replacement of 95t steel plates of the floating deck • Total replacement of the primary and secondary seal in the floating deck • Replacement of 70t steel plates of the tank bottom • Total painting of bottom sheets • Replacement of pipeworks in the Tank Basin Area • Replacement of firefighting foam generator line Φ6’’/4’’ For TK-03 (rigid roof D-73.15, H=21.8) – in lieu of TK-77: Total replacement of floating deck 4.17 Dismantling of station D in Bunkering station of the jetty, for requirement of unloading of new Reactors 34-R-005 & 006,• Dismantling of electrical and instrument installation • Disconnection, transportation and temporary positioning of the steel stand of this station • Relevant pipeworks and blinding of networks4.18 Repair works in tank TK-60• Replacement of Annular ring and installation of pad plates on bottom • Replacement of part of Φ20’’ drainage pipe and pad plates on the supports of the Φ30’’ manifold

Δεξαμενών της περιοχής 1&2 στο Demister, ως υπεργολάβοι της INTERGEO A.E.4.13 Τριετής Εργολαβία Συντήρησης και Επισκευής Φούρνων και Ατμολεβητών (2005-2008). S-008/05 Ως εις 4.10 ανωτέρω Κατά το Shut Down του Σεπτεμβρίου 2008 εξετελέσθησαν εκτεταμένες επισκευές στους φούρνους 3-Η-1Α/Β, 3-Η-101, 100-Η-1 και 200-Η-101 Ειδικότερα για τον 3-Η-1 Α/Β, περιλαμβάνονται τα κάτωθι:• Αντικατάσταση 30 αυλών και 20 καμπυλών RADIANT COILS • Αντικατάσταση των πλευρικών πλαισίων της ανατολικής πλευράς του CONVECTION μετά των καμπυλών των αυλών και της πυροδομής των πλαισίων με τις απαιτούμενες αποξηλώσεις και επανατοποθετήσεις παταριών και εκκαπνιστών • Εκτεταμένες αποξήλωσεις για επιθεώρηση, επισκευή όπου απαιτείται και επανατοποθέτηση τμημάτων του προθερμαντήρος, που εμποδίζουν την εξαγωγή των ως άνω αυλών • Αντικατάσταση καμπυλών 4 καυσαερίων προς convection, καθαίρεση και αντικατάσταση πυροδομής αυτών • Αντικατάσταση 170 αυλών των 2 κάτω θαλάμων του προθερμαντήρα Η αξία των εργασιών κατά το Shut Down αυτό ανήλθε σε 1.380.000 € 4.14 Μελέτη, κατασκευή και αντικατάσταση εναλλάκτου 200-Ε-107 στον προθερμαντήρα του φούρνου 200-Η-101 S-011/06 • Προμήθεια υλικών και κατασκευή φλάντζας διαχωρισμού στον υπάρχοντα εναλλάκτη κατά το Shut Down Οκτωβρίου 2006.• Κατασκευή νέου παρομοίου εναλλάκτη. Περιλαμβάνονται:− Σιδηρό κέλυφος με φλάντζες:− Δέσμη 66 αυλών Φ1 ½΄΄ alloy steel Ρ22 και δύο συλλεκτών Φ6’’ − Εσωτερική πυρίμαχη επένδυση Castable 6’’ πάχους• Αντικατάσταση του υπάρχοντος με τον νέο εναλλάκτη κατά το Επόμενο Shut Down. 4.15 Αποξήλωση Κεντρικής Αποθήκης πρώην Owens Περιλαμβάνονται:• Η αποξήλωση των λαμαρίνων, επικάλυψης και πλαγιοκάλυψης • Η αποξήλωση ηλεκτρολογικών εγκατάστασης • Ή αποξήλωση του μεταλλικού σκελετού της αποθήκης (εκτάσεως 75x173m), • Ή αρίθμηση, μεταφορά και στοίβαξη των υλικών προς επανέγερση σε άλλη θέση του Διυλιστηρίου.4.16 ΕΠΙΣΚΕΥΑΣΤΙΚΕΣ ΕΡΓΑΣΙΕΣ ΔΕΞΑΜΕΝΩΝ ΤΚ-20 & ΤΚ-77 S-003/07 Για την ΤΚ-20 (πλωτής οροφής, D=71.4m H=20m)• Αντικατάσταση 95t ελασμάτων της πλωτής οροφής • Ολική αντικατάσταση πρωτευούσης και δευτερευούσης φραγής πλωτής οροφής• Αντικατάσταση 70t ελασμάτων του πυθμένος • Ολική βαφή του πυθμένος και δεξαμενής • Αντικατάσταση σωληνώσεων εντός της λεκάνης ασφαλείας • Αντικατάσταση γραμμής Φ6’’ αφρογεννήτριας Για την ΤΚ-03 (πλωτής οροφής, D=48,7m H=19m) - αντί της ΤΚ-77 Ολική αντικατάσταση πλωτής οροφής. 4.17 Αποξήλωση σταθμού Δ στο bunkering station του προβλήτος για τις ανάγκες εκφόρτωσης νέων αντιδραστήρων 34-R-005 & 006 • Αποξήλωση ηλεκτρολογικών και οργάνων • Αποσύνδεση σιδήρου στεγάστρου μεταφορά και προσωρινή εναπόθεση του • Συναφείς σωληνουργικές εργασίες και τυφλώματα δικτύων 4.18 Επισκευή δεξαμενής ΤΚ-60 • Αντικατάσταση Annular rings και τοποθέτηση επιθεμάτων στον πυθμένα • Αντικατάσταση τμήματος αγωγού Φ20’’ και επιθεμάτων στα στηρίγματα manifold Φ30’’

Page 13: Εταιρική Παρουσίαση - ALFA PI4 5. Άλφα Πι Εταιρική Παρουσίαση Alfa Pi Company Profile. ALFA PI S.A. is a Construction and Engineering Company,

24 25

4.19 Installation of GRP cooling network As subcontractors of ACTOR S.A, including the jointing of Φ60’’ GRP pipes of a total length of 2x50=1000m and the pressure test of the network 4.20 Repair of damaged bundles of Aircoolers 34-E-049(18 bundles)and 34-E-046 (2 bundles) Including the replacement of damaged tubes and supporting frame, their connec-tion to the collecting boxes, the relative pressure tests and the reinstatement of tube fins as required4.21 Completion of works around the Area of dismantled Tank 60-TK-27 Piping works for the modifications as required for the deletion and new rearrange-ment of firefighting and drainage networks in the basin of the deleted tank.4.22 Repair works in tank TK-18 (D=71.42m, H=20.61m) Floating deck roof• Replacement of 6 annular plates • Replacement of bottom plates 6.5 mm, (2t approx)and pad plates at pipe posts, 33ea • Replacement of tilting roof drainage pipe • Replacement of 5 plates on single deck • Reinstatement of pipeworks within the dike walls 4.23 Installation of steel structures, prefabrication and erection works on Unit 34 (Area 3) As a subcontractor of IREM SpA4.24 Distribution of Diesel Auto Marine and Marine Diesel products For Diesel Marine 0.1% Connection of storage tanks (TK-47 or TK-60)Diesel Marine 0.1%S with TK-203 For Diesel Auto Marine 10ppm Connection of Diesel Marine 0.1% storage area with TK-201 Installation of new pump4.25 Construction of Tie-Ins (Supplementary Erection Works) AF-14 41524.26 Maintenance, repair works and cleaning of Towers and Vessels4.27. Construction of Cooling water system on storage tanks 7-TK-10/14/774.28 Mechanical Works in Unit HDS as part of projects CDUIII optimization & interconnecting of new heater 3-H-01A/B 4.29 Wire Mesh Installation works at two elevators of structure D of Unit 324.30 Provision of two (2) skilled piping engineers as line checkers4.31 Ιnstallation works of high pressure hook ups at Unit 344.32 Fireproof panels in U - 324.33 Installation of protective flashings and framework on existing wire mesh panels4.34 Wire mesh panels installation phase 34.35 New mesh panels installation in U - 32 Str. D & E - ERUP4.36 Wire mesh panels installation & modifications execution4.37 Gutter construction4.38 Replacement work of five fighting -slop-drain piping under Pachi’s Megara jetty of HEL.PE.5. MOTOR OIL HELLAS, CORINTHOS REFINERY S.A. JOB No5.1 Steel Structure for the Reinstallation of E-1112 E/F 3753B5.2 New HPS Line to the Fuel Units 39045.3 Complete Absorption of L.P. Fuel Gas to F-3101 38805.4 Various Pipeworks 3888, 3975, 3980, 3998,39995.5 2’’ HPS line to relief valves on C-1101 38465.6 Pipeworks for 4 new relief valves on input lines to Exchangers E-1112 B/C/E/F 37535.7 Interconnection of new Nitrogen Plant to Fuel Units 39995.8 Raising part of E-2204 outlet line & installation of valves for isolation of E-3207 4002, 40085.9 Modification in lines of summit system of Unit 3100. 40255.10

4.19 Εγκατάσταση δικτύου ψύξης GRP Ως υπεργολάβοι της ΑΚΤΩΡ ΑΤΕ Περιλαμβάνονται η συγκόλληση των σωληνώσεων GRP Φ60’’ μήκους 1000 m, ως και η υδραυλική δοκιμή του δικτύου 4.20 Επισκευή κατεστραμμένων 18 Δεσμών των Αερόψυκτων 34-Ε-049 (16 δέσμες) και 34-Ε-046 (2 δέσμες) Περιλαμβάνονται η αντικατάσταση των αυλών και στηριγμάτων, η σύνδεση με τα collecting boxes και η υδραυλική δοκιμή των δεσμών, ως και η αποκατάσταση των πτερυγίων των αυλών όπου απαιτείται.4.21 Ολοκλήρωση εργασιών πέριξ της αποξήλωθήσης δεξαμενής 60-ΤΚ-27 Μετατροπές για την κατάργηση και αποκατάσταση της νέας λειτουργίας των γραμμών πυρόσβεσης και εξυδάτωσης της δεξαμενής 4.22 Επισκευή δεξαμενής ΤΚ-18 (D=71.42m, H=20.61m, πλωτής οροφής)• Αντικατάσταση 6 annular plates 11mm• Αντικατάσταση bottom plates 6.5mm, (2t περίπου) και επιθεμάτων στα pipe posts, (33τεμ.) • Αντικατάσταση σπαστού αγωγού ομβρίων οροφής • Αντικατάσταση 5 ελασμάτων τον single deck • Σωληνουργικές αποκαταστάσεις εντός του dike wall 4.23 Έργο Αναβάθμισης Διυλιστηρίου Ελευσίνας: Ανέγερση σιδηροκατασκευών, Προκατασκευή & ανέγερση σωληνώσεων στην Μονάδα 34 ως Υπεργολάβοι της εταιρείας IREM SpA4.24 Διακίνηση προϊόντων Diesel Auto Marine και Marine Diesel4.25 Κατασκευή Tie-Ins (Συμπληρωματικές Εργασίες) AF-14 42524.26 Συντήρηση, Επισκευή και Καθαρισμός Πύργων και Δοχείων Πιέσεως4.27 Κατασκευή συστήματος ψύξης νερού στις δεξαμενές αποθήκευσης 7-ΤΚ-10/14/774.28 Εκτέλεση μηχανολογικών εργασιών εντός της μονάδας HDS στα πλαίσια των έργων CDUIII optimization & interconnecting of new heater 3-H-01A/B 4.29 Εργασίες εγκατάστασης συρματοπλέγματος σε δύο ανελκυστήρες στην κατασκευή D, μονάδα 324.30 Παροχή δύο ειδικευμένων μηχανικών σωληνώσεων για τον έλεγχο σωληνογραμμών4.31 Εργασίες εγκατάστασης hook ups υψηλής πίεσης στην μονάδα 344.32 Εγκατάσταση πυράντοχων πανέλς στην μονάδα U-324.33 Εγκατάσταση προστατευτικών πλαισίων σε υπάρχοντα συρματοπλέγματα4.34 Εργασίες εγκατάστασης συρματοπλέγματος - Φάση 34.35 Εργασίες εγκατάστασης συρματοπλέγματος στη μονάδα 32, κατασκευή D & E4.36 Εργασίες εγκατάστασης και μετατροπών συρματοπλέγματος 4.37 Κατασκευή Εργαλείου (Χοάνη)4.38 Εργασίες για την αντικατάσταση των σωληνώσεων πυρόσβεσης -slop-drain κάτωθεν του προβλήτα της Πάχης Μεγάρων των εγκαταστάσεων των ΕΛ.ΠΕ.5. ΜΟΤΟΡ ΟΪΛ ΕΛΛΑΣ Α.Ε., Διυλιστήρια Κορίνθου ΕΡΓΟ5.1 Σιδηροκατασκευή για τη μετεγκατάσταση του Ε-1112 E/F 3753Β5.2 Νέα Γραμμή HPS προς Μονάδες Καυσίμων 39045.3 Πλήρης Απορρόφηση L.P. FUEL GAS στον F-3101 38805.4 Διάφορες εργασίες σωληνώσεων 3888, 3975,3980, 3998, 39995.5 Κατασκευή Γραμμής 2» προς ασφαλιστικά κορυφής C-1101 38465.6 4 νέα ασφαλιστικά στις γραμμές εισόδου των εναλλακτών Ε-1112 B/C/E/F 37535.7 Διασύνδεση νέας μονάδας Αζώτου προς καύσιμα 39995.8 Ανύψωση τμήματος γραμμής εξόδου του Ε-2204 4002 Εγκατάσταση βανών για την απομόνωσης του Ε-3207 40085.9 Μετατροπή γραμμών συστήματος κορυφής μονάδος U-3100 4025

Page 14: Εταιρική Παρουσίαση - ALFA PI4 5. Άλφα Πι Εταιρική Παρουσίαση Alfa Pi Company Profile. ALFA PI S.A. is a Construction and Engineering Company,

26 27

5.10 Instrumentation works for the Refinery Upgrading Project as subcontractor of TCB Ltd, Electrical & Instrument Contractor• Tubing installation for control and automation systems• Installation of control and safety valves5.11 Improvement of Solvent recovery in Parafin Run of U-400 4173 Waste gas line routing for New Boiler F-202 in U-200 4170 Installation of E-2205 in line with E-402 4034 Rearrangement of raw water for Col C-205 in U-200 3801 New line for cleaning of E-202 A/B/C/D by hot HGO 35535.12 Installation of packing System for the improvement of Col C-205 3801 Routing of line BG-40 to T-746/7 for Lube Oil circuit in U-200 4016 Installation of control valves for stripping stream 41675.13 Repairs on Vessel V-4703 47/505.14 Maintenance of the Equipment in the Units of the Refinery - Annual Contract 2002/225.15 Maintenance of the Production Units (71 work orders) 2002/455.16 Replacement of pipework eroded parts in Fuel and Gasoil Units, during Sept 2002 Shut Down (44 work orders) 2002/665.17 Maintenance works in U-3700 during Sept. 2002 Shut Down 2002/545.18 Turn around works in Units U-2100, U-2200 during Sept 2002 Shut Down 2002/795.19 Works for inspection of Towers C-2102 & C-2301 2002/915.20 Deactivation of MOS 22ATS05 44145.21 Line to Relief Valve 11PSV45 41115.22 Water supply line for the new laboratory 37255.23 By pass to Control Valves in U-2500 4548 Vortex meter and flow valve for LPG of Reformer to FCC 4112 Boosting of Atomizing steam by superheaded MPS to F-1101 4197 Connection of MP BFW on compression line of PT-1841 to SLOP 4547 Routing of LPG concentrates of Claus Units to V-4209 43915.24 Installation of new catalyst gauge for U-400 42455.25 Reinstatement of pipeworks in various units (39 work orders) 2003/105.26 Fire-fighting, Steam, Air and Isomerate lines for the new laboratory 42795.27 Connection to new slop vessel V-1105N in U-1100 41115.28 Installation of New Cooler E-3301B in U-3300 4244 5.29 Replacement of catalyst in R-2701 2003/275.30 Turn Around works in Units U-2600/U-3100 during June 2003 Shut Down 2003/335.31 Installation of foam spay gun in U-1100 44505.32 Replacement of Catalyst in Reactor R-2204 2003/725.33 Replacement of Jetty Timber Bumpers (15 pcs) 2003/1A5.34 Modification in Truck Loading Station for DIESEL in lieu of JET oil 46915.35 Stub- outs for the next T.A of U-2700 for the matenalization of job 4671 ‘’Start - up of U-3600 by REFORMATE from U-2700 ‘’ 4681A5.36 NEW MOH MAJOR PROJECTS. As Subcontractors of ENET S.A., Contractor for the erection works of New Plant Installation in the Refinery:• Supply and installation of anchors in the new equipment bases• Various steel construction• Installation of underground steel pipe lines of various size, totaling to 6.500m

5.10 Εγκαταστάσεις οργάνων ελέγχου και αυτοματισμού στα Έργα Αναβάθμισης του Διυλιστηρίου. ως υπεργολάβοι της TCB ΕΠΕ: • Σωληνώσεις για τα όργανα ελέγχου και αυτοματισμού• Εγκατάσταση βανών και ασφαλιστικών 5.11 Βελτίωση ανάκτησης Διαλυτών στο Run Παραφίνης στην U-400 4173 Όδευση waste gas στο νέο F-202 της U-200 4170 Εγκατάσταση του Ε-2205 σε σειρά με τον Ε-402 4034 Αναδιάταξη νερού της στήλης C-205 της U-200 3801 Καθαρισμός των Ε-202 Α/Β/C/D με θερμό UGO 35535.12 Βελτίωση λειτουργίας της στήλης C-205 με εγκατάσταση Packing 3801 Όδευση BG-40 προς Τ-746/7 για κύκλωμα λαδιού της U-200 4016 Εγκατάσταση αυτομάτων βανών ελέγχου ατμού 41675.13 Επισκευή δοχείου V-4703 57/505.14 Συντήρηση Εξοπλισμού Μονάδων του Διυλιστηρίου - Ετήσια Σύμβαση 2002/225.15 Συντήρηση Μονάδων Παραγωγής. (71 εντολές) 2002/455.16 Αντικατάσταση γραμμών Μονάδων Καυσίμων, Βενζινών στο Shut Down Σεπτ. (44 εντολές) 2002/665.17 Εργασίες Συντήρησης στην U-3700 κατά το Shut Down Σεπτ. 2002/545.18 Εργασίες Turn Around των Μονάδων U-2100, U2200 κατά το Shut Down Σεπτ. 2002/795.19 Εργασίες για την επιθεώρηση των Πύργων C-2102 & C-2301 2002/915.20 Απενεργοποίηση MOS 22AT505 44145.21 Γραμμή ασφαλιστικού 11PSV45 41115.22 Παροχή νερού στο νέο χημείο 37255.23 By pass σε Control βάνες στην U-2500 4548 Μετρητής Vοrtex και Flow Valve για το LPG του Reformer προς FCC 4112 Υποβοήθηση Atomizing Steam με Superheated MPS στον F-1101 4197 Σύνδεση ΜΡ BWF με κατάθλιψη ΡΤ -1841 προς Slop 4547 Όδευση συμπυκνωμάτων LPG μονάδων Claus προς V-4209 43915.24 Εγκατάσταση νέου μετρητή καταλύτη Μ-400 42455.25 Αποκατάσταση κυκλωμάτων στις μονάδες (34 εντολές) 2003/105.26 Γραμμές πυρασφάλειας, Ατμού, Αέρα & Isomerate νέου Χημείου 42795.27 Σύνδεση νέου δοχείου SLOP V-1105N της U-1100 41115.28 Νέος ψύκτης E-3301B στην M-3300 42445.29 Αντικατάσταση Καταλύτη στον R-2701 2003/275.30 Εργασίες Turn Around Μονάδων U-2600/ U-3100 στο Shut Down Ιουν 2003/335.31 Τοποθέτηση Monitor Αφρού στην U-1100 44505.32 Αντικατάσταση καταλύτη στον αντιδραστήρα R-2204 2003/725.33 Αντικατάσταση Σιδηρόξυλων Προβλήτα (15Τεμ) 2003/11Α5.34 Μετατροπή Σταθμού Φόρτωσης Βυτιών JET σε DIESEL 46915.35 Κατασκευή Stub - outs σε προσεχές Τ.Α της U-2700, για την υλοποίηση του Έργου 4681 ‘’ Τροφοδοσία Start - Up της U-3600 με REFORMATE από της U-2700 4681Α5.36 ΝΕΑ ΕΡΓΑ ΕΠΕΚΤΑΣΗΣ ΤΟΥ ΔΙΥΛΙΣΤΗΡΙΟΥ Ως Υπεργολάβοι της ΕΝΕΤ Α.Ε, αναδόχου εργασιών για τα νέα έργα του Διυλιστηρίου:• Προμήθεια και εγκατάσταση αγκυρίων στις βάσεις του νέου εξοπλισμού• Διάφορες σιδηροκατασκευές • Εγκατάσταση των σωληνώσεων υπογείων δικτύων διαφόρων μεγεθών, ολικού μήκους 6.500m

Page 15: Εταιρική Παρουσίαση - ALFA PI4 5. Άλφα Πι Εταιρική Παρουσίαση Alfa Pi Company Profile. ALFA PI S.A. is a Construction and Engineering Company,

28 29

5.37 Steel platforms in various places of the units of the refinery 4426 5.38 Modifications in the Foam System Inlet Manifold of T-2000 & T-709 4461 installation of Knock – out Drum in U-6300 41065.39 Replacement of Timber Bumpers in Jetty No 2 2003/865.40 Modification to the HF Urgent Evacuation System (4’’ pipework between towers C-2101 & C-2201) 3848/A5.41 Tie-ins in U-400 2005/6 5.42 Replacement of part of Φ24’’ flare line in gas oil 2005/135.43 Replacement of eroded parts in 9 Utility lines for the GENERAL SHUT DOWN (No1) 2005/365.44 Maintenance works of Equipment in units U-1100, U-1200, U-1300, U-1400, during the TURN AROUND in April 20055.45 Replacement of pipework eroded parts in units U-1100, U-1200, U-1300, U-1400, U-1500, U-4700, U-4800, U-2100, U-2200, U-2400, U-2600 & PCC U-3100 during the TURN AROUND in April 2005 (64 orders)5.46 Pipe routing of Distillates to P-812 5026/C Water curtains on unit U-7600 5008/2 New Nitrogen line to MHC 48995.47 Installation of fire water curtain in U-7600 5008 New valve LV -5012B 4780/2 New connection to Desalination units 50195.48 Installation of new Extractor V-3452 4409 H2 Recovery from S-2272 4616 Drain pipe routing from V-2104 to V-2102 4795 5.49 Installation of new foam monitor for meter and hydrants at dock site Installation of water curtain shower system in PSA of U-7600 50225.50 Blinding works in Fuel oil Units No 1 2005/665.51 Modifications of lines to V-3452 44095.52 Routing of acid water lines of desulphurization units in U-4950 5142 Segregation of T-1501 from POLISHING unit process 51455.53 Connection of Sampling system for Slurry 5138 Construction of sampling bottles for MDEA in U-7300 5110 Instrument air supply line to pumphouse C 4114/2 Instrument air supply line to fume gas analyzer in FCC 4090/35.54 Routing of part of unfiltered CLO to tank 5.55 Pipe support and steel platforms in FCC units and new MHC units 4400/47 Extention per 4400/47-2 included 5.56 Modification of JP-4 Line to SERVICE ADO 5030B5.57 Repairs on Tank T- 301 2006/235.58 Repairs to Tube Bundle Plate of Aircooler EM-3107 2006/205.59 By pass line for Exchanger E-203A 2006/285.60 Pipeworks and steel structure for the new Tank T-771,T-775, T-779 48865.61 Turn Around works in Unit U-100 during October 2006 Shut Down5.62 Inspection and replacement of radiant coil tubes and supports in Furnace F-3101 during Dec 2006 Shut Down: Including the blinding procedure for inspection 16’’ and the replacement of 75 radiant coil tubes Φ 3½’’ (150 welds P5 with 100% PWHT & NDE) during the 11 day Shut Down 5.63 Replacement of pipework eroded parts in U-4700 & U-1900 for Jan.2008 Shut Down.5.64 Condensate Cooling for V- 771 & V-4209 5365, 5367

5.37 Κατασκευή Μεταλλικών Πλατφορμών σε διάφορες θέσεις των μονάδων του Διυλιστηρίου 44265.38 Μετακίνηση Manifolds Εισαγωγής Αφρού στις Τ-2000 & Τ-709 4461 Εγκατάσταση Knock –out Drum στην U-6300 41065.39 Αντικατάσταση Σιδηρόξυλων στην Προβλήτα Νο 2 2003/865.40 Τροποποιήσεις στο σύστημα επείγουσας απομάκρυνσης ΗF (σωληνώσεις 4’’ μεταξύ των Πύργων C-2101 & C-2201) 3848Α 5.41 Τοποθέτηση tie - ins στην U-400 2005/6 5.42 Αντικατάσταση γραμμής Flare βενζινών 24’’ 2005/135.43 Αντικατάσταση 9 τμημάτων γραμμών στις μονάδες UTILITIES κατά GENERAL SHUT DOWN (No1) 2005/365.44 Εργασίες Συντήρησης εξοπλισμού στις μονάδες U-1100, U-1200, U-1300, U-1400 κατά το TURN AROUND Απριλίου. 5.45 Αντικατάσταση Τμημάτων Σωληνώσεων των μονάδων καυσίμων / βενζινών U-1100, U-1200,U-1300, U-1400, U-1500, U-4700, U-4800, U-2100, U-2200, U-2400, U-2600 και PCC U-3100 κατά το TURN AROUND Απριλίου (64 εντολές)5.46 Όδευση Distillates προς Ρ-812 5026C Κουρτίνες νερού στην U-7600 5008/2 Νέα Γραμμή αζώτου προς MHC 48995.47 Τοποθέτηση κουρτινών νερού στην U-7600 5008 Νέα βάνα LV-5012B 4780/2 Νέες συνδέσεις στις μονάδες αφαλάτωσης 50195.48 Εγκατάσταση νέου Extractor V-3452 4409 Ανάκτηση Η2 από το S-2272 4616 Όδευση αποχέτευσης από V-2104 προς V-2102 47955.49 Τοποθέτηση νέου μόνιτορ καταιονισμού αφρού στους μετρητές και υδροληπτικά στο λιμάνι 4676 Τοποθέτηση «κουρτινών» νερού στην PSA της U-7600 50225.50 Τοποθέτηση τυφλών στις μονάδες καυσίμων Νο 1 2005/665.51 Κατασκευή και αντικατάσταση γραμμών στο V-34525.52 Όδευση όξινων νερών μονάδων αποθείωσης στην U-4950 5142 Ανεξαρτητοποίηση της Τ-1501 από την μονάδα POLISHING 51455.53 Σύνδεση δειγματοληπτικού Slurry 5138 Κατασκευή δειγματοληπτικών MDEA στην U-7300 5110 Παροχή αέρα οργάνων προς αντλιοστάσιο C 4114/2 Παροχή αέρα οργάνων προς αναλυτή καπναερίων FCC 4090/35.54 Όδευση μέρους αφιλτράριστου CLO σε Δ/Ξ5.55 Στήριξη σωληνώσεων και κατασκευή παταριών στην περιοχή μονάδων FCC και νέων μονάδων MHC 4400/475.56 Μετατροπή γραμμής JP-4 σε SERVICE ADO 5030 Β 5.57 Επισκευή δεξαμενής Τ-301 2006/235.58 Επισκευή καθρεπτών του αεροψύκτου ΕΜ-3107 2006/205.59 Κατασκευή by pass στον εναλλάκτη Ε-203Α 2006/285.60 Σωληνώσεις και σιδηροκατασκευές για τις νέες δεξαμενές Τ-771,Τ-775, Τ-779 48865.61 Εργασίες Turn Around της U-100 κατά το Shut Down Οκτ.20065.62 Επιθεώρηση και αντικατάσταση αυλών και αυλοστηριγμάτων στον φούρνο F-3101 κατά το Shut Down Δεκ. 2006 Περιλαμβάνονται τα τυφλώματα και εξαρμώσεις για την επιθεώρηση, ως και η αντικατάσταση 75 αυλών Φ 3 ½’’ (150 συγκολλήσεις Ρ5 με ανόπτηση και ΝDE) κατά την 11ήμερο κράτηση.5.63 Αντικατάσταση γραμμών στις U-1900 & U-4700 κατά το Shut Down Ιαν.20085.64 Ψύξη Condensates των V-771 &V-4209 5365, 5637

Page 16: Εταιρική Παρουσίαση - ALFA PI4 5. Άλφα Πι Εταιρική Παρουσίαση Alfa Pi Company Profile. ALFA PI S.A. is a Construction and Engineering Company,

30 31

Vent Extension in T-1101 5372 Improvement of Snuffing Steam Circuits in U-2200 5405 Nitrogen Line connection to E-2275/2276 & replacement 5407 of Entry Block valve of E-2275 5.65 Maintenance and chemical cleaning of Desalination Units U-1900/ U-1950 (3 years contract)5.66 Replacement of the Rotary Vacuum Dewaxing Filter S-401 B, including:• Disconnection removal and carting away of the existing 55t Filter • Installation of a similar new filter • Modification in piping installation for the new filter 5.67 Extraction for inspection and reinstallation of Tube Bundles of Slurry Filters PK-3201 S1A/S1B during the June 2007 Shut Down of FCC unit5.68 Steel Platforms in various places in the Units of the Refinery. 4856B5.69 Separate routing of compression line from pumps P-7608A/B to Vessels V-7618 /7603 5243 Nitrogen line to V-3106 4807 New Oil Sump in FCC Area (V-4151/4155 & P-4151/4155) 44545.70 Installation of 3 Fire water curtains for APII 48735.71 Connection of Drains of pumps P-7503A/B & P-7503A/B 5234 to the closed drain circuit MPS Steam line interconnection to S-7501 5238 Installation of catch Beams for MHC on lines of U-7500 & U-3200 52795.72 New interconnections for pumps P-3151A/B 54835.73 Modification of pipe works for the relocation of Filter Jet in TLT 52125.74 Installation of MP BFW on crossovers of Furnace F-101 4740 Sampling bottle FG for V-7851 5154 Extension of Vent Line for T-5801 5368 Sampler Vessel for HPS steam of Heaters 54925.75 Improvement of steam tracing of fuel oil lineto F-2501/2 5304 New line DMDS in U-7600 54605.76 Replacement from vessels V-4213 A/B 5003 Drainage system in U-4200 4950 Concentrate line outing of V-7905 to sewer 5108 Use of Raw Water for Flushing of P-3503 4827 Installation of a 1’’ Control Valve 51695.77 SRFO, LCO & CLO feeders to U-1100 50055.78 Turn Around Works in U-200 5.79 Turn Around works for the Tower, 2 Furnaces, 3 vessels and 6 aircoolers in unit U-2500, as subcontractors of PM- ENERGO 5.80 Replacement of pipework eroded parts of U-3700 during Aug. 2008 Shut Down 5.81 Turn Around works in U-4200, U-4300, U-2600 5.82 Turn Around Works in U-37005.83 Replacement of pipework eroded parts in Fuel & Gas Oil Units for 2008 Shut Down 5.84 New regulating feeding valve U-500 5431 Double Block 7 Bleed valves for F.G & P.G systems of F-501 4247C5.85 Testing of JET Desulphurization in U-3600 58395.86 On/off Valve in Fuel oil circuit for F-1101 5459 Permanent lines for steaming of V-1102/3 5787

Επέκταση Vent στην Τ- 1101 5372 Βελτίωση σε κυκλώματα snuffing στην U-2200 5405 Σύνδεση γραμμών αζώτου στους Ε-2275/2276 και αλλαγή Block Βάνας εισόδου στο Ε-2275 54075.65 Εργασίες συντήρησης και χημικού καθαρισμού των μονάδων αφαλατώσεως U-1900/U-1950 (Τριετής Σύμβαση)5.66 Αντικατάσταση φίλτρου S-401 Β, που περιλαμβάνει- Εξάρμωση, αποξήλωση και αποκομιδή υπάρχοντος περιστροφικού φίλτρου αποκηρώσεως βάρους 55t - Εγκατάσταση νέου παρόμοιου φίλτρου - Μετατροπές στις υπάρχουσες σωληνώσεις5.67 Εξαγωγή και τοποθέτηση κατόπιν επιθεωρήσεως των Tube Bundles στα Slurry Filters PK - 3201 S1A /S1B κατά το έκτακτο Shut Down της FCC Ιουν.20075.68 Κατασκευή μεταλλικών πλατφόρμων σε διάφορες θέσεις των μονάδων των Διυλιστηρίων.5.69 Ανεξάρτητη όδευση των γραμμών κατάθλιψης Ρ-7608 Α/Β προς δοχεία V-7618/7603 5243 Γραμμή Αζώτου προς V-3106 4807 Νέο Oil Sump περιοχής FCC(V-4151/4155 & P-4151/4155) 44545.70 Τοποθέτηση 3 κουρτινών νερού στο ΑΡΙ Ι 48735.71 Σύνδεση των Drains των Αντλιών Ρ-7503Α/Β & Ρ-7504 Α/Β 5234 με το κλειστό κύκλωμα και το κλειστό Αμινών Διασύνδεση Ατμού ΜPS στο S-7501 Τοποθέτηση στηριγμάτων Catch beams στον MHC σε σωληνώσεις 5238 της U-7500 και U-3200 52795.72 Νέες διασυνδέσεις στις αντλίες Ρ-3151Α/Β 54835.73 Μεταφορά φίλτρου Jet στο TLT (μετατροπή σωληνώσεων) 52125.74 Προσθήκη ΜΡ BFW στα Πάσσα του F-101 4740 Δειγματοληπτικό FG από το V-7851 5154 Επέκταση των γραμμών Vent της Τ-5801 5368 Κατασκευή δειγματοληπτικού δοχείου για ατμό HPS λεβήτων 54925.75 Βελτίωση Steam Tracing Fuel Oil προς F-2501/2 5304 Κατασκευή νέας γραμμής DMDS στην U-7600 54605.76 Αντικατάσταση δοχείων V-4213 Α/Β 5303 Σύστημα αποστράγγισης στην U-4200 4950 Δυνατότητα όδευσης συμπυκνωμάτων V-7905 προς υπόνομο 5108 Χρησιμοποίηση Raw Water για Flushing στην Ρ-3503 4827 Εγκατάσταση Control Valve 1’’ ίντσας 51695.77 Τροφοδοσία της U-1100 με SRFO, LCO, CLO 50055.78 Εργασίες Turn Around Μονάδος U-2005.79 Εργασίες Turn Around για τον Πύργο, 2 Φούρνους, 3 Δοχεία και 6 αερόψυκτα της μονάδος U-2500, ως υπεργολάβοι της ΡΜ-ENERGO 5.80 Αντικατάσταση Τμημάτων Γραμμών της U-3700 κατά το Turn Around της μονάδας5.81 Εργασίες Turn Around των Μονάδων U-4200, U-4300, U-2600 5.82 Εργασίες Turn Around Μονάδος U-3700 5.83 Αντικατάσταση Τμημάτων Σωληνώσεων Μονάδων καυσίμων - Βενζινών κατά το Shut Down των μονάδων5.84 Νέα ρυθμιστική βάνα τροφοδοσίας των μονάδων στην U-500 5431 Double block και bleed βάνες στο σύστημα F.G και P.G του F-501 4247C5.85 Δοκιμή αποθείωσης JET της U-3600 και επέκτασης αυτού 58395.86 Εγκατάσταση on/off βάνας στο κύκλωμα fuel oil του F-1101 5459 Μόνιμες γραμμές άτμησης V-1102/3 5787

Page 17: Εταιρική Παρουσίαση - ALFA PI4 5. Άλφα Πι Εταιρική Παρουσίαση Alfa Pi Company Profile. ALFA PI S.A. is a Construction and Engineering Company,

32 33

Diesel line routing in U-1100 till Flux of U-100 5788 New Control Valve to JET line in U-1100 54895.87 Independent Lines for Chemicals Additives to Summit System of Unit U-1100 57695.88 Repairs of V-37165.89 Change of routing of firefighting lines in Boilers Area 58985.90 Change of routing of firefighting line from U-1200 to U-4300 59345.91 Replacement of part of Parafin line on JETTY C 5.92 New Air-Mixer in U-1400 & Routing of condensate line of U-1970 to tank T-781A 56965.93 LPS lines for the new fuel oil tanks 54915.94 By pass for E-418 5686 Modification on circuit of P-406A/B 5740 Relocation of flowmeters in U-300/400 5819 Recirculation of SLACK WAX through C-405 5993 Modification of Inert line S-401C 5998 Rerouting of drain line of U-500 vessels to V-413 59995.95 Turn Around works in U-1005.96 Turn Around works in U-4005.97 Turn Around works in U-500 54915.98 Shut Down works in Furnaces F-3101 No 25.99 Firefighting line for new tanks T-780, T-788, T-760 55695.100 Modification Recirculation, for T-7110 6090 Modification for F.O supply to T-780 from T-768 5569C5.101 Modification for use T-756 to service VGO 61455.102 Turn Around works in U-1400 (GSD 2011)5.103 Turn Around works in U-3100 (GSD 2011)5.104 Turn Around works in Mild Hydro Cracker (with BIOTEK) (GSD 2011)5.105: General Shut Down 2013/ With companies ΒΙΟΤΕΚ and PMS ENERGO5.105.1 Turn Around Works in Mild Hydro Cracker 5.105.2 Turn Around works in U-4200, U-4300, U-2600 and projects: 6707, 6547, 6550, 6686, 6380, 62575.105.3 Modifications of Pressure Safety Valves (PSV’s) in U-4200, U-4300 5.105.4 Line installation from V-2510 to pilot gas lines F-2501 and F-2502 5.105.5 Modifications of Pressure Safety Valves (PSV’s) in U-2600 5.105.6 6714: Rich Mdea to Hydrocracker 5.105.7 6734: BFW in E-7301 5.105.8 Various Orders for U-4200/ U-4300/ U-2600 5.106 Hydrogen routing from U-7600 to U-3600 67185.107 Visbreaker upgrade unit M-100, Phase A- Tie-Ins Preparation 64175.108 Visbreaker upgrade unit M-100: Underground firefighting piping installation 64175.109 Visbreaker upgrade unit M-100: Tie-ins Construction 64175.110 New Pumps Installation/TRV’s Installation 5384 5568 61295.111 Visbreaker upgrade unit M-100: Steel Structure Erection 6417-095.112 S-3601 A/B filter installation in M-3600 / Nitrogen routing improvement for pressure stabilization in V-2505 / Nitrogen routing improvement for pressure stabilization in V-2106 6882 6780 6779 5.113 New control valve pic8307 installation / Flow meter installation in U-1400 exit 6570 6878C

‘Όδευση diesel στην U-1100 έως FLUX της U-100 5788 Νέα Control βάνας στην απόληξη JET της U-1100 54895.87 Ανεξάρτητες γραμμές χημικών προσθέτων στο Σύστημα Κορυφής της U-1100 57695.88 Επισκευή δοχείου V-37165.89 Αλλαγή όδευσης γραμμής πυρασφάλειας περιοχής λεβητών 58985.90 Αλλαγή όδευσης αγωγού πυρασφάλειας από U-1200 έως U-4300 59345.91 Αντικατάσταση Τμήματος Γραμμής Παραφίνης στον προβλήτα C5.92 Νέο Air- Mixer στην U-1400 & όδευση Γραμμής Συμπυκνωμάτων της U-1970 προς Τ-781Α 56965.93 LPS στις νέες δεξαμενές Fuel Oil T-785/759 54915.94 Κατασκευή Παρακάμψεως στον ΕΜ-418 5686 Τροποποιήσεις στο κύκλωμα των Ρ-406Α/Β 5740 Μεταφορά μετρητών ροής U-300/400 5819 Ανακυκλοφορία SLACK WAX μέσω C-405 5993 Τροποποίηση γραμμής αδρανούς S-401C ’’ 5998 Αλλαγή οδεύσεως DRAIN δοχείων U-500 προς V-413 59995.95 Εργασίες TURN AROUND της U-1005.96 Εργασίες TURN AROUND της U-4005.97 Εργασίες TURN AROUND της U-5005.98 Εργασίες Shut Down στο Φούρνο F-3101 No 2 (αντικατάσταση 4 αυλών του Radiant) 5.99 Γραμμή Πυρασφάλειας νέων Δεξαμενών Τ-780, Τ-788, Τ-760 55695.100 Τροποποίηση στην γραμμή ανακυκλοφορίας της Τ-8110 6090 Χρήση Τ-788 για μεταφορά F.O από Τ-767 5569C5.101 Χρήση Τ-756 σε service VGO 61455.102 Εργασίες TURN AROUND U-14005.103 Εργασίες TURN AROUND U-31005.104 Εργασίες TURN AROUND Mild Hydro Cracker (ως Υπεργολάβοι της ΒΙΟΤΕΚ)5.105: General Shut Down 2013/Σε συνεργασία με τις εταιρείες ΒΙΟΤΕΚ και PMS ENERGO5.105.1 Εργασίες TURN AROUND Mild Hydro Cracker 5.105.2 Βελτίωση λειτουργίας/Αναβάθμιση των Μονάδων U-4200, U-4300, U-2600 και έργα ΤΜΚ 6707, 6547, 6550, 6686, 6380, 62575.105.3 Ασφαλιστικά σε μονάδες παραγωγής Μ-4200/ Μ-4300 5.105.4 Εγκατάσταση γραμμής από V-2510 προς γραμμή pilot gas F-2501 και F-2502 5.105.5 Ασφαλιστικά σε μονάδα παραγωγής Μ-2600 5.105.6 6714: Όδευση Rich Mdea προς Hydrocracker 5.105.7 6734: Αναμονές bfw στο Ε-7301 5.105.8 Υπηρεσιακά σημειώματα U-4200/U-4300/U-26005.106 Όδευση Υδρογόνου από U-7600 προς U-3600 67185.107 Αναβάθμιση Visbreaker Μ-100 Α Φάση 64175.108 Αναβάθμιση Visbreaker Μ-100 : Εγκατάσταση υπόγειας γραμμής πυρασφάλειας 64175.109 Αναβάθμιση Visbreaker Μ-100 : Κατασκευή Tie-ins 64175.110 Τοποθέτηση νέας αντλίας Ρ-751ΕΝ/Νέα αντλία ομβρίων/λαδιών στην U-1100/Εγκατάσταση TRV’s σε νέες γραμμές αργού 5384 5568 61295.111 Αναβάθμιση Visbreaker Μ-100 : Ανέγερση σιδηροκατασκευών 6417-095.112 Εγκατάσταση φίλτρων S-3601 Α/Β στην τροφοδοσία της Μ-3600 / Βελτίωση στην προσθήκη οδεύσεως αζώτου για την σταθεροποίηση πιέσεως στο δοχείο V-2505 / Βελτίωση στην προσθήκη οδεύσεως αζώτου για την σταθεροποίηση πιέσεως στο δοχείο V-2106 6882 6780 67795.113 Τοποθέτηση νέας Control βάνας PIC8307(N) στο κύκλωμα άερα δ/ριου / Τοποθέτηση νέου μετρητή ροής στην έξοδο της U-1400 6570 6878C

Page 18: Εταιρική Παρουσίαση - ALFA PI4 5. Άλφα Πι Εταιρική Παρουσίαση Alfa Pi Company Profile. ALFA PI S.A. is a Construction and Engineering Company,

34 35

5.114 Nitrogen routing for pressure stabilization in C-1202/1203 in idle state 69015.115 Line construction for exit routing of DAF2 to P-4005 A/B/C 67625.116 22LV05 transfer and circuit replacement 67735.117 Hudrogen supply of M-7700N in case of SD/UPSET of M-7600 / Pig signalers and MOV’s installation 6815, 6799 5.118 LPS use on E-7531 67666. OKTA REFINERY, SKOPJE FYROM ALFA PI S.A., as member of the Group of Companies «Refinery Upgrading - REFUP», which is the Contractor for the Upgrading works of OKTA Refinery in Skopje, undertook the execution of the following:6.1 Refurbishing of Equipment for Diesel HDS and SR Units A second hand equipment for a Diesel Hydrodesulphurization Unit, along with a Sulphur Recovery Unit, is purchased by the Employer from a Danish refinery, total-ing to 1200t. Refurbishing works include the following:• Receival of equipment in Thessaloniki Port, transportation and unloading to the workshop yard in Thessaloniki Area.• Removal of existing insulation, internal and external cleaning by thorough water jetting, internal, external and wall thickness inspection, and replacement of eroded parts.• Reassembly of equipment and pressure testing • Sandblasting and final painting (Conformity certification and transportation to Scopje by others)6.2 Reception, unloading and stocking on prepared bases of the as above trans-ported equipment, in storage area of OCTA Refinery in Skopje 6.3 Improvement of the firefighting system of the Refinery ALFA PI scope includes the following:• Supply and installation of Diesel Motor in the firefighting pumphouse.• Installation of water and foam sprinkler system on both rail lines of the train loading station.• Replacement of the damaged part of the underground network of the fire fighting system of the refinery, for a total length of 2.5 km, with GRP pipes ND250 and 200.6.4 Supports for cable trays for OKTA Terminal as subcontractors of TCB, contractor of electrical works of the station. Supply of materials, fabrication and installation of steel supports 6.5 Installation of 2 new boilers in the boiler Room of the refinery ALFA PI scope includes the following:• Supply, fabrication, erection and painting of the required supporting steel struc-ture in the boiler room, including base foundations as required.• Erection of fume ducts.• Fabrication and erection works of pipeworks of the various networks in the boiler room.• Insulation where required6.6 Erection of new HDS (Gasoil Hydrodesulphurisation) Unit ALFA PI scope is the erection works for the mechanical installation of the plant, comprising the following :• Erection of equipment, including− 2 Towers R-801 & R-802− 1 Furnace F-801− 2 Heat Exchangers & 2 Air Coolers − Set of Pumps • Installation of pipeworks for the various networks, including surface preparation (sandblasting & priming), prefabrication, erection, NDT, hydraulic testing, paint-ing and insulation, where required.

5.114 Προσθήκη οδεύσεως αζώτου για την διατήρηση πίεσης στους C-1202/1203 σε κατάσταση idle 69015.115 Κατασκευή γραμμής για όδευση εξόδου του DAF2 προς τις P-4005 A/B/C 67625.116 Μεταφορά 22LV05 και αντικατάσταση κυκλώματος 67735.117 Τροφοδοσία με Η2 της Μ-7700Ν σε περίπτωση SD/Upset της Μ-7600 / Εγκατάσταση pig signalers και αυτόματων MOV στις φωλιές των pigs στις προβλήτες Β και C 6815 67995.118 Χρήση LPS στον Ε-7531 67666. ΔΙΫΛΙΣΤΗΡΙΟ ΟΚΤΑ, Σκόπια, ΠΓΔΜ Η ΑΛΦΑ ΠΙ Α.Ε., ως μέλος του Ομίλου εταιριών‘’Refinery Upgrading - REFUP’’, Αναδόχου των έργων αναβάθμισης του διυλιστηρίου των Σκοπίων, ανέλαβε την εκτέλεση των κάτωθι: 6.1 Ανακαίνιση Εξοπλισμού Μονάδων Αποθείωσης Diesel και Ανάκτησης Θείου. Ο Ιδιοκτήτης αγόρασε τον μεταχειρισμένο εξοπλισμό Μονάδος Αποθείωσης από Διυλιστήριο στη Δανία συνολικού βάρους 1.200t. Οι εργασίες ανακαίνισης περιλαμβάνουν τα κάτωθι:• Παραλαβή του εξοπλισμού από τον Λιμένα Θεσσαλονίκης, μεταφορά και εκφόρτωση στο χώρο επεξεργασίας στην περιοχή Θεσσαλονίκης.• Αποξήλωση υπάρχουσας μόνωσης, εσωτερικός και εξωτερικός καθαρισμός με εκτόξευση νερού υπό πίεση, διεξοδική εσωτερική και εξωτερική επιθεώρηση και μέτρηση πάχους ελασμάτων του εξοπλισμού και αντικατάσταση διαβρωθέντων τμημάτων.• Επανασύνθεση του εξοπλισμού και υδραυλική δοκιμή.• Αμμοβολή και τελική βαφή. (Η πιστοποίηση καταλληλότητος και η μεταφορά του εξοπλισμού στα Σκόπια έγιναν από τρίτους)6.2 Υποδοχή, εκφόρτωσης και εναπόθεση επί βάσεων του ως άνω μεταφερθέντος εξοπλισμού σε χώρο αποθήκευσης της OCTA στα Σκόπια 6.3 Βελτίωση του συστήματος πυρόσβεσης των Διυλιστηρίων Οι εργασίες βελτίωσης περιλαμβάνουν τα κάτωθι:• Προμήθεια και εγκατάσταση Πετρελαιοκινητήρα στο αντλιοστάσιο πυρόσβεσης.• Κατασκευή δικτύου sprinklers νερού και αφρού στις 2 γραμμές του σταθμού φόρτωσης τρένων.• Αντικατάσταση του φθαρμένου τμήματος του δικτύου πυρόσβεσης του Διυλιστηρίου μήκους 2,5 χιλιομέτρων, με σωλήνες GRP ΝD250 και 2006.4 Στηρίγματα εσχαρών καλωδίων του Τερματικού Σταθμού της ΟΚΤΑ ως υπεργολάβοι της TCB, εργολάβου των ηλεκτρολογικών εργασιών: Προμήθεια, προκατασκευή και τοποθέτηση των μεταλλικών στηριγμάτων.6.5 Εγκατάσταση 2 νέων Λεβήτων στο Λεβητοστάσιο του Διυλιστηρίου Περιλαμβάνονται επίσης :• Προμήθεια, κατασκευή, ανέγερση και βαφή των απαιτούμενων ικριωμάτων μετά της θεμελιώσεως των.• Ανέγερση καπναγωγών • Κατασκευή και εγκατάσταση των δικτύων σωληνώσεων εντός του λεβητοστασίου• Μονώσεις όπου απαιτούνται6.6 Ανέγερση Νέας Μονάδας Υδροαποθείωσης Βενζίνης HDS Το αντικείμενο της ΑΛΦΑ ΠΙ είναι η ανέγερση των μηχανολογικών εγκαταστάσεων, αποτελούμενων από τα κάτωθι :• Ανέγερση του εξοπλισμού. Περιλαμβάνονται τα κάτωθι:− 2 Πύργοι R-801 & R-802− 1 Φούρνος F-801− 2 Εναλλάκτες & 2 Αερόψυκτα − Αντλίες • Εγκατάσταση των σωληνώσεων των διαφόρων δικτύων, Περιλαμβάνονται η προστασίας επιφάνεια (αμμοβολή-στάρωμα), προκατασκευή και ανέγερση, ως και οι μη καταστρεπτικές δοκιμές συγκολλήσεων, υδραυλικές δοκιμές, βαφή και μόνωση όπου απαιτείται.

Page 19: Εταιρική Παρουσίαση - ALFA PI4 5. Άλφα Πι Εταιρική Παρουσίαση Alfa Pi Company Profile. ALFA PI S.A. is a Construction and Engineering Company,

36 37

• Fabrication and erection of steel structures for the equipment, piperacks and pipework supports. Furthermore ALFA PI has completed installation works of considerable size for Public Power Corporation (ΔΕΗ) and other industrial installations of other Public or Private Sector, as fol-lows:7. PUBLIC POWER CORPORATION (PPC) AT LAVRIO POWER STATION 7.1.1 COMBINED POWER GENERATION BLOCK : 2G.T. (gas turbines) and 1S.T (steam turbine) ALFA PI S.A. undertook the following installation works from BABCOCK ENERGY LIMITED, the Main Contractor of the project • Cooling water intake GRP pipe 1600mm N.D., 1200m long• Metallic / GRP Bifurcation 2 x 1200 to 1600mm for main Cooling Pump discharge with special protective rubber lining at contacts with concrete.• The propane tanks and network, both in GRP.• HVAC for Control Room• Instrument hook up tubing7.2 ERECTION OF UNIT No 5 OF COMBINED CYCLE ON ONE SHAFT, OF 377.66 MW OUTPUT ALFA PI undertook the execution of various works as subcontractors of RODAX/ METKA, as follows :• Mechanical installation of pressure level and flow measuring instruments and transmitters.• Mechanical installation of an auxiliary Boiler.8. PUBLIC POWER CORPORATION-RHODOS POWER PLANT8.1 Erection of 3 Thermal Power Units, 23.4MW each, in the Power Plant of Soroni in Rhodos Island. As Subcontractors of the Consortium SEMT/ABB/TECHNICAL UNION, Erection of Air Intake and Exhaust Gas Systems for the 3 units, including the re-spective installation of:• Equipment• Duct and pipe works• Metallic frameworks and supports• Metallic stairs and landing• Fuel supply line from the Tanks• Calibration and installation of instrument for exhaust system and fuel tank gauges Total weight of all above: 530 tons9. PUBLIC GAS CORPORATION OF GREECE S.A (DEPA) 9.1 DEPA LNG TERMINAL EXPANSION AT REVITHOUSSA ISLAND As subcontractors of ATHINA S.A, Main Contractors of the Expansion Project. Installation of seawater GPR pipeline of various sizes up to 36’’, for a total length of 520m. Jointing of prefabricated spools by the lamination method and bolted connections.10. ATHENS INTERNATIONAL AIRPORT As subcontractors of J&P – AVAX S.A, Main Contractor for Infrastructure projects in A.I.A: 10.1 Installation of a 2.000m HDPE DN 110 Sewage line, running parallel to the dual carriageway in the airport. 10.2 Replacement of galvanized pipework to stainless steel in 12 sewage pits of the Airport.10.3 Modification to the Hydrant Refueling System (HRS) in Loop D Aircraft Stands for the Satellite Terminal Building (STB) Expansion Project. 11. DOW HELLAS S.A., Thorikon - Lavrion MODIFICATION OF STYROFOAM PRODUCTION PLANT (Line 1)11.1 As Subcontractors of BECK & POLLITZER ENGINEERING Ltd for the Execution of the modification in mechanical installation of the 1st production line (Job No. KP-040097/CC-49.01) executed during the June 2001 Shut Down of the plant includ-ing:• prefabrication, erection, testing and painting of new pipeworks

• Προκατασκευή και ανέγερση των σιδηροκατασκευών για τον εξοπλισμό, σωληνοδιαδρόμους και στηρίγματα σωληνώσεων. Επίσης η ΑΛΦΑ ΠΙ εκτέλεσε σημαντικά Έργα στην ΔΕΗ και σε άλλες Βιομηχανικές Εγκαταστάσεις Φορέων Δημοσίου και Ιδιωτικού Δικαίου, περιλαμβανομένων των κάτωθι:7. ΔΕΗ /ΗΛΕΚΤΡΟΠΑΡΑΓΩΓΟΣ ΣΤΑΘΜΟΣ ΛΑΥΡΙΟΥ 7.1 Ανέγερση Ηλεκτροπαραγωγού Συγκροτήματος με συνδυασμένες πηγές ενέργειας (2 αεροστρόβιλων και 1 ατμοστροβίλου). Η ΑΛΦΑ-ΠΙ προέβη στην εκτέλεση διαφόρων εργασιών ως υπεργολάβοι της “BABCOCK ENERGY LTD”, ως έπεται :- Εγκατάσταση σωληνώσεως GRP εισόδου θαλάσσιου ύδατος ψύξης διαμέτρου 1600 χιλ., μήκους 1200μ., με επιτόπου κατασκευή εξαρτημάτων GRP.- Μεταλλικό παντελόνι (Y-spool) 2 x 1200 σε 1600 χιλ. εξόδου αντλιών ψύξεως και εσωτερική επικάλυψη από λάστιχο 20 χιλ.- Εγκατάσταση και θέση σε λειτουργία συστήματος κλιματισμού και απαγωγής αέρα στην αίθουσα ελέγχου - Δεξαμενές και σωλήνωση προπανίου από GRP- Σωληνώσεις hook up οργάνων7.2 Ανέγερση Εγκατάστασης Μονάδας Αρ. 5 Συνδυασμένου κύκλου επί ενός άξονος, ισχύος 377,66MV. Η ΑΛΦΑ ΠΙ ως υπεργολάβοι της RODAX ATEE / METKA AE, ανέλαβε την εκτέλεση διαφόρων εργασιών, ως έπεται :- Μηχανολογική ανέγερση οργάνων πιέσεως, στάθμης και ροής- Μηχανολογική ανέγερση βοηθητικού Λέβητα8. ΔΕΗ/ ΗΛΕΚΤΡΟΠΑΡΑΓΩΓΟΣ ΣΤΑΘΜΟΣ ΡΟΔΟΥ 8.1 Ανέγερση 3 Θερμικών Μονάδων Παραγωγής, 23.4 MW εκάστη, στον Σταθμό Παραγωγής Ρεύματος στη Σορωνή Ρόδου: Ως υπεργολάβοι της Κ/Ξ SEMT/ABB/ΤΕΧΝΙΚΗ ΕΝΩΣΗ: Εγκατάσταση των Συστημάτων Εισαγωγής Αέρος και Απαγωγής Αερίων Καύσεως, Περιλαμβάνονται τα κάτωθι:- Εξοπλισμός της εγκαταστάσεως - Αεραγωγοί και σωληνώσεις - Σιδηρές κατασκευές και στηρίγματα- Μεταλλικές κλίμακες και πλατφόρμες- Γραμμή τροφοδοσίας καυσίμων από τις δεξαμενές- Βαθμονόμηση και εγκατάσταση οργάνων στο σύστημα εξαερισμού και μετρητών στάθμης δεξαμενών Συνολικό βάρος των ανωτέρω : 530 τόνοι9. ΔΗΜΟΣΙΑ ΕΠΙΧΕΙΡΗΣΗ ΑΕΡΙΟΥ Α.Ε (ΔΕΠΑ)9.1 ΕΠΕΚΤΑΣΗ ΤΕΡΜΑΤΙΚΟΥ ΣΤΑΘΜΟΥ LNG ΣΤΗ ΝΗΣΟ ΡΕΒΥΘΟΥΣΣΑ ως υπεργολάβοι της ΑΘΗΝΑ Α.Ε, Ανάδοχου των Έργων επέκτασης: Εγκατάσταση σωλήνωσης θαλάσσιου ύδατος από GPR διαμέτρου έως και 36’’, ολικού μήκους 520m. Η σύνδεση των προκατασκευασμένων τεμαχίων της σωλήνωσης γίνεται με μέθοδο Lamination και με κοχλιωτές συνδέσεις.10. ΔΙΕΘΝΕΣ ΑΕΡΟΔΡΟΜΙΟ ΑΘΗΝΩΝ. ΕΡΓΑ ΥΠΟΔΟΜΗΣ ΤΟΥ ΑΕΡΟΔΡΟΜΙΟΥ Ως υπεργολάβοι της J&P – ABAΞ A.E , Ανάδοχου Έργων Υποδομής:10.1 Εγκατάσταση 2000m αποχετευτικού αγωγού από σωλήνωση HDPE DN 110, που τρέχει παράλληλα με δρόμο διπλής κατεύθυνσης του αεροδρομίου.10.2 Αντικατάσταση γαλβανισμένων Σωληνώσεων με ανοξείδωτες σε 12 φρεάτια αντλήσεως λυμάτων. 1854 SC-1210.3 Μετατροπές στο σύστημα κρουνών ανεφοδιασμού καυσίμων (HRS) των stands αεροπλάνων (Loop D) για το Έργο ‘’Επέκταση Δορυφορικού Τερματικού Σταθμού (STB) 11. DOW HELLAS A.E. Θορικό, Λαύριο ΜΕΤΑΤΡΟΠΕΣ ΣΤΗΝ 1η ΓΡΑΜΜΗ ΠΑΡΑΓΩΓΗΣ STYROFOAM11.1 Ως Υπεργολάβοι της BECK & POLLITZER ENGINEERING Ltd.: Εκτέλεση των μηχανολογικών μετατροπών στην 1η γραμμή παραγωγής κατά το Shut Down του Ιουλίου 2001(job No KP-040097/CC-49.01),που περιλαμβάνει:• Προκατασκευή, εγκατάσταση, δοκιμές και βαφή των νέων σωληνογραμμών.• Αποξήλωση καταργούμενων σωληνώσεων και εξοπλισμού.

Page 20: Εταιρική Παρουσίαση - ALFA PI4 5. Άλφα Πι Εταιρική Παρουσίαση Alfa Pi Company Profile. ALFA PI S.A. is a Construction and Engineering Company,

38 39

• demolition of deleted pipework and equipment • assistance in installation of new equipment and commissioning of the 1st production line.11.2 As Contractors of DOW / KVAERNER PROCESS, for the same project :• Welding of Interconnecting Gel Line to Spline Mixer• Tubing between Heaters and Die (Job No. KP-040216 FPO-90.09)• Piping for BBA+ project (Job. No. KP-040216 FPO-90.10)11.3 Path 2 Foundation12. ALUMINIUM DE GRECE 12.1 Erection of Pipeworks for a 63t tilting and melting furnace in the Casting House of A.d.G factory in Ag. Nikolaos, Paralia Distomou, Boiotia, as subcontrac-tor of MECHATHERM INTERNATIONAL Ltd, UK, main contractor for the supply and the erection of the furnace. Work executed in 2006, including the following• Erection of Pipeworks for Hydraulic System.• Erection of Pipeworks for Pneumatic System.• Erection of Pipeworks for Combustion (H.F.C).• Erection of Pumping Unit for Hydraulic System.• Erection of Pumping Unit for Combustion System.• Insulation lagging of Pipeworks of Combustion System.12.2 Erection of pipeworks to a new 63t tilting and melting furnace similar to the one as above. Work executed in 200813. DIAXON S.A (member of EKO Industrial group) BOPP PACKAGING FILM PLANT, KOMOTINI As mechanical subcontractors of BRÜCKNER MASCHINENBAU GmbH, Siegs-dorf, Germany - Supplier of the BOPP (Bioriented Polypropylene) Packaging Film Plant. Each of the two production lines produces 20t. per shift, in 6.6m wide rolls contain-ing 60.000m. film per roll, weighing 7t. each 1st Stage : Utilities and 1st Production Line 1270 EKO Installation of Equipment and pipeworks for the following • RESIN SUPPLY, comprising the following systems :- Raw material, reception and storage- Drying, routing, dosing of raw materials and supply to Co-Extruders- Erection of Day Silos, Suction Conveyors, Dryers, Dosers and Extrusion Feeders• ORIENTER LINE 1270, comprising the following :- Extrusion System- Dye and Casting Units- MDO and TDO (Machine and Transverse Direction Orienters)- Pull Roll and Winder Units- Edge Trim Recycling System• Fresh Air Intake & Exhaust System • UTILITIES, comprising the following systems :- Cold and Chilled Water, including Chillers, Cooling Towers, Pumps, Heat Exchangers, Tanks and Headers.- Compressed Air, including Compressors, Pressure Drums, Filters, Dryers.- Thermal Oil, including Thermal Oil Boiler, Burners, Heating Units, Vessels and Chimney.- Fuel Oil, supply from and return to Fuel Oil Tanks.• PERIPHERAL SYSTEMS- Slitters

• Τεχνική βοήθεια στην εγκατάσταση του νέου εξοπλισμού και το commissioning της 1ης γραμμής παραγωγής.11.2 Ως υπεργολάβοι της DOW / KVAERNER PROCESS για :• Ηλεκτροκόλληση της διασύνδεσης Gel Line και Spline Mixer• Σωληνώσεις μεταξύ Heaters και Die (Job No. KP-040216 FPO-90.09)• Σωληνώσεις για το έργο BBA+ (Job. No. KP-040216 FPO-90.10)11.3 Path 2 Foundation12. ΑΛΟΥΜΙΝΙΟ ΤΗΣ ΕΛΛΑΔΟΣ Ως υπεργολάβοι της MECHATHERM INTERNATIONAL LTD UK, αναδόχου της προμήθειας και εγκατάστασης φούρνου τήξεως :12.1 Εγκατάσταση των σωληνώσεων ενός Φούρνου Τήξεως 63 t εις το Χυτήριο του Εργοστασίου στον Αγ. Νικόλαο Παραλία Διστόμου, Βοιωτίας, περιλαμβανομένων των: − σωληνώσεων Υδραυλικού Συστήματος− σωληνώσεων Πνευματικού Συστήματος.− σωληνώσεων Συστήματος Καυσίμων (H.F.C).− αντλητικής μονάδος υδραυλικού συστήματος.− αντλητικής μονάδος συστήματος καύσεως (H.F.C)− μόνωση των σωληνώσεων Συστήματος Καυσίμων (H.F.Ο).− Εργασίες εκτελεσθείσες το 200612.2 Εγκατάσταση των σωληνώσεων νέου Φούρνου Τήξεως, παρόμοιου με τον ανωτέρω Εργασία εκτελεσθείσες στο 200813. DIAXON ΑΕΒΕ (μέλος της ομάδας βιομηχανιών ΕΚΟ) ΕΡΓΟΣΤΑΣΙΟ ΠΑΡΑΓΩΓΗΣ ΒΟΡΡ ΜΕΜΒΡΑΝΗΣ ΠΕΡΙΤΥΛΙΞΕΩΣ, ΚΟΜΟΤΗΝΗ Ως Υπεργολάβος μηχανολογικών εργασιών της BRÜCKNER MASCHINENBAU, Siegsdorf, Γερμανία αναδόχου της προμήθειας και ανεγέρσεως του εξοπλισμού του Εργοστασίου παραγωγής μεμβράνης περιτυλίξεως πολυπροπυλενίου ΒΟΡΡ (με έλαση σε δυο διευθύνσεις), ημερησία παραγωγή εκάστης των δύο γραμμών είναι 20t. (ανά βάρδια), σε ρολούς πλάτους 6.6μ. των 60.000μ. (ανά ρολό), βάρους 7t. έκαστος Α’ Φάση : Περιφερειακές Υπηρεσίες και πρώτη γραμμή παραγωγής 1270 ΕΚΟ Εγκατάσταση μηχανολογικού εξοπλισμού και σωληνώσεων των κάτωθι:• Τροφοδοσία Ρητίνης που περιλαμβάνει συστήματα για - Υποδοχή και αποθήκευση πρώτων υλών- Ξήρανση, προώθηση, δοσολογία πρώτων υλών και τροφοδοσία των Co-extruders - Εγκατάσταση Δοχείων ημερήσιας κατανάλωσης, μεταφορικών ταινιών, ξηραντήρων, προσμεικτών και τροφοδοτών εξελάσεως• Γραμμή ORIENTER 1270, που αποτελείται εν σειρά από :- Σύστημα εξέλασης (extrusion)- Μονάδες χρωματισμού και χύτευσης (DIE & CASTING)- Μονάδες MDO και TDO (γραμμικής και πλευρικής ελάσεως)- Μονάδες έλξεως και περιελίξεως ρολών (PULL ROLL & WINDER)- Σύστημα συλλογής αποκομμάτων για ανακύκλωση• Συστήματα εξαερισμού• Συστήματα Υπηρεσιών :- Νερού ψύξεως και καταψύξεως, περιλαμβανομένων των CHILLERS, Πύργων ψύξεως, Αντλιών, Εναλλακτών, Δοχείων και Διανομέων- Πεπιεσμένου Αέρος, περιλαμβανομένων των συμπιεστών, πιεστικών δοχείων, φίλτρων και ξηραντών - Κύκλωμα Θερμού Ελαίου, περιλαμβανομένων του Ελαιόθερμου, καυστήρων θερμοεναλλακτών, δοχείων και καμινάδας- Υγρών καυσίμων με κύκλωματα παροχής και επιστροφής στις δεξαμενές καυσίμων

• Περιφεριακά συστήματα: - Slitters

Page 21: Εταιρική Παρουσίαση - ALFA PI4 5. Άλφα Πι Εταιρική Παρουσίαση Alfa Pi Company Profile. ALFA PI S.A. is a Construction and Engineering Company,

40 41

- Metallizer- Film Recycle System- Palet Packaging Line- Bridge Cranes (10ea) and Monorails (8ea)• Technical Assistance in commissioning and start-up activities The total weight of equipment as above is 550t. and that of piping to 65t. 2nd Stage : 2nd Production Line 1278 HEL. Installation of Equipment and Pipeworks of the following :• ORIENTER LINE 1278, comprising all systems as in line 1270, including the Resin supply for Main & Co-Extruder.• UTILITIES for the new line:- Thermal Oil System, including equipment as in line 1270- Extension of pipeworks for Cold and Chilled Water, Compressed Αir and Fuel Oil Supply and Return.- Bridge Cranes (3ea) and Monorails (8ea)• TECHNICAL ASSISTANCE In commissioning and start-up activities The total weight of equipment in line 1278 is 370t. and that of piping 35t.14. WATER SUPPLY & SEWAGE COMPANY FOR ATHENS GREATER AREA SE-WAGE TREATMENT PLANT AT PSITALLIA ISLAND14.1 Installation of 3 vaults over 3 sludge thickening pools. ALFA PI undertook as subcontractor of ADP Ltd, the erection of 3 prefabricated aluminum vaults, (manufactured by CTS BV, Holland), 29.3m in diameter and 4.0m high, over 3 sludge thickening pools in the Sewage Treatment Plant at Psital-lia Island of Saronic gulf.15. INSTALLATION OF ‘’VAPONO’’ ALUMINIUM FLOATING DECKS As subcontractors of POLITIS Ltd, in the following plants:15.1 MAMIDAKIS S.A., PETROL DISTRIBUTION CO, Thessaloniki Installation of 23m diam. Aluminium floating decks in two tanks in Kalohori Tank Farm 15.2 INTERCHEM, Chalkida Installation of 7m and 10m diam. floating deck in 6 tanks in Chalkida Plant.16. ATHENS MEDICAL CENTRE HOSPITAL, Marousi For the extension of the Medical Centre of Marousi in Athens, comprising:− the new 7 storey building,− new floor of luxury suites for VIP patients, over the existing building,− new Intensive Care a Unit, in the space for offices in existing building. ALFA PI undertook an mechanical installations, including the following :• Plumbing for hot and cold water supply, drainage, fire fighting, sewerage, AC cooling lines, medical gas supply, including the installation of relative equipment and fixtures.• Complete HVAC system.• Special A/C and sterilisation installations in Intensive care unit• Installations of all medical and laboratory equipment. Installations of special fixtures and equipment in luxury suite unit for VIP pa-tients,• Steel Constructions the bridge connecting the old and new buildings.• Interconnection of lines between old and new buildings.• Overall maintenance of mechanical installations of existing building.17. TASTY FOODS S.A., Kalamaki Attica Mechanical works equipmentation and Steel Structure for the Extension and Re-vamping

- Metalizers - Ανακύκλωση αποκομμάτων μεμβράνης - Γραμμή συσκευασίας Παλετών- Γερανογέφυρες (10τεμ) και μονοπάλαγκα(8τεμ)• Παροχή Υπηρεσιών στο commissioning και τη θέση λειτουργίας Το ολικό βάρος του εξοπλισμού ως άνω ανέρχεται στους 550t. και αυτό των σωληνώσεων σε 65t. Β’ Φάση : Δευτέρα Γραμμή Παραγωγής 1278 HEL. Εγκατάσταση εξοπλισμού και σωληνώσεων των κάτωθι :• Γραμμή ORIENTER 1278, που περιλαμβάνει όλα τα συστήματα ως και η γραμμή 1270, καθώς και το σύστημα τροφοδοσίας ρητίνης των EXTRUDERS της νέας γραμμής• Σύστημα Υπηρεσιών της νέας γραμμής :- Κύκλωμα Θερμού Ελαίου μετά του εξοπλισμού όπως για τη γραμμή 1270- Επέκταση σωληνώσεων για τα συστήματα Νερού Ψύξης και Κατάψυξης, Πεπιεσμένου Αέρα, παροχής και επιστροφής καυσίμων.− Γερανογέφυρες (3τεμ) και μονοπάλαγκα (8τεμ)• Παροχή Υπηρεσιών στο commissioning και τη θέση λειτουργίας Το ολικό βάρος του εξοπλισμού στη γραμμή 1278 είναι 370t. και των σωληνώσεων σε 35t.14. ΕΥΔΑΠ: ΕΓΚΑΤΑΣΤΑΣΕΙΣ ΒΙΟΛΟΓΙΚΟΥ ΚΑΘΑΡΙΣΜΟΥ, ΨΥΤΑΛΛΕΙΑ 14.1 Ανέγερση 3 θόλων σε 3 Δεξαμενές προπάχυνσης. Η ΑΛΦΑ ΠΙ ανέλαβε, ως Υπεργολάβος της Α.Δ.Π ΕΠΕ, την ανέγερση 3 προκατασκευασμένων θόλων εξ αλουμινίου (προμηθευτής CTS BV Ολλανδίας), διαμέτρου 28,5 m και ύψους 4m για την κάλυψη 3 Δεξαμενών προπάχυνσης ιλύος στις Εγκαταστάσεις Βιολογικού Καθαρισμού της ΕΥΔΑΠ στην νήσο Ψυτάλλεια.15. ΕΓΚΑΤΑΣΤΑΣΗ ΠΛΩΤΩΝ ΟΡΟΦΩΝ ‘’VACONO’’ΣΕ ΔΕΞΑΜΕΝΕΣ Ως Υπεργολάβοι της ΠΟΛΙΤΗΣ ΕΠΕ, στις κάτωθι εγκαταστάσεις15.1 ΜΑΜΙΔΑΚΗΣ Α.Ε., Θεσσαλονίκη Εγκατάσταση πλωτής οροφής ως εξ αλουμινίου διαμέτρου 23μ. σε δυο δεξαμενές στις πετρελαϊκές εγκαταστάσεις στις Θεσσαλονίκης. 15.2 INTERCHEM, Χαλκίδα Εγκατάσταση πλωτής οροφής διαμέτρου 7 και 10μ. σε έξι δεξαμενές στις εγκαταστάσεις Χαλκίδος. 16. ΙΑΤΡΙΚΟ ΚΕΝΤΡΟ/ ΑΘΗΝΩΝ, Μαρούσι Μηχανολογικές εγκαταστάσεις ως και εγκατάσταση ιατρικού εξοπλισμού στην επέκταση του Νοσοκομείου, που αποτελείται από : - Το νέο επταόροφο κτίριο- Νέο όροφο στο υπάρχον κτίριο για πολυτελή διαμερίσματα θεραπείας VIP ασθενών- Νέα μονάδα Εντατικής Θεραπείας στου χώρους γραφείων του παλαιού Κτιρίου Η εγκατάσταση περιλαμβάνει τα κάτωθι:• Δίκτυα σωληνώσεων παροχής θερμού και ψυχρού ύδατος, αποχετεύσεως λυμάτων και όμβριων, πυρόσβεσης, παροχής στον κλιματισμό, ιατρικών αερίων, ως και τις αντίστοιχες συσκευές και εξαρτήματα • Πλήρη συστήματα θέρμανσης κλιματισμού και εξαερισμού• Ειδικές εγκαταστάσεις κλιματισμού, αποστείρωσης κ.α. της Μονάδος Εντατικής Θεραπείας• Εγκατάσταση και σύνδεση ιατρικού εξοπλισμού• Ειδικές εγκαταστάσεις πολυτελών διαμερισμάτων θεραπείας VIP• Μεταλλική γέφυρα μεταξύ των κτιρίων • Διασύνδεση εγκαταστάσεων μεταξύ νέου και παλαιού κτηρίου • Ολοσχερής συντήρηση των εγκαταστάσεων του υπάρχοντος κτιρίου17. TASTY FOOD Α.Ε., Καλαμάκι Μηχανολογικές εργασίες, εγκαταστάσεις εξοπλισμού και σιδηροκατασκευές στην επέκταση

Page 22: Εταιρική Παρουσίαση - ALFA PI4 5. Άλφα Πι Εταιρική Παρουσίαση Alfa Pi Company Profile. ALFA PI S.A. is a Construction and Engineering Company,

42 43

of the installations in Potato Chips Product Plant in Kalamaki, comprising the following :• Erection of a stainless steel tank• Extension of two (2) packing lines• Pump and pipelines installation for potato washing system from the underground water table.• Installation of butane gas line• Steel Structures and platforms for the equipment• Installation of pumps for the frying oil circuit• Fencing and sheds in storage area18. VIANEX S.A., PHARMACEUTICAL INDUSTRY, Pallini Attica • Fire-fighting system • Cold and hot water network• Nitrogen and freon lines• Steam generator and lines19. IATRIKI TECHNIKI /MEDICAL TOOLS FACTORY, Corinth.• Mechanical and Εquipment Installation20. MULTI-STOREY CAR PARKING, 17 Ipsilantou Str., Piraeus • Plumping, Sewage, Air Venting and Fire Fighting Systems.21. DELTA MILK FACTORY, Tavros Athens as Subcontractors of ALTE S.A., main Contractor for the erection works in the ex-tension of Cold Spaces in TAVROS Plant.• Installation of pipeworks for the steam and ammonia systems.22. STEEL CENTER S.A., Aspropyrgos Attica• Rerouting of existing underground 8» fuel line of the Greek Airforce passing through the Employer’s property. It comprises : the supply, prefabrication, lining, placing and welding of the pipe-work, including required casing installation and all necessary NDT, Holidays & Pressure tests.23. OLYMPIC RACING CENTER & NEW ATHENS RACING YARD, Markopoulo -Attica As subcontractors of J/V ETETH -J&P AVAX -TERNA-PANTECHNIKI • Fire-fighting installation in electrical substation and pump house.• Generator fuel system and fume exhaust system.• Irrigation pumping compound installation.• Various steel constructions24. E.A.K.A.A. (FUEL PIPELINE TO ATHENS AIRPORT COMPANY).• Sundry piping and mechanical works for the pipeline 25. ETMA, SYNTHETIC SILK FIBRE INDUSTRY, Athens• Fire-fighting network• Amendment on methanol S.S. tank and its feeders• Various steel constructions26. LINDE HELLAS26.1 Mechanical Installation Units 201226.1 Mechanical Installation Units 201327. ERETRIA VILLAGE, Eretria/Evoia 4 star Tourist Complex:• Installation for water recirculation and filtration systems for the swimming pool complex.

εργοστασίου παραγωγής CHIPS στο Καλαμάκι που περιλαμβάνουν :• Εγκατάσταση ανοξείδωτης δεξαμενής• Επέκταση 2 γραμμών συστήματος συσκευασίας• Γραμμές και αντλιοστάσιο πλυσίματος πατάτας από υπόγειο ορίζοντα• Γραμμή αερίου• Σιδηροκατασκευές στήριξης και παταριών του εξοπλισμού• Εγκατάσταση ζεύγους αντλιών κυκλώματος λαδιού • Περίφραξη και στέγαστρα αποθηκευτικού χώρου18. ΒΙΑΝΕΞ, ΦΑΡΜΑΚΕΥΤΙΚΗ ΒΙΟΜΗΧΑΝΙΑ, Παλλήνη Αττικής• Εγκατάσταση συστήματος πυρόσβεσης• Δίκτυα κρύου και θερμού ύδατος• Δίκτυα ψύξης και παροχής αζώτου• Δίκτυα ατμού και εγκατάσταση ατμογεννήτριας 19. ΙΑΤΡΙΚΗ ΤΕΧΝΙΚΗ /ΕΡΓΟΣΤΑΣΙΟ ΙΑΤΡΙΚΩΝ ΕΡΓΑΛΕΙΩΝ, Κόρινθος Εγκατάσταση εξοπλισμού20. ΠΟΛΥΩΡΟΦΟ ΓΚΑΡΑΖ ΑΥΤΟΚΙΝΗΤΩΝ, Υψηλάντου 17, Πειραιάς• Εγκατάσταση υδραυλικών, αποχετεύσεων, πυρόσβεσης και εξαερισμού.21. ΒΙΟΜΗΧΑΝΙΑ ΓΑΛΑΚΤΟΣ ΔΕΛΤΑ, Ταύρος ως Υπεργολάβοι της ΑΛΤΕ ΑΤΕ, αναδόχου της επέκτασης των ψυγείων στις Εγκαταστάσεις του Ταύρου.• Εγκατάσταση σωληνώσεων των δικτύων ατμού και αμμωνίας στην επέκταση των ψυκτικών θαλάμων.22. ΚΕΝΤΡΟ ΧΑΛΥΒΩΝ ΑΕ, Ασπρόπυργος Αλλαγή πορείας του διερχόμενου αγωγού Φ6’’ καυσίμων της Ελληνικής Αεροπορίας εντός της ιδιοκτησίας του εργοδότη. Περιλαμβάνει την προμήθεια, προκατασκευή, μόνωση, συγκόλληση και τοποθέτηση της σωλήνωσης εντός νέας τάφρου, ως και τους απαιτούμενους ελέγχους ραδιογραφιών, Holiday και δοκιμή υπό πίεση της σωλήνωσης.23. ΟΛΥΜΠΙΑΚΟ ΙΠΠΙΚΟ ΚΕΝΤΡΟ / ΝΕΟΣ ΙΠΠΟΔΡΟΜΟΣ ΑΘΗΝΩΝ, Μαρκόπουλο ως Υπεργολάβοι της Κ/Ξ ΕΤΕΘ - J&P ΑΒΑΞ - ΤΕΡΝΑ - ΠΑΝΤΕΧΝΙΚΗ • Εγκατάσταση πυρόσβεσης υποσταθμού και αντλιοστασίου• Τροφοδοσία και απαγωγή καυσαερίων Η/Ζ• Εγκατάσταση πιεστικού συγκροτήματος άρδευσης• Διάφορες Σιδηροκατασκευές24. ΕΤΑΙΡΕΙΑ ΑΓΩΓΟΥ ΚΑΥΣΙΜΟΥ ΑΕΡΟΔΡΟΜΙΟΥ ΑΘΗΝΩΝ (ΕΑΚΑΑ) ΑΕ Σποραδικές σωληνουργικές και μηχανολογικές εργασίες στις εγκαταστάσεις του Αεροδρομίου Αθηνών. 25. ΕΤΜΑ, ΕΡΓΟΣΤΑΣΙΟ ΣΥΝΘΕΤΙΚΩΝ ΙΝΩΝ, Αθήνα• Δίκτυο πυρόσβεσης • Βελτιώσεις στην ανοξείδωτη Δεξαμενής Μεθανόλης και τους τροφοδότες της• Διάφορες Σιδηροκατασκευές26. LINDE HELLAS26.1 Διάφορες Μηχανολογικές εργασίες 201226.2 Διάφορες Μηχανολογικές εργασίες 201327. ERETRIA VILLAGE, Ερέτρια Ευβοίας Τουριστικό Συγκρότημα 4 αστέρων Εγκατάσταση Συστήματος ανακυκλοφορίας νερού και φιλτραρίσματος του συγκροτήματος κολυμβητικών δεξαμενών.

Page 23: Εταιρική Παρουσίαση - ALFA PI4 5. Άλφα Πι Εταιρική Παρουσίαση Alfa Pi Company Profile. ALFA PI S.A. is a Construction and Engineering Company,

44 45

28. US GOVERNMENT, DEPARTMENT OF THE NAVY, NAVAL SUPPORT ACTIVITY SOUDA BAY CRETE GREECE Petroleum Oil And Lubricant (POL) Renovation at NSA Souda Bay, Chania, Crete as Subcontractors of J&P AVAX SA29. VASILIKO OIL TANK PROJECT As subcontractors of BIOTEK CYPRUS LTD: GRP piping construction

28. US GOVERNMENT, DEPARTMENT OF THE NAVY, NAVAL SUPPORT ACTIVITY ΣΟΥΔΑ, ΧΑΝΙΑ,ΚΡΗΤΗ PETROLEUM OIL AND LUBRICANT (POL) RENOVATION ΣΤΗΝ ΝΑΥΤΙΚΗ ΒΑΣΗ ΣΟΥΔΑΣ, ΧΑΝΙΑ ΚΡΗΤΗ ως Υπεργολάβος της J&P AΒΑΞ ΑΕ29. VASILIKO OIL TANK PROJECT Ως υπεργολάβοι της BIOTEK CYPRUS LTD: Κατασκευή GRP σωληνώσεων

Page 24: Εταιρική Παρουσίαση - ALFA PI4 5. Άλφα Πι Εταιρική Παρουσίαση Alfa Pi Company Profile. ALFA PI S.A. is a Construction and Engineering Company,

4746

CLIENTIREM SPA

JOBElefsi’s Refinery Upgrade Project

Installation of steel structures, prefabrication and erection works on Unit 34 (Area 3)

ΠΕΛΑΤΗΣ IREM SPA

ΕΡΓΟ Aναβάθμιση Διυλιστηρίου ΕΛ. ΠΕ. ΒΕ. Ε.

Ανέγερση σιδηροκατασκευών, προκατασκευή & ανέγερση σωληνώσεων στην Μονάδα 34

ΕΛ. ΠΕ. Β. Ε. E.HEL. PE. E. I. C.

Page 25: Εταιρική Παρουσίαση - ALFA PI4 5. Άλφα Πι Εταιρική Παρουσίαση Alfa Pi Company Profile. ALFA PI S.A. is a Construction and Engineering Company,

48 49

Page 26: Εταιρική Παρουσίαση - ALFA PI4 5. Άλφα Πι Εταιρική Παρουσίαση Alfa Pi Company Profile. ALFA PI S.A. is a Construction and Engineering Company,

50 51

Page 27: Εταιρική Παρουσίαση - ALFA PI4 5. Άλφα Πι Εταιρική Παρουσίαση Alfa Pi Company Profile. ALFA PI S.A. is a Construction and Engineering Company,

52 53

Page 28: Εταιρική Παρουσίαση - ALFA PI4 5. Άλφα Πι Εταιρική Παρουσίαση Alfa Pi Company Profile. ALFA PI S.A. is a Construction and Engineering Company,

55

CLIENTHellenic Petroleum Aspropyrgos Industrial Complex

JOBInterconnection of compressor V-3201-B

Interconnection of flare gas recovery unit Z-5411 and other units in H.A.R

ΠΕΛΑΤΗΣ Ελληνικά Πετρέλαια Βιομηχανικές Εγκαταστάσεις Ασπροπύργου

ΕΡΓΟ Διασυνδέσεις μονάδας συμπιεστή V-3201B

Μονάδα ανάκτησης αερίου πυρσού Ζ-5411 και διασύνδεση με μονάδες των ΕΛΔΑ

ΕΛ. ΠΕ. Β. Ε. Α.HEL. PE. A. I. C.

54

Page 29: Εταιρική Παρουσίαση - ALFA PI4 5. Άλφα Πι Εταιρική Παρουσίαση Alfa Pi Company Profile. ALFA PI S.A. is a Construction and Engineering Company,

5756

CLIENTHellenic Petroleum Elefsis Industrial Complex (ex Petrola)

JOB3years contract for repairs and maintenance of furnaces and steam heaters

ΠΕΛΑΤΗΣ Ελληνικά Πετρέλαια Βιομηχανικές Εγκαταστάσεις Ελευσίνας (πρώην Πετρόλα)

ΕΡΓΟ Τριετής εργολαβία για τη συντήρηση και επισκευή φούρνων και ατμολεβήτων

ΕΛ. ΠΕ. Β. Ε. Ε. HΕL. PE. E. I. C.

Page 30: Εταιρική Παρουσίαση - ALFA PI4 5. Άλφα Πι Εταιρική Παρουσίαση Alfa Pi Company Profile. ALFA PI S.A. is a Construction and Engineering Company,

58 59

Page 31: Εταιρική Παρουσίαση - ALFA PI4 5. Άλφα Πι Εταιρική Παρουσίαση Alfa Pi Company Profile. ALFA PI S.A. is a Construction and Engineering Company,

60 61

Page 32: Εταιρική Παρουσίαση - ALFA PI4 5. Άλφα Πι Εταιρική Παρουσίαση Alfa Pi Company Profile. ALFA PI S.A. is a Construction and Engineering Company,

6362

ΠΕΛΑΤΗΣ Ελληνικά Πετρέλαια Νέο Εργοστάσιο Παραγωγής Ηλεκτρικής Ενέργειας CCPP στην Θεσσαλονίκη

ΕΡΓΟ Υπόγειες σωληνώσεις GRP, Φ600 λήψης και επιστροφής Θαλάσσιου ύδατος

CLIENTHellenic Petroleum New Power CCPP PlantΤhessaloniki

JOBSea water wntake and outfall line GRP 600mm

ΕΛ. ΠΕ. Β. Ε. Θ. HEL. PE. T. I. C.

Page 33: Εταιρική Παρουσίαση - ALFA PI4 5. Άλφα Πι Εταιρική Παρουσίαση Alfa Pi Company Profile. ALFA PI S.A. is a Construction and Engineering Company,

64 65

Page 34: Εταιρική Παρουσίαση - ALFA PI4 5. Άλφα Πι Εταιρική Παρουσίαση Alfa Pi Company Profile. ALFA PI S.A. is a Construction and Engineering Company,

66 67

Page 35: Εταιρική Παρουσίαση - ALFA PI4 5. Άλφα Πι Εταιρική Παρουσίαση Alfa Pi Company Profile. ALFA PI S.A. is a Construction and Engineering Company,

6968

CLIENTDiaxon (EKO Group) Komotini Plant

JOBInstallation of equipment and pipeworks of BOPP packaging film Plant in Komotini as Subcontractors of Βruckner Maschinenbau

ΠΕΛΑΤΗΣ Diaxon (πρώην EKO) Εμπορική και Βιομηχανική ΑΒΕΕ

ΕΡΓΟ Εγκατάσταση μηχανολογικού εξοπλισμού και σωληνώσεων του εργοταξίου παραγωγής μεμβράνης περιτυλίγματος ΒΟΡΡ της DIAXON στην Κομοτηνή, ως Υπεργολάβοι της Βruckner Maschinenbau

DiaxonDiaxon

Page 36: Εταιρική Παρουσίαση - ALFA PI4 5. Άλφα Πι Εταιρική Παρουσίαση Alfa Pi Company Profile. ALFA PI S.A. is a Construction and Engineering Company,

70 71

Page 37: Εταιρική Παρουσίαση - ALFA PI4 5. Άλφα Πι Εταιρική Παρουσίαση Alfa Pi Company Profile. ALFA PI S.A. is a Construction and Engineering Company,

7372

ΔΕΗ-Εργοστάσιο ΛαυρίουPublic Power Corporation-Lavrion Plant

CLIENTPublic Power Corporation, Lavrion Plant

JOBCombined power generation block (2 G.T+1 S.T) as subcontractor of BABCOCK ENERGY Ltd

ΠΕΛΑΤΗΣ ΔΕΗ Λαυρίου

ΕΡΓΟ Ηλεκτροπαραγωγικό συγκρότημα με συνδιασμένες πηγές ενέργειας (2 αεροστροβίλων και 1 ατμοστροβίλου) ως Υπεργολάβοι της BABCOCK ENERGY Ltd

Page 38: Εταιρική Παρουσίαση - ALFA PI4 5. Άλφα Πι Εταιρική Παρουσίαση Alfa Pi Company Profile. ALFA PI S.A. is a Construction and Engineering Company,

74 75

Page 39: Εταιρική Παρουσίαση - ALFA PI4 5. Άλφα Πι Εταιρική Παρουσίαση Alfa Pi Company Profile. ALFA PI S.A. is a Construction and Engineering Company,

7776

ΠΕΛΑΤΗΣ ΔΕΗ Ρόδου

ΕΡΓΟ Ανέγερση 3 Θερμικών μονάδων, 23,4ΜW εκάστη, στο Σταθμό Παραγωγής Σορωνής: αεραγωγοί, σιδηροκατασκευές στήριξης και ανέγερση εξοπλισμού για τα συστήματα εισδοχής αέρος και απαγωγής αερίων

CLIENTPublic Power Corporation, Rodos Plant

JOBErection of 3 thermal units, 23,4MW each in Power Plant of Soroni: ductworks, metallic support constructions and equipment erection in air intake and exhaust gas systems.

ΔΕΗ-Εργοστάσιο ΡόδουPublic Power Corporation-Rhodes Plant

Page 40: Εταιρική Παρουσίαση - ALFA PI4 5. Άλφα Πι Εταιρική Παρουσίαση Alfa Pi Company Profile. ALFA PI S.A. is a Construction and Engineering Company,

7978

CLIENTAthens Water Supply and Sewerage Company (EYDAP SA): Sewage Treatment Plant, Psuttalia Island

JOBInstallation of 3 aluminium vaults on 3 sludge thickening pools

ΠΕΛΑΤΗΣ ΕΥΔΑΠ: Εγκαταστάσεις Βιολογικού ΚαθαρισμούΨυττάλεια

ΕΡΓΟ Εγκαταστάσεις 3 Θόλων εξ αλουμινίου σε δεξαμενή προπάχυνσης

ΕΥΔΑΠEYDAP

Page 41: Εταιρική Παρουσίαση - ALFA PI4 5. Άλφα Πι Εταιρική Παρουσίαση Alfa Pi Company Profile. ALFA PI S.A. is a Construction and Engineering Company,

80

ΠΟΛΙΤΙΚΗ ΠΟΙΟΤΗΤΑΣΠρωταρχικός στόχος της Εταιρείας είναι να παρέχουμε υπηρεσίες υψηλών προδιαγραφών, έτσι ώστε οι προσφερόμενες υπηρεσίες να ικανοποιούν τις απαιτήσεις του πελάτη και να είναι χρηστικές και ασφαλής για τον τελικό χρήστη.

Με σκοπό να διασφαλισθεί η εφαρμογή της παραπάνω Πολιτικής Ποιότητας, η Εταιρεία ανέπτυξε και εφαρμόζει ένα Σύστημα Δια-χείρισης Ποιότητας, που περιλαμβάνει όλες τις λειτουργίες της, σύμφωνα με το Διεθνές Πρότυπο ISO 9001:2008.

Μέσω αυτού του Συστήματος η Εταιρεία μας έχει δεσμευτεί απέ-ναντι στους πελάτες της για τα εξής:Να πραγματοποιεί ότι δηλώνει ότι θα πραγματοποιηθεί.Να συμπεριφέρεται με ειλικρίνεια, συνέπεια και σεβασμό στους πελάτες της.Να προσφέρει αξία στους πελάτες της, μέσα από το επίπεδο των υπηρεσιών που προσφέρει.Να εστιάζει την προσοχή της στους πελάτες της, εξετάζοντας άμεσα τα παράπονά τους, αλλά και προβλέποντας τις επιθυμίες και τις απαιτήσεις τους.Να επενδύει στην εκπαίδευση και ανάπτυξη του ανθρώπινου δυναμικού της.Να ενθαρρύνει και να υποκινεί την δημιουργικότητα των εργα-ζομένων της.Να βελτιώνει συνεχώς την ποιότητα των υπηρεσιών της με την ενεργό συμμετοχή των εργαζομένων της.Να βελτιώνει συνεχώς την απόδοση της λειτουργίας της κάνο-ντας καλύτερη χρήση των πόρων της.Να εκσυγχρονίζει την οργάνωσή της για να ανταποκρίνεται στις αλλαγές του περιβάλλοντος.Να βελτιώνει την απόδοσή της με την διείσδυση σε νέες αγορές.Να ακολουθεί και να χρησιμοποιεί πρότυπες μεθόδους ελέγχου.

Με βάση τα ανωτέρω κάθε εργαζόμενος στην εταιρεία δεσμεύε-ται κάνοντας χρήση της εκπαίδευσης που του παρέχεται και των μέσων που τίθενται στην διάθεσή του να τηρεί τις Διαδικασίες του Συστήματος Διαχείρισης Ποιότητας και να συμβάλει στην διαρκή βελτίωσή του.

Η Πολιτική Ποιότητας ανασκοπείται οποτεδήποτε κριθεί ότι είναι αναγκαίο και εφαρμόζεται σε όλες τις συμβάσεις - συμφωνίες που η εταιρεία μας συνάπτει με τους πελάτες της. Θεωρείται τέ-λος απαραίτητο να τονισθεί ότι η εταιρεία μας συμμορφώνεται πλήρως με την εθνική και την κοινοτική νομοθεσία.

Ο Γενικός Διευθυντής Αναστάσιος Περιφάνης

QUALITY POLICYA fundamental objective of our Company is to provide high standard services, so that the offering services satisfy customer requirements and can be safely utilized by the final user.

For the purpose of ensuring the implementation of the Quality Policy, our Company has developed and applied a Quality Management System that covers all of its operations, according to the International Standard EN ISO 9001:2008.

Through this System, our Company has been committed towards its customers about the following:Realize whatever it states.Treat customers with due consideration, sincerity and consistency.Offer its customers value - for - money, high-quality services.Focus on its customers’ needs and demands, promptly attending to their complaints and satisfying their desires and requirements.Invest on the education and improvement of its human resources.Encourage and motivate its employees’ creativity.Constantly improve the quality of its services with the active participation of its employees.Constantly improve its performance and efficiency, making better use of its resources.Modernize its organization in order to meet increasing demands in a constantly shifting professional environment.Improve its output by entering new markets.Follow modern methods of control.

According to the above, each employee in the Company is committed to making use of the training provided and also by the means that are put in its disposal of observing the Processes of Quality Management System and of contributing in its constant improvement.

The Quality Policy is reviewed whenever it is considered necessary and it is implemented in all contracts between our Company and its customers.Finally, it is considered essential that our Company conforms entirely to both domestic and Community legislation.

The General Director Anastasios Perifanis